Data center campus
YTL Green Data Center Park
YTL Green Data Center Park is an AI data center campus developed by YTL AI Cloud in Johor, Kulai. 0.50 GW of capacity has been announced; 0.05 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Partially energized · YTL AI Cloud · Private land · Tenaga Nasional Berhad (TNB) · Kulai, Johor, Malaysia
Capacity: announced vs energized
Announced-to-energized gap: 0.45 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2026. Energized capacity is now on record. Claimed by YTL Power (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 0.50 GW | 2025-10-31 | reported | press release |
| Energized | 0.05 GW | 2025-10-31 | verified | journalist report |
| Under construction | 0.30 GW | 2025-10-31 | reported | press release |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Land
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on YTL Green Data Center Park. Pan or zoom out to see how close rivals are building.
- Announced capex
- $2.1B
- Cooling
- Liquid-cooled Nvidia GB200 Grace Blackwell (NVL72)
- Tenant
- YTL AI Cloud
- Cost per MW
- $4M/MW
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterJohor(10)
The deal
- developer
- YTL Power International / YTL Data Center Holdings · Owner-operator of the 1,640-acre park; runs YTL AI Cloud.
- tenant
- YTL AI Cloud · Sovereign/government and citizen AI services host on the first energized facility.
- chip supplier
- NVIDIA · Liquid-cooled GB200 NVL72 Grace Blackwell GPUs; strategic partner in the RM10bn project.
- tenant
- Sea Limited · Anchor tenant of the first phase (Sea Data Center), RM1.5 billion groundbreaking.
- developer
- YTL AI Cloud
Power
- Power source
- mixed
- Grid operator
- Tenaga Nasional Berhad (TNB)
- Interconnection
On-site solar plant, 0.50 GW solar, Under construction. 500 MW solar plant co-powering Malaysia's first renewable-powered hyperscale data center park.
National grid backup supply, 0.60 GW grid, Announced. 600 MW backup supply from the national grid (TNB).
Why here
YTL Green Data Center Park sits on private land in Johor, Kulai. It connects to the Tenaga Nasional Berhad (TNB) grid, draws on mixed power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- YTL Power - Nvidia AI data center project
- $2.1B. RM10bn YTL Power / Nvidia project at Kulai; part of a broader ~$4.3bn Malaysia buildout reported by DCD. journalist report
- Total project (YTL Power / Nvidia)
- RM10 billion total project value; USD not disclosed journalist report
- First-phase Sea Data Center investment
- RM1.5 billion first phase (up to 72 MW), anchored by Sea Ltd; USD not disclosed press release
Investment, workforce and specs
- Cooling
- Liquid-cooled Nvidia GB200 Grace Blackwell (NVL72) source
Timeline
- Aug 2026party linkedtenant: linked externalName "YTL AI Cloud" to company ytl-ai
- Sep 2026Current: Partially energized
Sources
- YTL Power completes first Nvidia-powered AI data centre in Johor, YTL AI Cloud now operational · The Edge Malaysia
- YTL Power completes Nvidia-powered AI data centre in Johor · W.Media
- Nvidia & YTL Power partner for $4.3bn AI data centers in Malaysia · Data Center Dynamics
- YTL Power stamping its mark on DC sector · The Star
6c37130e-35d9-4987-8196-9ab3f0882584 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is YTL Green Data Center Park?
How much power will YTL Green Data Center Park use?
Who is building YTL Green Data Center Park?
Is YTL Green Data Center Park operating yet?
How verified is the data on YTL Green Data Center Park?
Deploy Watch
Track YTL Green Data Center Park on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). YTL Green Data Center Park: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/ytl-green-data-center-park-kulai-johor
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/ytl-green-data-center-park-kulai-johor.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/ytl-green-data-center-park-kulai-johor
- Data documentation: /data
- Query this programmatically: Deploy MCP