Grid operator
AI data centers on the Tenaga Nasional Berhad (TNB) grid
Every tracked AI data center campus interconnecting to the Tenaga Nasional Berhad (TNB) grid, with combined announced-vs-energized capacity and the grid's live demand. Each figure is individually dated and sourced.
On this grid
Campuses
1
Announced (combined)
0.50 GW
Energized (combined)
0.05 GW
Campuses on this grid
| YTL Green Data Center Park | Kulai | partially energized | 0.50 | 0.05 |
See every campus on the national data center map, browse the full campus index, or read the verified-vs-claimed methodology.