{"id":"6c37130e-35d9-4987-8196-9ab3f0882584","slug":"ytl-green-data-center-park-kulai-johor","name":"YTL Green Data Center Park","aliases":[],"locationId":"ce12f299-2d7b-4120-88e3-c2a76f169ab3","lat":1.61593,"lng":103.51808,"locationPrecision":"exact","landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"Tenaga Nasional Berhad (TNB)","waterSourceNotes":null,"servingUtility":null,"acreage":1640,"totalBuildingSqft":null,"streetAddress":null,"notes":"1,640-acre hyperscale park in Kulai, Johor developed by YTL Power International / YTL Data Center Holdings, planned for up to 500MW and pitched as Malaysia's first hyperscale park co-powered by on-site solar (500MW solar plant plus ~600MW grid backup). YTL completed and energized its first Nvidia-powered facility (YTL AI Cloud, liquid-cooled GB200 NVL72 GPUs) on 31 Oct 2025; ~300MW is currently being built/commissioned toward full capacity within about two years. Part of a RM10bn (~$2.1bn) YTL-Nvidia project within a broader ~$4.3bn Malaysia buildout.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://theedgemalaysia.com/node/776142","title":"YTL Power completes first Nvidia-powered AI data centre in Johor, YTL AI Cloud now operational","sourceName":"The Edge Malaysia"},{"url":"https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/","title":"YTL Power completes Nvidia-powered AI data centre in Johor","sourceName":"W.Media"},{"url":"https://www.datacenterdynamics.com/en/news/nvidia-ytl-power-partner-for-43bn-ai-data-centers-in-malaysia/","title":"Nvidia & YTL Power partner for $4.3bn AI data centers in Malaysia","sourceName":"Data Center Dynamics"},{"url":"https://www.thestar.com.my/business/business-news/2026/06/29/ytl-power-stamping-its-mark-on-dc-sector","title":"YTL Power stamping its mark on DC sector","sourceName":"The Star"}],"reviewNote":null,"createdAt":"2026-08-17T18:12:12.630Z","updatedAt":"2026-08-29T22:17:37.000Z","location":{"id":"ce12f299-2d7b-4120-88e3-c2a76f169ab3","name":"Kulai","slug":"kulai-johor","kind":"city","parentLocationId":"cfe7e5c8-29d4-4bd5-ad0f-bb9d05caddc6","region":null,"lat":1.6615,"lng":103.6059,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T18:12:12.254Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"eea42d68-828a-4d5b-81d4-dd2ca97eb92d","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","companyId":null,"externalName":"YTL Power International / YTL Data Center Holdings","role":"developer","structureNotes":"Owner-operator of the 1,640-acre park; runs YTL AI Cloud.","createdAt":"2026-08-17T18:12:15.801Z","company":null},{"id":"d35f3726-feb9-4016-9348-2d92cc61b5ad","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","companyId":"423f5b3a-7d70-46bc-afe2-12d3b392d699","externalName":"YTL AI Cloud","role":"tenant","structureNotes":"Sovereign/government and citizen AI services host on the first energized facility.","createdAt":"2026-08-17T18:12:17.334Z","company":{"id":"423f5b3a-7d70-46bc-afe2-12d3b392d699","name":"YTL AI Cloud","slug":"ytl-ai"}},{"id":"b7710a32-fc88-440c-8db1-7fef53a24c42","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","companyId":"a9609061-00fd-4d9b-9b2d-ce2d772ab825","externalName":"Nvidia","role":"chip_supplier","structureNotes":"Liquid-cooled GB200 NVL72 Grace Blackwell GPUs; strategic partner in the RM10bn project.","createdAt":"2026-08-17T18:12:16.564Z","company":{"id":"a9609061-00fd-4d9b-9b2d-ce2d772ab825","name":"NVIDIA","slug":"nvidia"}},{"id":"234034a7-4fab-419e-85f3-ba3eab3f30a1","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","companyId":null,"externalName":"Sea Limited","role":"tenant","structureNotes":"Anchor tenant of the first phase (Sea Data Center), RM1.5 billion groundbreaking.","createdAt":"2026-08-19T01:33:39.560Z","company":null},{"id":"dcabe0cb-5ab5-4884-b8e8-13ff26757466","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","companyId":"423f5b3a-7d70-46bc-afe2-12d3b392d699","externalName":null,"role":"developer","structureNotes":null,"createdAt":"2026-08-27T22:22:43.797Z","company":{"id":"423f5b3a-7d70-46bc-afe2-12d3b392d699","name":"YTL AI Cloud","slug":"ytl-ai"}}],"capacityClaims":[{"id":"132ac123-bed9-48cb-b7e4-0ca95f94d120","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","series":"announced","valueGw":0.5,"asOf":"2025-10-31T00:00:00.000Z","sourceUrl":"https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Park planned for up to 500MW total capacity.","createdAt":"2026-08-17T18:12:13.316Z"},{"id":"d65785c4-818f-411b-b4e1-935b79eff34a","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","series":"energized","valueGw":0.048,"asOf":"2025-10-31T00:00:00.000Z","sourceUrl":"https://theedgemalaysia.com/node/776142","sourceType":"journalist_report","evidenceTier":"verified","supersedesId":null,"note":"YTL Power completed its first Nvidia GB200-powered facility (JDC1) Oct 31 2025, YTL AI Cloud live; first-phase IT load 48MW (expandable to 72MW), 32MW anchor tenant. Energized operational phase within the 600MW park plan; operational as of Aug 2026.","createdAt":"2026-08-17T18:33:49.118Z"},{"id":"f14dfa5f-a122-40b6-bec1-8bb39a4fd2fc","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","series":"under_construction","valueGw":0.3,"asOf":"2025-10-31T00:00:00.000Z","sourceUrl":"https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"~300MW being built and commissioned; full capacity expected within ~2 years.","createdAt":"2026-08-17T18:12:14.161Z"}],"financialClaims":[{"id":"e95c2df6-89f8-475b-8b08-e2ff892464f1","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","kind":"capex","label":"YTL Power - Nvidia AI data center project","valueUsd":"2100000000","capUsd":null,"conditions":"RM10bn YTL Power / Nvidia project at Kulai; part of a broader ~$4.3bn Malaysia buildout reported by DCD.","asOf":"2025-10-31T00:00:00.000Z","sourceUrl":"https://www.datacenterdynamics.com/en/news/nvidia-ytl-power-partner-for-43bn-ai-data-centers-in-malaysia/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-17T18:12:14.771Z"},{"id":"957bd789-ecda-4a1d-83e5-b3e6e1c7114b","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","kind":"capex","label":"Total project (YTL Power / Nvidia)","valueUsd":null,"capUsd":null,"conditions":"RM10 billion total project value; USD not disclosed","asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://theedgemalaysia.com/node/776142","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T01:33:36.395Z"},{"id":"6803478d-1f60-4a53-bcea-f49a83b8152b","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","kind":"capex","label":"First-phase Sea Data Center investment","valueUsd":null,"capUsd":null,"conditions":"RM1.5 billion first phase (up to 72 MW), anchored by Sea Ltd; USD not disclosed","asOf":"2023-06-01T00:00:00.000Z","sourceUrl":"https://www.mida.gov.my/media-release/ytl-data-centers-and-sea-break-ground-with-the-rm1-5bil-first-phase-of-the-500mw-ytl-green-data-center-park-in-johor/","sourceType":"press_release","evidenceTier":"verified","createdAt":"2026-08-19T01:33:37.160Z"}],"metricClaims":[{"id":"10dd78f3-bee5-421b-a730-7bca7b008ecd","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","metricType":"cooling_type","valueNumeric":null,"valueText":"Liquid-cooled Nvidia GB200 Grace Blackwell (NVL72)","unit":null,"grantingJurisdiction":null,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://theedgemalaysia.com/node/776142","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T01:33:38.798Z"}],"powerProjects":[{"id":"677d2252-f516-4948-87d8-7de222faf948","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","name":"On-site solar plant","type":"solar","capacityGw":0.5,"lifecycleState":"under_construction","sourceUrl":"https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/","evidenceTier":"reported","note":"500 MW solar plant co-powering Malaysia's first renewable-powered hyperscale data center park.","createdAt":"2026-08-19T01:33:37.920Z"},{"id":"a2cf106f-d902-4020-8438-6e9dd191e0f7","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","name":"National grid backup supply","type":"grid","capacityGw":0.6,"lifecycleState":"announced","sourceUrl":"https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/","evidenceTier":"reported","note":"600 MW backup supply from the national grid (TNB).","createdAt":"2026-08-19T01:33:38.301Z"}],"facilities":[],"incidents":[],"events":[{"id":"c8bbbf82-e804-4961-a675-fdef1ddc3ead","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"party_linked","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: linked externalName \"YTL AI Cloud\" to company ytl-ai","occurredAt":"2026-08-31T01:15:08.268Z","createdAt":"2026-08-31T01:15:08.268Z"},{"id":"1df15e0c-6ee6-4382-9ffb-46b83b231bc1","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: Sea Limited","occurredAt":"2026-08-19T01:33:39.947Z","createdAt":"2026-08-19T01:33:39.947Z"},{"id":"d86f2bd6-9d0d-4696-98e9-2415b8d6151a","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: First-phase Sea Data Center investment","occurredAt":"2026-08-19T01:33:37.541Z","createdAt":"2026-08-19T01:33:37.541Z"},{"id":"2b475c1b-5601-4416-8638-2e079c7fd20d","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Total project (YTL Power / Nvidia)","occurredAt":"2026-08-19T01:33:36.780Z","createdAt":"2026-08-19T01:33:36.780Z"},{"id":"7386c6e4-e5b9-4d87-9bdb-fbae92bf1774","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0.048","claimId":"d65785c4-818f-411b-b4e1-935b79eff34a","detail":null,"occurredAt":"2026-08-17T18:33:49.418Z","createdAt":"2026-08-17T18:33:49.418Z"},{"id":"88e65bb3-8be4-41dc-a07d-15aaa82caedf","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.048","claimId":"d65785c4-818f-411b-b4e1-935b79eff34a","detail":"verified · journalist_report","occurredAt":"2026-08-17T18:33:49.269Z","createdAt":"2026-08-17T18:33:49.269Z"},{"id":"a9b6aac3-25e2-41dc-85e8-2332b74c74fd","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: YTL AI Cloud","occurredAt":"2026-08-17T18:12:17.712Z","createdAt":"2026-08-17T18:12:17.712Z"},{"id":"ea47ab7c-0304-4565-8590-9507ec67ed3b","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"chip_supplier: Nvidia","occurredAt":"2026-08-17T18:12:16.946Z","createdAt":"2026-08-17T18:12:16.946Z"},{"id":"07bab3ce-5101-4adf-b3b9-32257daf7a9a","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: YTL Power International / YTL Data Center Holdings","occurredAt":"2026-08-17T18:12:16.186Z","createdAt":"2026-08-17T18:12:16.186Z"},{"id":"9341dfcc-4aed-4f48-84ae-46d968f5a371","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: YTL Power - Nvidia AI data center project","occurredAt":"2026-08-17T18:12:15.415Z","createdAt":"2026-08-17T18:12:15.415Z"},{"id":"2fca6c8b-277d-4a4d-8157-945eb9a3a918","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"0.3","claimId":"f14dfa5f-a122-40b6-bec1-8bb39a4fd2fc","detail":null,"occurredAt":"2026-08-17T18:12:14.542Z","createdAt":"2026-08-17T18:12:14.542Z"},{"id":"4891ac07-cabd-40c0-a634-bc212b8811fb","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.3","claimId":"f14dfa5f-a122-40b6-bec1-8bb39a4fd2fc","detail":"reported · press_release","occurredAt":"2026-08-17T18:12:14.316Z","createdAt":"2026-08-17T18:12:14.316Z"},{"id":"ba29ebcf-448e-4def-8877-74d6712dbc58","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.5","claimId":"132ac123-bed9-48cb-b7e4-0ca95f94d120","detail":null,"occurredAt":"2026-08-17T18:12:13.616Z","createdAt":"2026-08-17T18:12:13.616Z"},{"id":"4c6f8ba6-198b-4cdc-ac93-40273d1d5121","dataCenterId":"6c37130e-35d9-4987-8196-9ab3f0882584","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.5","claimId":"132ac123-bed9-48cb-b7e4-0ca95f94d120","detail":"reported · press_release","occurredAt":"2026-08-17T18:12:13.464Z","createdAt":"2026-08-17T18:12:13.464Z"}],"capacity_picture":{"announced_gw":0.5,"contracted_gw":null,"under_construction_gw":0.3,"energized_gw":0.048,"announced_minus_energized_gw":0.452,"by_series":{"announced":{"valueGw":0.5,"asOf":"2025-10-31T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/"},"contracted":null,"under_construction":{"valueGw":0.3,"asOf":"2025-10-31T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/"},"energized":{"valueGw":0.048,"asOf":"2025-10-31T00:00:00.000Z","evidenceTier":"verified","sourceUrl":"https://theedgemalaysia.com/node/776142"}}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"YTL Green Data Center Park","url":"https://registry.deploy.report/datacenters/ytl-green-data-center-park-kulai-johor","geo":{"@type":"GeoCoordinates","latitude":1.61593,"longitude":103.51808},"address":{"@type":"PostalAddress","addressLocality":"Kulai"}}}