# YTL Green Data Center Park

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 6c37130e-35d9-4987-8196-9ab3f0882584
- **Type:** AI data center campus
- **Location:** Kulai, Johor, Malaysia
- **Lifecycle state:** partially_energized
- **Announced capacity (GW):** 0.5
- **Energized capacity (GW):** 0.048
- **Announced-to-energized gap (GW):** 0.452

## Capacity ledger (append-only, dated, sourced)

- announced: 0.5 GW · reported · as of 2025-10-31 · https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/
- energized: 0.048 GW · verified · as of 2025-10-31 · https://theedgemalaysia.com/node/776142
- under_construction: 0.3 GW · reported · as of 2025-10-31 · https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/

## Parties

- YTL AI Cloud (tenant): https://registry.deploy.report/companies/ytl-ai
- NVIDIA (chip_supplier): https://registry.deploy.report/companies/nvidia
- YTL AI Cloud (developer): https://registry.deploy.report/companies/ytl-ai

## Common questions


**What is YTL Green Data Center Park?**

YTL Green Data Center Park is an AI data center campus tracked on the DEPLOY registry, located in Kulai. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will YTL Green Data Center Park use?**

YTL Green Data Center Park has 0.50 GW of announced capacity on the DEPLOY registry, of which 0.05 GW is recorded as energized, an announced-to-energized gap of 0.45 GW. Each figure is individually dated and sourced.

**Is YTL Green Data Center Park operating yet?**

As of the most recent verification on the DEPLOY registry, YTL Green Data Center Park is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on YTL Green Data Center Park?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- YTL Power completes first Nvidia-powered AI data centre in Johor, YTL AI Cloud now operational: https://theedgemalaysia.com/node/776142
- YTL Power completes Nvidia-powered AI data centre in Johor: https://w.media/ytl-power-completes-nvidia-powered-ai-data-centre-in-johor/
- Nvidia & YTL Power partner for $4.3bn AI data centers in Malaysia: https://www.datacenterdynamics.com/en/news/nvidia-ytl-power-partner-for-43bn-ai-data-centers-in-malaysia/
- YTL Power stamping its mark on DC sector: https://www.thestar.com.my/business/business-news/2026/06/29/ytl-power-stamping-its-mark-on-dc-sector

Canonical: https://registry.deploy.report/datacenters/ytl-green-data-center-park-kulai-johor
JSON: https://registry.deploy.report/v1/datacenters/ytl-green-data-center-park-kulai-johor
