Data center campus
YTL Green Data Center Park Kulai
YTL Green Data Center Park Kulai is a tracked AI data center campus in Johor, Kulai. YTL Power's flagship AI DC campus in Kulai, Johor, hosting Nvidia cloud computing infrastructure. Initial 500 MW plan with public commitment to double capacity within three years of the April 2026 announcement.
Partially energized · YTL AI Cloud · YTL-owned within Sedenak Tech Park area · Tenaga Nasional Berhad · Kulai, Johor, Malaysia
Capacity: announced vs energized
| Source |
|---|
Key facts
Lifecycle
Energized
Developer
Location
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- IT capacity
- 500 MW (500 MW initially planned; April 2026 announcement targets doubling to ~1,000 MW within three years; first phase supporting Nvidia workloads is operational)
- Named tenants
- Nvidia, GDS (SEA)
- Grid operator
- Tenaga Nasional Berhad
- Serving utility
- YTL Power (self-generation adjacent)
On the data center map
Every tracked data center is on this map, centered on YTL Green Data Center Park Kulai. Pan or zoom out to see how close rivals are building.
In clusterJohor(10)
The deal
- developer
- YTL AI Cloud
Power
- Power source
- grid
- Grid operator
- Tenaga Nasional Berhad
- Interconnection
Why here
YTL Green Data Center Park Kulai sits on ytl-owned within sedenak tech park area in Johor, Kulai. It connects to the Tenaga Nasional Berhad grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Sources
543a4213-068b-4ad5-8fae-1698d40407fa · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is YTL Green Data Center Park Kulai?
Who is building YTL Green Data Center Park Kulai?
Is YTL Green Data Center Park Kulai operating yet?
How verified is the data on YTL Green Data Center Park Kulai?
Deploy Watch
Track YTL Green Data Center Park Kulai on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). YTL Green Data Center Park Kulai: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/ytl-ai-ytl-green-data-center-park-kulai
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/ytl-ai-ytl-green-data-center-park-kulai.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/ytl-ai-ytl-green-data-center-park-kulai
- Data documentation: /data
- Query this programmatically: Deploy MCP