DEPLOY

Data center campus

YTL Green Data Center Park Kulai

YTL Green Data Center Park Kulai is a tracked AI data center campus in Johor, Kulai. YTL Power's flagship AI DC campus in Kulai, Johor, hosting Nvidia cloud computing infrastructure. Initial 500 MW plan with public commitment to double capacity within three years of the April 2026 announcement.

Partially energized · YTL AI Cloud · YTL-owned within Sedenak Tech Park area · Tenaga Nasional Berhad · Kulai, Johor, Malaysia


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
YTL Green Data Center Park Kulai capacity claims
Source

Key facts

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
500 MW (500 MW initially planned; April 2026 announcement targets doubling to ~1,000 MW within three years; first phase supporting Nvidia workloads is operational)
Named tenants
Nvidia, GDS (SEA)
Grid operator
Tenaga Nasional Berhad
Serving utility
YTL Power (self-generation adjacent)

On the data center map

Every tracked data center is on this map, centered on YTL Green Data Center Park Kulai. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

In clusterJohor(10)

The deal

developer
YTL AI Cloud

Power

Power source
grid
Interconnection

Why here

YTL Green Data Center Park Kulai sits on ytl-owned within sedenak tech park area in Johor, Kulai. It connects to the Tenaga Nasional Berhad grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

543a4213-068b-4ad5-8fae-1698d40407fa · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is YTL Green Data Center Park Kulai?
YTL Green Data Center Park Kulai is an AI data center campus tracked on the DEPLOY registry, located in Kulai. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building YTL Green Data Center Park Kulai?
YTL AI Cloud is recorded as a party to YTL Green Data Center Park Kulai on the DEPLOY registry. The full party list, with each role, is on the record.
Is YTL Green Data Center Park Kulai operating yet?
As of the most recent verification on the DEPLOY registry, YTL Green Data Center Park Kulai is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on YTL Green Data Center Park Kulai?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track YTL Green Data Center Park Kulai on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). YTL Green Data Center Park Kulai: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/ytl-ai-ytl-green-data-center-park-kulai

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces