Data center campus
Data City (Energy Abundance)
Data City is an AI data center campus developed by Energy Abundance Development Corporation in Texas, Laredo. 5 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Announced · Energy Abundance Development Corporation · greenfield · ERCOT · Laredo, Texas, United States
Capacity: announced vs energized
Announced-to-energized gap: 5 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2026. 3 months away. Claimed by Energy Abundance Development Corporation (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 5 GW | 2025-04-07 | claimed | press release |
Key facts
Lifecycle
Announced
Energized
Energy Abundance Development Corporation
Developer
Location
Grid
Land
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on Data City. Pan or zoom out to see how close rivals are building.
- Cooling
- District cooling; power-dense racking optimized for NVIDIA chips; dual-fuel gas turbines transitioning to 100% green hydrogen from adjacent 2 TWh Hydrogen City salt-dome storage
- Grid
- ERCOT · Fully islanded from ERCOT: the campus runs on its own wind, solar, batteries and dual-fuel gas turbines, intended to shift to green hydrogen over time, drawing on the adjacent Hydrogen City salt dome storage of about 2 TWh. It opens at 300 MW across 1 million square feet in 2026 against a 5 GW ambition.
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterTexas(607)
The deal
- developer
- Energy Abundance Development Corporation
Power
- Power source
- mixed
- Grid operator
- ERCOT
- Interconnection
- Fully islanded from ERCOT: the campus runs on its own wind, solar, batteries and dual-fuel gas turbines, intended to shift to green hydrogen over time, drawing on the adjacent Hydrogen City salt dome storage of about 2 TWh. It opens at 300 MW across 1 million square feet in 2026 against a 5 GW ambition.
- Water
- Not published. The launch release describes a centralised district cooling system built around direct-to-chip liquid cooling, and says nothing about where the water comes from or how much is needed, on a 50,000 acre site in a part of Texas where that is the question.
Data City on-site generation, solar, Announced. Wind + solar + battery + dual-fuel gas turbines to hydrogen; capacities not itemized
The Texas (ERCOT) grid demand right now: 52.0 GW (EIA-930, 2026-09-27 10:00). Data City's announced 5 GW would be 9.6% of the grid's current load.
County water status: Severe drought (D2) in Webb County, week of 2026-09-08 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Data City sits on greenfield in Texas, Laredo. It connects to the ERCOT grid, draws on mixed power, interconnection is Fully islanded from ERCOT: the campus runs on its own wind, solar, batteries and dual-fuel gas turbines, intended to shift to green hydrogen over time, drawing on the adjacent Hydrogen City salt dome storage of about 2 TWh. It opens at 300 MW across 1 million square feet in 2026 against a 5 GW ambition.. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
- Cooling
- District cooling; power-dense racking optimized for NVIDIA chips; dual-fuel gas turbines transitioning to 100% green hydrogen from adjacent 2 TWh Hydrogen City salt-dome storage source
Timeline
- Aug 2026party addeddeveloper: Energy Abundance Development Corporation
- Sep 2026Current: Announced
Sources
- Energy Abundance Announces Data City, Texas
- Up to 5GW data center with behind-the-meter hydrogen power planned for Laredo, Texas
a6b4ec9e-0a60-4e81-92a2-cbd514edd057 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Data City (Energy Abundance)?
How much power will Data City (Energy Abundance) use?
Who is building Data City (Energy Abundance)?
Is Data City (Energy Abundance) operating yet?
How verified is the data on Data City (Energy Abundance)?
Deploy Watch
Track Data City (Energy Abundance) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Data City (Energy Abundance): AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/energy-abundance-data-city-laredo-webb-texas
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/energy-abundance-data-city-laredo-webb-texas.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/energy-abundance-data-city-laredo-webb-texas
- Data documentation: /data
- Query this programmatically: Deploy MCP