Amazon 'Bridgefield' GWU Ashburn Campus is a tracked AI data center campus in Virginia, Ashburn. Amazon Data Services plan to redevelop the former George Washington University Virginia Science & Technology Campus in Ashburn, Loudoun County (Route 28 Tax District): 111-122 acres, over 800,000 sq ft across four two-st
Announced · Amazon · Brownfield · PJM · Ashburn, Virginia, United States
Capacity: announced vs energized
| Source |
|---|
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Site plan (Sep 2026)
- Loudoun accepted plan Sep 23 2026 for four buildings, about 805,000 sq ft
- Zoning dispute (reported)
- Amazon seeks by-right approval; county officials want special exception review
- Data center plan dropped (county-stated, Oct 2026)
- Oct 20 2026 preliminary deal: Amazon intends to withdraw its data center application, give the county 25 acres and $5M, and pursue housing on the rest. Final agreements pending.
On the data center map
Every tracked data center is on this map, centered on Amazon 'Bridgefield' GWU Ashburn Campus. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
- Announced capex
- $427M
- Land owner
- George Washington University
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterVirginia(342)
The deal
- utility
- Dominion Energy · Route 28 Tax District
- developer
- Amazon · purchased GWU campus for $427.3M
- land owner
- George Washington University · Seller of the 111-acre Virginia Science & Technology Campus to Amazon for $427.3M (closed March 2026); permitted to operate on-site up to 5 years
Power
- Power source
- grid
- Grid operator
- PJM
- Interconnection
The PJM grid demand right now: 95.4 GW (EIA-930, 2026-11-11 23:00).
County water status: Abnormally dry (D0) in Loudoun County, week of 2026-11-03 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Silicon on site
Every AI chip publicly attributed to Amazon 'Bridgefield' GWU Ashburn Campus on the DEPLOY registry. Quantity hints are unstructured because underlying disclosures vary by an order of magnitude. Source links per row.
- as of 2024-12-03
AWS Trainium 2 capacity across the Ashburn / GWU Bridgefield campus
inferredAWS deploys Trainium 2 across its US-East-1 flagship region; per-campus counts not published.
Why here
Amazon 'Bridgefield' GWU Ashburn Campus sits on brownfield in Virginia, Ashburn. It connects to the PJM grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- GWU Virginia Science & Tech Campus land acquisition
- $427M. Amazon Data Services purchase of the 111-acre former GWU campus in Ashburn; Amazon to honor GWU operations for up to 5 years before construction journalist report
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Aug 2026party addedland_owner: George Washington University
- Nov 2026Current: Announced
Sources
- Amazon data center campus plan for Ashburn hits Loudoun opposition
- Amazon proposes building over 800,000 square feet of data centers on GW's Virginia campus
- GWU Neighbors Raise Concerns Over Amazon Data Center Plan as County Pursues Opposition
- Preliminary Agreement with Amazon Prevents Data Centers, Fast Tracks Housing at GWU Campus in Loudoun · Loudoun County
- Amazon withdraws proposal to build data centers on GW campus in Loudoun County · WTOP News
- Amazon proposes up to 1,500 housing units on Virginia campus in place of data centers · The GW Hatchet
e8b1e61f-5ea1-46f1-8667-a4bde94f2409 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Amazon 'Bridgefield' GWU Ashburn Campus?
Who is building Amazon 'Bridgefield' GWU Ashburn Campus?
Is Amazon 'Bridgefield' GWU Ashburn Campus operating yet?
How verified is the data on Amazon 'Bridgefield' GWU Ashburn Campus?
Deploy Watch
Track Amazon 'Bridgefield' GWU Ashburn Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Amazon 'Bridgefield' GWU Ashburn Campus: AI data center campus record. Retrieved November 12, 2026, from https://registry.deploy.report/datacenters/amazon-gwu-ashburn-loudoun-virginia
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/amazon-gwu-ashburn-loudoun-virginia.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/amazon-gwu-ashburn-loudoun-virginia
- Data documentation: /data
- Query this programmatically: Deploy MCP