Data center campus
Amazon (AWS) Boardman Data Center Campus
Amazon (AWS) Boardman Data Center Campus is an AI data center campus developed by Amazon in Oregon, Boardman. 1 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Partially energized · Amazon · greenfield · WECC · Boardman, Oregon, United States
Capacity: announced vs energized
Announced-to-energized gap: 1 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 1 GW | 2026-03-30 | reported | journalist report |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Grid
Land
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on Amazon (AWS) Boardman Data Center Campus. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
- Announced capex
- $30B
- Jobs
- 7,400 permanent reported
- Cost per MW
- $30M/MW
- Cost per job
- $4M per permanent job
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterOregon(85)
The deal
- utility
- PacifiCorp (Pacific Power) · Local retail utility
- utility
- Bonneville Power Administration · Regional balancing authority (WECC)
- operator
- Amazon
Power
- Power source
- mixed
- Grid operator
- WECC
- Interconnection
Bloom Energy fuel cells (Morrow County AWS site), 0.02 GW gas, Announced. Reported ~24 MW behind-the-meter fuel cells supplementing a site with ~40 MW grid available.
County water status: Extreme drought (D3) in Morrow County, week of 2026-09-08 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Amazon (AWS) Boardman Data Center Campus sits on greenfield in Oregon, Boardman. It connects to the WECC grid, draws on mixed power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
Timeline
- Aug 2026party addedutility: Bonneville Power Administration
- Sep 2026Current: Partially energized
Sources
- Morrow County OKs $1 billion deal in tax breaks with Amazon
- Amazon to receive $1 billion in tax breaks in eastern Oregon for new data centers
11de3cbb-092d-403c-86fb-37f506ab6361 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Amazon (AWS) Boardman Data Center Campus?
How much power will Amazon (AWS) Boardman Data Center Campus use?
Who is building Amazon (AWS) Boardman Data Center Campus?
Is Amazon (AWS) Boardman Data Center Campus operating yet?
How verified is the data on Amazon (AWS) Boardman Data Center Campus?
Deploy Watch
Track Amazon (AWS) Boardman Data Center Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Amazon (AWS) Boardman Data Center Campus: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/amazon-boardman-morrow-county
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/amazon-boardman-morrow-county.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/amazon-boardman-morrow-county
- Data documentation: /data
- Query this programmatically: Deploy MCP