{"id":"11de3cbb-092d-403c-86fb-37f506ab6361","slug":"amazon-boardman-morrow-county","name":"Amazon (AWS) Boardman Data Center Campus","aliases":["AWS Boardman","Amazon Boardman Cloud"],"locationId":"c708fa92-be3e-46ab-8480-28d973a1fa3a","lat":45.84,"lng":-119.702,"locationPrecision":"city","landStatus":"greenfield","lifecycleState":"partially_energized","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"WECC","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"AWS operates multiple data centers in Morrow County near the Port of Morrow with a much larger planned buildout (reported up to ~1,000 MW across ~20 buildings). Morrow County approved a ~$1B tax-abatement package (2023). Exact operational MW per building and the firm schedule for remaining approved facilities are not public; the 1,000 MW figure is a full-campus planning projection, not energized load.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.opb.org/article/2023/05/19/amazon-data-center-oregon-morrow-county/","date":"2023-05-19","title":"Morrow County OKs $1 billion deal in tax breaks with Amazon","publisher":"OPB"},{"url":"https://www.kgw.com/article/news/local/eastern-oregon/amazon-1-billion-tax-breaks-eastern-oregon-new-data-centers/283-8a8e3b9f-7846-49b2-9731-9b5c32a6537b","date":"2023-05-19","title":"Amazon to receive $1 billion in tax breaks in eastern Oregon for new data centers","publisher":"KGW"}],"reviewNote":null,"createdAt":"2026-08-17T20:25:00.293Z","updatedAt":"2026-08-28T14:22:23.889Z","location":{"id":"c708fa92-be3e-46ab-8480-28d973a1fa3a","name":"Boardman","slug":"boardman-oregon","kind":"city","parentLocationId":"f7d56e51-36fd-4beb-b462-aa645f88e331","region":"Oregon","lat":45.84,"lng":-119.702,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:24:59.911Z","updatedAt":"2026-08-21T18:00:07.892Z"},"parties":[{"id":"2892e7a1-4a49-4b18-b553-57dc9f1a4eba","dataCenterId":"11de3cbb-092d-403c-86fb-37f506ab6361","companyId":null,"externalName":"PacifiCorp (Pacific Power)","role":"utility","structureNotes":"Local retail utility","createdAt":"2026-08-17T20:25:02.717Z","company":null},{"id":"29c59fcd-f12e-45f9-a4de-eafc51e930b9","dataCenterId":"11de3cbb-092d-403c-86fb-37f506ab6361","companyId":null,"externalName":"Bonneville Power Administration","role":"utility","structureNotes":"Regional balancing authority (WECC)","createdAt":"2026-08-17T20:25:03.488Z","company":null},{"id":"621305ba-beb1-4cae-99f7-9b99970fc4d2","dataCenterId":"11de3cbb-092d-403c-86fb-37f506ab6361","companyId":"b9b40dbf-7909-4d29-9bd9-e23f21bf06f9","externalName":"Amazon Web Services","role":"operator","structureNotes":null,"createdAt":"2026-08-17T20:25:01.956Z","company":{"id":"b9b40dbf-7909-4d29-9bd9-e23f21bf06f9","name":"Amazon","slug":"amazon"}}],"capacityClaims":[{"id":"56de9ec9-df43-4402-b976-19837a3dbab1","dataCenterId":"11de3cbb-092d-403c-86fb-37f506ab6361","series":"announced","valueGw":1,"asOf":"2026-03-30T00:00:00.000Z","sourceUrl":"https://www.geekwire.com/2026/report-amazon-buys-1300-acres-near-columbia-river-that-could-become-a-giant-data-center/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"~1 GW full campus. Original claimant: Morrow County land-use filing (Johnson Economics) for Amazon; access source GeekWire/The Oregonian.","createdAt":"2026-08-17T20:25:01.051Z"}],"financialClaims":[],"metricClaims":[{"id":"45d7c9d9-5bad-4f48-9d58-f0018cbdd0d1","dataCenterId":"11de3cbb-092d-403c-86fb-37f506ab6361","metricType":"capex_usd","valueNumeric":30000000000,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://www.aboutamazon.com/news/aws/amazon-web-services-data-centers-us","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility aws-morrow-boardman","createdAt":"2026-08-18T13:51:43.086Z"},{"id":"8723e0f2-ef5a-4799-b8ab-575b69ddc7a3","dataCenterId":"11de3cbb-092d-403c-86fb-37f506ab6361","metricType":"jobs_permanent","valueNumeric":7400,"valueText":null,"unit":null,"grantingJurisdiction":null,"asOf":"2026-01-01T00:00:00.000Z","sourceUrl":"https://www.aboutamazon.com/news/aws/amazon-web-services-data-centers-us","sourceType":"operator_page","evidenceTier":"reported","supersedesId":null,"note":"migrated from Tier2 facility aws-morrow-boardman","createdAt":"2026-08-18T13:51:43.855Z"}],"powerProjects":[{"id":"a05a31cc-a874-4af3-bcca-6fcd12477a0f","dataCenterId":"11de3cbb-092d-403c-86fb-37f506ab6361","name":"Bloom Energy fuel cells (Morrow County AWS site)","type":"gas","capacityGw":0.024,"lifecycleState":"announced","sourceUrl":"https://www.opb.org/article/2023/05/19/amazon-data-center-oregon-morrow-county/","evidenceTier":"reported","note":"Reported ~24 MW behind-the-meter fuel cells supplementing a site with ~40 MW grid available.","createdAt":"2026-08-17T20:25:01.583Z"}],"facilities":[],"incidents":[],"events":[{"id":"a0917b44-2be1-4f5f-a149-ee1e3afd06a0","dataCenterId":"11de3cbb-092d-403c-86fb-37f506ab6361","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Bonneville Power Administration","occurredAt":"2026-08-17T20:25:03.876Z","createdAt":"2026-08-17T20:25:03.876Z"},{"id":"5d028bbb-2133-49eb-9a85-00947040b489","dataCenterId":"11de3cbb-092d-403c-86fb-37f506ab6361","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: PacifiCorp (Pacific Power)","occurredAt":"2026-08-17T20:25:03.106Z","createdAt":"2026-08-17T20:25:03.106Z"},{"id":"0eb59a0b-7b23-4b9c-9e99-2c9a44bb6229","dataCenterId":"11de3cbb-092d-403c-86fb-37f506ab6361","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Amazon Web Services","occurredAt":"2026-08-17T20:25:02.335Z","createdAt":"2026-08-17T20:25:02.335Z"},{"id":"73eff92b-3960-41f9-84d4-8b984af56330","dataCenterId":"11de3cbb-092d-403c-86fb-37f506ab6361","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1","claimId":"56de9ec9-df43-4402-b976-19837a3dbab1","detail":null,"occurredAt":"2026-08-17T20:25:01.356Z","createdAt":"2026-08-17T20:25:01.356Z"},{"id":"9132187b-16b6-44db-b816-6c86d63db3ff","dataCenterId":"11de3cbb-092d-403c-86fb-37f506ab6361","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1","claimId":"56de9ec9-df43-4402-b976-19837a3dbab1","detail":"reported · journalist_report","occurredAt":"2026-08-17T20:25:01.205Z","createdAt":"2026-08-17T20:25:01.205Z"}],"capacity_picture":{"announced_gw":1,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":1,"by_series":{"announced":{"valueGw":1,"asOf":"2026-03-30T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.geekwire.com/2026/report-amazon-buys-1300-acres-near-columbia-river-that-could-become-a-giant-data-center/"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Amazon (AWS) Boardman Data Center Campus","url":"https://registry.deploy.report/datacenters/amazon-boardman-morrow-county","geo":{"@type":"GeoCoordinates","latitude":45.84,"longitude":-119.702},"address":{"@type":"PostalAddress","addressLocality":"Boardman"}}}