Data center campus
Nebius Vineland AI Data Center
Nebius Vineland AI Data Center is an AI data center campus developed by DataOne in New Jersey, Vineland. 0.30 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Partially energized · DataOne · Private land · PJM · Vineland, New Jersey, United States
Capacity: announced vs energized
Announced-to-energized gap: 0.30 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2026. 3 months away. Claimed by Nebius / Bloom Energy (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 0.30 GW | 2025-09-01 | claimed | press release |
Key facts
Lifecycle
Announced
Energized
DataOne
Developer
Location
Grid
Land
Announced-to-energized gap
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Host operator NJDEP air penalty (Sep 2026)
- NJDEP assessed DataOne $1,072,000 for installing/operating 62 Caterpillar G3516H natural-gas generators at the Vineland facility (3963 S Lincoln Ave) without air permits (inspection Jul 29 2026). Facility is the DataOne-built Vineland site tied to Nebius. Penalty assessed, not confirmed paid.
- DataOne response + 45-day continue window (reported Sep 2026)
- Reported (reported): NJDEP is allowing the 62 unpermitted Caterpillar G3516H generators to keep running while DataOne has 45 days to obtain required air permits or cease. DataOne told Floodlight it disagrees with the temporary-generator determination but will apply for permits and is transitioning toward approved fuel cells. Cap: Floodlight + company spokesperson; detailed facts also on company dataone
On the data center map
Every tracked data center is on this map, centered on Nebius Vineland AI Data Center. Pan or zoom out to see how close rivals are building.
In clusterNew Jersey(88)
The deal
- operator
- Nebius Group N.V. · Ticker NBIS; build-to-suit model
- offtaker
- Microsoft · Multi-year GPU capacity agreement, up to ~$17.4B total contract value through 2031 per 20-F
- chip supplier
- NVIDIA · Blackwell GPUs
- developer
- DataOne · Build-to-suit developer of the Vineland facility (branded 'DataOne: Vineland, NJ'); first phase built in ~20 weeks in 2025
- utility
- Bloom Energy · On-site solid oxide fuel-cell power provider; 10-year master agreement up to $2.6B, 328 MW installed / ~250 MW guaranteed, targeted online 2026
Power
- Power source
- behind the meter gas
- Grid operator
- PJM
- Interconnection
Vineland on-site Bloom Energy fuel cells / gas engines, gas, Under construction. Behind-the-meter generation; exact MW not disclosed
Bloom Energy solid oxide fuel cells (Nebius US master agreement), 0.33 GW gas, Under construction. 328 MW installed / ~250 MW guaranteed of on-site behind-the-meter solid oxide fuel cells (natural gas / on-site LNG), targeted online in 2026 under a 10-year master agreement worth up to $2.6B; Vineland is Nebius's first US deployment
The PJM grid demand right now: 71.7 GW (EIA-930, 2026-09-27 10:00). Nebius Vineland AI Data Center's announced 0.30 GW would be 0.4% of the grid's current load.
County water status: Abnormally dry (D0) in Cumberland County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Nebius Vineland AI Data Center sits on private land in New Jersey, Vineland. It connects to the PJM grid, draws on behind the meter gas power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
- Capex
- Microsoft multi-year GPU capacity agreement valued at ~$17.4B over 5 years (expandable to ~$19.4B); Vineland is the initial delivery site source
Timeline
- Aug 2026party addedutility: Bloom Energy
- Sep 2026Current: Partially energized
Sources
- Nebius Group N.V. Form 20-F FY2025
- Nebius accelerates US expansion, adding up to 300 MW capacity at new data center in New Jersey
- NJDEP Administrative Order and Notice of Civil Administrative Penalty Assessment: DATAONE Vineland (EA ID PEA260001-75894) · NJDEP
- Sherrill Administration Issues $1 Million Fine to Vineland Data Center · Insider NJ
- Governor Sherrill Statement on $1.07 Million Fine Against Vineland Data Center · Office of the Governor of New Jersey
- New Jersey says DataOne's 62 generators are illegal. It's letting them run for 45 more days. · Floodlight
- New Jersey hits data center powering Microsoft Copilot with $1M fine after drone expose · TechRadar Pro
3ba39da0-2226-4e26-b5c6-9299214fd403 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Nebius Vineland AI Data Center?
How much power will Nebius Vineland AI Data Center use?
Who is building Nebius Vineland AI Data Center?
Is Nebius Vineland AI Data Center operating yet?
How verified is the data on Nebius Vineland AI Data Center?
Deploy Watch
Track Nebius Vineland AI Data Center on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Nebius Vineland AI Data Center: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/nebius-vineland-new-jersey
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/nebius-vineland-new-jersey.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/nebius-vineland-new-jersey
- Data documentation: /data
- Query this programmatically: Deploy MCP