DEPLOY

Data center campus

Nebius Vineland AI Data Center

Nebius Vineland AI Data Center is an AI data center campus developed by DataOne in New Jersey, Vineland. 0.30 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Partially energized · DataOne · Private land · PJM · Vineland, New Jersey, United States


Capacity: announced vs energized

Announced-to-energized gap: 0.30 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Promised online: 2026. 3 months away. Claimed by Nebius / Bloom Energy (source).

Nebius Vineland AI Data Center capacity claims
Source
Announced0.30 GW2025-09-01claimedpress release

Key facts

0.30 GW

Announced

0 GW

Energized

DataOne

Developer

PJM

Grid

0.30 GW

Announced-to-energized gap

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Host operator NJDEP air penalty (Sep 2026)
NJDEP assessed DataOne $1,072,000 for installing/operating 62 Caterpillar G3516H natural-gas generators at the Vineland facility (3963 S Lincoln Ave) without air permits (inspection Jul 29 2026). Facility is the DataOne-built Vineland site tied to Nebius. Penalty assessed, not confirmed paid.
DataOne response + 45-day continue window (reported Sep 2026)
Reported (reported): NJDEP is allowing the 62 unpermitted Caterpillar G3516H generators to keep running while DataOne has 45 days to obtain required air permits or cease. DataOne told Floodlight it disagrees with the temporary-generator determination but will apply for permits and is transitioning toward approved fuel cells. Cap: Floodlight + company spokesperson; detailed facts also on company dataone

On the data center map

Every tracked data center is on this map, centered on Nebius Vineland AI Data Center. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

In clusterNew Jersey(88)

The deal

operator
Nebius Group N.V. · Ticker NBIS; build-to-suit model
offtaker
Microsoft · Multi-year GPU capacity agreement, up to ~$17.4B total contract value through 2031 per 20-F
chip supplier
NVIDIA · Blackwell GPUs
developer
DataOne · Build-to-suit developer of the Vineland facility (branded 'DataOne: Vineland, NJ'); first phase built in ~20 weeks in 2025
utility
Bloom Energy · On-site solid oxide fuel-cell power provider; 10-year master agreement up to $2.6B, 328 MW installed / ~250 MW guaranteed, targeted online 2026

Power

Power source
behind the meter gas
Grid operator
PJM
Interconnection

Vineland on-site Bloom Energy fuel cells / gas engines, gas, Under construction. Behind-the-meter generation; exact MW not disclosed

Bloom Energy solid oxide fuel cells (Nebius US master agreement), 0.33 GW gas, Under construction. 328 MW installed / ~250 MW guaranteed of on-site behind-the-meter solid oxide fuel cells (natural gas / on-site LNG), targeted online in 2026 under a 10-year master agreement worth up to $2.6B; Vineland is Nebius's first US deployment

The PJM grid demand right now: 71.7 GW (EIA-930, 2026-09-27 10:00). Nebius Vineland AI Data Center's announced 0.30 GW would be 0.4% of the grid's current load.

County water status: Abnormally dry (D0) in Cumberland County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Nebius Vineland AI Data Center sits on private land in New Jersey, Vineland. It connects to the PJM grid, draws on behind the meter gas power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States
FAA Proposed Rule: Enabling Supersonic Overland Flight (July 2026)operational restriction · 2026-07-02 · United States

Investment, workforce and specs

Capex
Microsoft multi-year GPU capacity agreement valued at ~$17.4B over 5 years (expandable to ~$19.4B); Vineland is the initial delivery site source

Timeline

  1. Aug 2026
    party added
    utility: Bloom Energy
  2. Sep 2026
    Current: Partially energized

Sources

3ba39da0-2226-4e26-b5c6-9299214fd403 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Nebius Vineland AI Data Center?
Nebius Vineland AI Data Center is an AI data center campus tracked on the DEPLOY registry, located in Vineland. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Nebius Vineland AI Data Center use?
Nebius Vineland AI Data Center has 0.30 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building Nebius Vineland AI Data Center?
DataOne is recorded as a party to Nebius Vineland AI Data Center on the DEPLOY registry.
Is Nebius Vineland AI Data Center operating yet?
As of the most recent verification on the DEPLOY registry, Nebius Vineland AI Data Center is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Nebius Vineland AI Data Center?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Nebius Vineland AI Data Center on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Nebius Vineland AI Data Center: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/nebius-vineland-new-jersey

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces