DEPLOYDatabase

Data center campus

Vineland campus

Vineland campus is a tracked AI data center campus in New Jersey, Vineland. Nebius's first self-built US greenfield campus

Under construction · Nebius · Vineland, New Jersey, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Vineland campus capacity claims
Source

Key facts

0 GW

Energized

Nebius

Developer

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
300 MW announced self-built New Jersey site
NJDEP air penalty (Sep 2026)
DataOne assessed $1,072,000 for running 62 Caterpillar natural-gas generators without air permits.
Permit window (reported, Sep 2026)
Generators may keep running while DataOne has 45 days to get permits; DataOne plans to move to fuel cells.
On-site power (company-stated, Oct 2026)
Bloom Energy fuel cells (about 328 MW installed planned) replace planned gas engines. Bloom said Oct 22 the first power block is ready; the campus comes online in phases.
Clean Air Act suit notice (filed, Oct 2026)
Sustain SJ, represented by Earthjustice, sent an Oct 21 2026 notice of intent to sue over 62 gas generators at Vineland run without federal air permits. No lawsuit filed yet.

On the data center map

Every tracked data center is on this map, centered on Vineland campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

In clusterNew Jersey(89)

The deal

developer
Nebius

Power

Power source
grid
Interconnection

County water status: Abnormally dry (D0) in Cumberland County, week of 2026-11-03 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Vineland campus is in New Jersey, Vineland. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States

Sources

5e760a5d-d058-4d1e-b46b-640945f05154 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Vineland campus?
Vineland campus is an AI data center campus tracked on the DEPLOY registry, located in Vineland. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Vineland campus?
Nebius is recorded as a party to Vineland campus on the DEPLOY registry. The full party list, with each role, is on the record.
Is Vineland campus operating yet?
As of the most recent verification on the DEPLOY registry, Vineland campus is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Vineland campus?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Vineland campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Vineland campus: AI data center campus record. Retrieved November 11, 2026, from https://registry.deploy.report/datacenters/nebius-vineland-campus

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces