DEPLOY

Data center campus

Vineland campus

Vineland campus is a tracked AI data center campus in Vineland, New Jersey, USA. Nebius's first self-built US greenfield campus

Under construction · Nebius · Vineland, New Jersey, USA


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Vineland campus capacity claims
Source

Key facts

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
300 MW (Announced 300 MW self-built New Jersey site)
Host operator NJDEP air penalty (Sep 2026)
NJDEP assessed DataOne $1,072,000 for installing/operating 62 Caterpillar G3516H natural-gas generators at the Vineland facility (3963 S Lincoln Ave) without air permits (inspection Jul 29 2026). Facility is the DataOne-built Vineland site tied to Nebius. Penalty assessed, not confirmed paid.
DataOne response + 45-day continue window (reported Sep 2026)
Reported (reported): NJDEP is allowing the 62 unpermitted Caterpillar G3516H generators to keep running while DataOne has 45 days to obtain required air permits or cease. DataOne told Floodlight it disagrees with the temporary-generator determination but will apply for permits and is transitioning toward approved fuel cells. Cap: Floodlight + company spokesperson; detailed facts also on company dataone

On the data center map

Every tracked data center is on this map, centered on Vineland campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

developer
Nebius

Power

Power source
grid
Interconnection

County water status: Abnormally dry (D0) in Cumberland County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Vineland campus is in Vineland, New Jersey, USA. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

5e760a5d-d058-4d1e-b46b-640945f05154 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Vineland campus?
Vineland campus is an AI data center campus tracked on the DEPLOY registry, located in Vineland, New Jersey, USA. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Vineland campus?
Nebius is recorded as a party to Vineland campus on the DEPLOY registry. The full party list, with each role, is on the record.
Is Vineland campus operating yet?
As of the most recent verification on the DEPLOY registry, Vineland campus is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Vineland campus?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Vineland campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Vineland campus: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/nebius-vineland-campus

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces