Vineland campus is a tracked AI data center campus in New Jersey, Vineland. Nebius's first self-built US greenfield campus
Under construction · Nebius · Vineland, New Jersey, United States
Capacity: announced vs energized
| Source |
|---|
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- IT capacity
- 300 MW announced self-built New Jersey site
- NJDEP air penalty (Sep 2026)
- DataOne assessed $1,072,000 for running 62 Caterpillar natural-gas generators without air permits.
- Permit window (reported, Sep 2026)
- Generators may keep running while DataOne has 45 days to get permits; DataOne plans to move to fuel cells.
- On-site power (company-stated, Oct 2026)
- Bloom Energy fuel cells (about 328 MW installed planned) replace planned gas engines. Bloom said Oct 22 the first power block is ready; the campus comes online in phases.
- Clean Air Act suit notice (filed, Oct 2026)
- Sustain SJ, represented by Earthjustice, sent an Oct 21 2026 notice of intent to sue over 62 gas generators at Vineland run without federal air permits. No lawsuit filed yet.
On the data center map
Every tracked data center is on this map, centered on Vineland campus. Pan or zoom out to see how close rivals are building.
In clusterNew Jersey(89)
The deal
- developer
- Nebius
Power
- Power source
- grid
- Interconnection
County water status: Abnormally dry (D0) in Cumberland County, week of 2026-11-03 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Vineland campus is in New Jersey, Vineland. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Sources
- Vineland campus — nebius facility
- NJDEP Administrative Order and Notice of Civil Administrative Penalty Assessment: DATAONE Vineland (EA ID PEA260001-75894) · NJDEP
- Sherrill Administration Issues $1 Million Fine to Vineland Data Center · Insider NJ
- Governor Sherrill Statement on $1.07 Million Fine Against Vineland Data Center · Office of the Governor of New Jersey
- New Jersey says DataOne's 62 generators are illegal. It's letting them run for 45 more days. · Floodlight
- New Jersey hits data center powering Microsoft Copilot with $1M fine after drone expose · TechRadar Pro
- Nebius and Bloom Energy partner to power AI infrastructure build-out · Nebius
- Bloom Energy says first power block is ready at Nebius's 300 MW New Jersey data center · Blockspace
- Sustain SJ notice of intent to sue DataOne for Clean Air Act violations · Earthjustice
- Community Advocates Plan to Sue Data Center Company Over Illegal Air Pollution in New Jersey · Earthjustice
5e760a5d-d058-4d1e-b46b-640945f05154 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Vineland campus?
Who is building Vineland campus?
Is Vineland campus operating yet?
How verified is the data on Vineland campus?
Deploy Watch
Track Vineland campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Vineland campus: AI data center campus record. Retrieved November 11, 2026, from https://registry.deploy.report/datacenters/nebius-vineland-campus
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/nebius-vineland-campus.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/nebius-vineland-campus
- Data documentation: /data
- Query this programmatically: Deploy MCP