{"id":"3ba39da0-2226-4e26-b5c6-9299214fd403","slug":"nebius-vineland-new-jersey","name":"Nebius Vineland AI Data Center","aliases":["Nebius New Jersey","Vineland NJ AI factory"],"locationId":"408bea1d-4b69-4c45-aa0a-6eca84e35b06","lat":null,"lng":null,"locationPrecision":null,"landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Nebius build-to-suit GPU campus in Cumberland County with up to 300 MW planned; first phase energized late 2025 and dedicated to Microsoft under a multi-year GPU capacity agreement. Powered largely behind-the-meter (Bloom Energy fuel cells plus on-site gas engines) to bypass the PJM interconnection queue. The FY2025 20-F confirms the Vineland site and Microsoft offtake but does not state per-site MW; exact energized MW not disclosed.","keyFacts":[{"label":"Host operator NJDEP air penalty (Sep 2026)","value":"NJDEP assessed DataOne $1,072,000 for installing/operating 62 Caterpillar G3516H natural-gas generators at the Vineland facility (3963 S Lincoln Ave) without air permits (inspection Jul 29 2026). Facility is the DataOne-built Vineland site tied to Nebius. Penalty assessed, not confirmed paid.","sourceUrl":"https://dep.nj.gov/wp-content/uploads/newsrel/2026/dataone75894-aonocapa.pdf"},{"label":"DataOne response + 45-day continue window (reported Sep 2026)","value":"Reported ([reported](https://floodlightnews.org/new-jersey-dataones-illegal-still-running/)): NJDEP is allowing the 62 unpermitted Caterpillar G3516H generators to keep running while DataOne has 45 days to obtain required air permits or cease. DataOne told Floodlight it disagrees with the temporary-generator determination but will apply for permits and is transitioning toward approved fuel cells. Cap: Floodlight + company spokesperson; detailed facts also on company dataone"}],"reviewStatus":"reviewed","sources":[{"url":"https://www.sec.gov/Archives/edgar/data/0001513845/000110465926052948/nbis-20251231x20f.htm","title":"Nebius Group N.V. Form 20-F FY2025"},{"url":"https://nebius.com/newsroom/nebius-accelerates-us-expansion-adding-up-to-300-mw-capacity-at-new-data-center-in-new-jersey","title":"Nebius accelerates US expansion, adding up to 300 MW capacity at new data center in New Jersey"},{"url":"https://dep.nj.gov/wp-content/uploads/newsrel/2026/dataone75894-aonocapa.pdf","title":"NJDEP Administrative Order and Notice of Civil Administrative Penalty Assessment: DATAONE Vineland (EA ID PEA260001-75894)","sourceName":"NJDEP"},{"url":"https://www.insidernj.com/sherrill-administration-issues-1-million-fine-to-vineland-data-center/","title":"Sherrill Administration Issues $1 Million Fine to Vineland Data Center","sourceName":"Insider NJ"},{"url":"https://www.nj.gov/governor/news/2026/20260922a.shtml","title":"Governor Sherrill Statement on $1.07 Million Fine Against Vineland Data Center","sourceName":"Office of the Governor of New Jersey","publishedAt":"2026-09-22"},{"url":"https://floodlightnews.org/new-jersey-dataones-illegal-still-running/","title":"New Jersey says DataOne's 62 generators are illegal. It's letting them run for 45 more days.","sourceName":"Floodlight","publishedAt":"2026-09-23"},{"url":"https://www.techradar.com/pro/new-jersey-hits-data-center-powering-microsoft-copilot-with-usd1m-fine-after-drone-expose-62-secretly-installed-gas-generators","title":"New Jersey hits data center powering Microsoft Copilot with $1M fine after drone expose","sourceName":"TechRadar Pro","publishedAt":"2026-09-23"}],"reviewNote":null,"createdAt":"2026-08-17T20:22:45.534Z","updatedAt":"2026-09-26T20:55:20.873Z","location":{"id":"408bea1d-4b69-4c45-aa0a-6eca84e35b06","name":"Vineland","slug":"vineland-new-jersey","kind":"city","parentLocationId":"fda583b9-b212-4f2d-8e39-021169fe9c80","region":"New Jersey","lat":39.4862777,"lng":-75.0254256,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:22:45.156Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"019ecbe2-3557-485b-9f9d-3d64bfb19734","dataCenterId":"3ba39da0-2226-4e26-b5c6-9299214fd403","companyId":null,"externalName":"Nebius Group N.V.","role":"operator","structureNotes":"Ticker NBIS; build-to-suit model","createdAt":"2026-08-17T20:22:47.133Z","company":null},{"id":"52e1b1cb-6ab9-42b7-8844-0cfee43c30f7","dataCenterId":"3ba39da0-2226-4e26-b5c6-9299214fd403","companyId":null,"externalName":"Microsoft","role":"offtaker","structureNotes":"Multi-year GPU capacity agreement, up to ~$17.4B total contract value through 2031 per 20-F","createdAt":"2026-08-17T20:22:47.903Z","company":null},{"id":"37f62247-23e6-4d80-8578-e9014b9695f5","dataCenterId":"3ba39da0-2226-4e26-b5c6-9299214fd403","companyId":null,"externalName":"NVIDIA","role":"chip_supplier","structureNotes":"Blackwell GPUs","createdAt":"2026-08-17T20:22:48.664Z","company":null},{"id":"6e0fb1ee-7954-41d1-aab8-149c0c1a5ef1","dataCenterId":"3ba39da0-2226-4e26-b5c6-9299214fd403","companyId":null,"externalName":"DataOne","role":"developer","structureNotes":"Build-to-suit developer of the Vineland facility (branded 'DataOne: Vineland, NJ'); first phase built in ~20 weeks in 2025","createdAt":"2026-08-19T00:29:03.478Z","company":null},{"id":"cb6a5f40-da96-4a2c-8677-904ae6ff2aac","dataCenterId":"3ba39da0-2226-4e26-b5c6-9299214fd403","companyId":null,"externalName":"Bloom Energy","role":"utility","structureNotes":"On-site solid oxide fuel-cell power provider; 10-year master agreement up to $2.6B, 328 MW installed / ~250 MW guaranteed, targeted online 2026","createdAt":"2026-08-19T00:29:04.645Z","company":null}],"capacityClaims":[{"id":"34958e6c-742e-4821-9d2e-352c81e63ee0","dataCenterId":"3ba39da0-2226-4e26-b5c6-9299214fd403","series":"announced","valueGw":0.3,"asOf":"2025-09-01T00:00:00.000Z","sourceUrl":"https://nebius.com/newsroom/nebius-accelerates-us-expansion-adding-up-to-300-mw-capacity-at-new-data-center-in-new-jersey","sourceType":"press_release","evidenceTier":"claimed","supersedesId":null,"note":"Up to 300 MW planned per company; 20-F confirms site + Microsoft offtake but not per-site MW","createdAt":"2026-08-17T20:22:46.219Z"}],"financialClaims":[],"metricClaims":[{"id":"c72be81f-4c0c-433f-9a21-976f0bcb2a54","dataCenterId":"3ba39da0-2226-4e26-b5c6-9299214fd403","metricType":"capex_usd","valueNumeric":null,"valueText":"Microsoft multi-year GPU capacity agreement valued at ~$17.4B over 5 years (expandable to ~$19.4B); Vineland is the initial delivery site","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://convergedigest.com/nebius-inks-17-4b-deal-with-microsoft-for-ai-infrastructure/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:29:02.709Z"}],"powerProjects":[{"id":"8a7bbb4b-2ba3-4fd7-aa7a-668e7ed64eea","dataCenterId":"3ba39da0-2226-4e26-b5c6-9299214fd403","name":"Vineland on-site Bloom Energy fuel cells / gas engines","type":"gas","capacityGw":null,"lifecycleState":"under_construction","sourceUrl":"https://nebius.com/newsroom/nebius-accelerates-us-expansion-adding-up-to-300-mw-capacity-at-new-data-center-in-new-jersey","evidenceTier":"claimed","note":"Behind-the-meter generation; exact MW not disclosed","createdAt":"2026-08-17T20:22:46.754Z"},{"id":"fd68c54c-b402-4cf6-a140-e69843b1e5a8","dataCenterId":"3ba39da0-2226-4e26-b5c6-9299214fd403","name":"Bloom Energy solid oxide fuel cells (Nebius US master agreement)","type":"gas","capacityGw":0.328,"lifecycleState":"under_construction","sourceUrl":"https://nebius.com/newsroom/nebius-and-bloom-energy-partner-to-power-ai-infrastructure-build-out","evidenceTier":"reported","note":"328 MW installed / ~250 MW guaranteed of on-site behind-the-meter solid oxide fuel cells (natural gas / on-site LNG), targeted online in 2026 under a 10-year master agreement worth up to $2.6B; Vineland is Nebius's first US deployment","createdAt":"2026-08-19T00:29:02.304Z"}],"facilities":[],"incidents":[],"events":[{"id":"eb50459f-2e97-4436-b27a-9484c7a8527d","dataCenterId":"3ba39da0-2226-4e26-b5c6-9299214fd403","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Bloom Energy","occurredAt":"2026-08-19T00:29:05.056Z","createdAt":"2026-08-19T00:29:05.056Z"},{"id":"db7d00f4-a45a-4bd9-8e3e-eb9d92cc2f8a","dataCenterId":"3ba39da0-2226-4e26-b5c6-9299214fd403","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: DataOne","occurredAt":"2026-08-19T00:29:03.872Z","createdAt":"2026-08-19T00:29:03.872Z"},{"id":"adc71b21-4f8f-4f51-a17d-1f3b43021d39","dataCenterId":"3ba39da0-2226-4e26-b5c6-9299214fd403","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"chip_supplier: NVIDIA","occurredAt":"2026-08-17T20:22:49.046Z","createdAt":"2026-08-17T20:22:49.046Z"},{"id":"f6df198f-164c-415e-a7cc-29ae17f6cf67","dataCenterId":"3ba39da0-2226-4e26-b5c6-9299214fd403","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"offtaker: Microsoft","occurredAt":"2026-08-17T20:22:48.285Z","createdAt":"2026-08-17T20:22:48.285Z"},{"id":"452732b2-74aa-44d9-88cc-141176522ee1","dataCenterId":"3ba39da0-2226-4e26-b5c6-9299214fd403","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Nebius Group N.V.","occurredAt":"2026-08-17T20:22:47.517Z","createdAt":"2026-08-17T20:22:47.517Z"},{"id":"e2ad8ed2-d5a2-49fd-a888-e84cd779ddd2","dataCenterId":"3ba39da0-2226-4e26-b5c6-9299214fd403","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.3","claimId":"34958e6c-742e-4821-9d2e-352c81e63ee0","detail":null,"occurredAt":"2026-08-17T20:22:46.527Z","createdAt":"2026-08-17T20:22:46.527Z"},{"id":"b9ec5bc5-c440-4a57-b03e-e6f183b7f7b3","dataCenterId":"3ba39da0-2226-4e26-b5c6-9299214fd403","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.3","claimId":"34958e6c-742e-4821-9d2e-352c81e63ee0","detail":"claimed · press_release","occurredAt":"2026-08-17T20:22:46.374Z","createdAt":"2026-08-17T20:22:46.374Z"}],"capacity_picture":{"announced_gw":0.3,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":0.3,"by_series":{"announced":{"valueGw":0.3,"asOf":"2025-09-01T00:00:00.000Z","evidenceTier":"claimed","sourceUrl":"https://nebius.com/newsroom/nebius-accelerates-us-expansion-adding-up-to-300-mw-capacity-at-new-data-center-in-new-jersey"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Nebius Vineland AI Data Center","url":"https://registry.deploy.report/datacenters/nebius-vineland-new-jersey","address":{"@type":"PostalAddress","addressLocality":"Vineland"}}}