QCi Dirac-3 Quantum Machine at Digital Crossroad is a tracked AI data center campus in Hammond, Indiana, USA. First commercial data-center installation of Quantum Computing Inc.'s Dirac-3 entropy quantum optimization machine, placed inside Digital Crossroad's DX-1 facility in Hammond, Indiana on March 30, 2026 and connected to t
Energized · Quantum Computing Inc · colocated · MISO · Hammond, Indiana, USA
Capacity: announced vs energized
| Source |
|---|
Key facts
Lifecycle
Energized
Developer
Location
Grid
Land
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Significance
- First data center installation of Dirac-3 quantum machine
- Deployed
- March 2026
- Host facility
- Digital Crossroad Data Center, Hammond, IN
- Network
- Quantum Corridor (Chicago ORD 10 to Hammond, first inter-state quantum-safe network)
- Ticker
- Nasdaq: QUBT
- Founder/Chairman
- Robert Liscouski
- CEO
- Dr. Yuping Huang
- Founded
- 2001 (repositioned to quantum ~2018)
- HQ
- Hoboken, New Jersey, USA
- Total funding
- $1.64B (since Nov 2024)
- Technology
- Room-temperature photonic entropy quantum computer built on thin-film lithium niobate (TFLN) and integrated photonics
- Deployment date
- March 30, 2026
- Host facility size
- DX-1 is 105,000 sq ft with 20 MW installed and 72,000+ sq ft of data hall (Tier III, design PUE 1.15)
- Site
- Digital Crossroads campus at the former State Line Power Plant on the Lake Michigan shoreline, Hammond, IN
- Serving utility
- NIPSCO exclusive electric service territory (MISO)
- Cooling (host)
- Lake Michigan water-side economization plus air-side economizer and refrigerant Munters units
- Cooling (Dirac-3)
- Room-temperature operation; no cryogenics required
- Security
- Toshiba Quantum Key Distribution (QKD) over a 10G commercial link on the Quantum Corridor network
- Use cases
- Discrete optimization: multi-asset portfolio management, fraud detection, operational-risk assessment
- Network operator
- Quantum Corridor Inc. (CEO Dr. Mit Jha)
- Access
- Available to Chicago Quantum Exchange member institutions and Midwest enterprise users
On the data center map
Every tracked data center is on this map, centered on QCi Dirac-3 Quantum Machine at Digital Crossroad. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
The deal
- operator
- Quantum Computing Inc
Power
- Power source
- grid
- Grid operator
- MISO
- Interconnection
- Water
- Host DX-1 facility uses Lake Michigan water-side economization via heat exchanger plus air-side economizer and Munters refrigerant units. The Dirac-3 itself is a room-temperature photonic (thin-film lithium niobate) system and does not require dilution-refrigerator cryogenics.
The MISO grid demand right now: 66.1 GW (EIA-930, 2026-09-27 05:00).
County water status: No drought in Lake County, week of 2026-09-08 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
QCi Dirac-3 Quantum Machine at Digital Crossroad sits on colocated in Hammond, Indiana, USA. It connects to the MISO grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Sources
- Quantum Computing Inc. Deploys Dirac-3 Quantum Machine on Quantum Corridor Network
- QCi Quantum Optimization Machine placed on Quantum Corridor network
- QCi Board Appoints Dr. William McGann as CEO
- Digital Crossroad DX-1 Indiana Data Center overview (105,000 sq ft, 20 MW, Tier III) · Digital Crossroad
- CoreWeave to develop 180MW data center at Digital Crossroads campus in Hammond, Indiana · Data Center Dynamics
- Power Is a Question in Hammond, Ind., Data Center Expansion (NIPSCO service territory) · Government Technology
- Digital Crossroad (Indiana NAP) Data Center profile · Baxtel
- Digital Crossroad Hammond construction profile · ARCO National Construction
23c5859b-47f5-4d41-820c-fba969bceab1 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is QCi Dirac-3 Quantum Machine at Digital Crossroad?
Who is building QCi Dirac-3 Quantum Machine at Digital Crossroad?
Is QCi Dirac-3 Quantum Machine at Digital Crossroad operating yet?
How verified is the data on QCi Dirac-3 Quantum Machine at Digital Crossroad?
Deploy Watch
Track QCi Dirac-3 Quantum Machine at Digital Crossroad on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). QCi Dirac-3 Quantum Machine at Digital Crossroad: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/qci-dirac3-digital-crossroad-hammond
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/qci-dirac3-digital-crossroad-hammond.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/qci-dirac3-digital-crossroad-hammond
- Data documentation: /data
- Query this programmatically: Deploy MCP