Data center campus
Polaris Forge 1 (Ellendale)
Polaris Forge 1 is an AI data center campus developed by Applied Digital in North Dakota, Ellendale. 1 GW of capacity has been announced; 0.10 GW is energized. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Partially energized · Applied Digital · greenfield · MISO · Ellendale, North Dakota, United States
Capacity: announced vs energized
Announced-to-energized gap: 0.90 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2027. Energized capacity is now on record. Claimed by Applied Digital (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 1 GW | 2025-08-30 | claimed | press release |
| Contracted | 0.40 GW | 2026-05-31 | verified | sec filing |
| Energized | 0.17 GW | 2026-07-01 | claimed | press release |
| Energized | 0.10 GW | 2025-11-24 | verified | press release |
Key facts
Lifecycle
Announced
Energized
Developer
Location
Grid
Land
Facilities tracked
On the data center map
Every tracked data center is on this map, centered on Polaris Forge 1. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
- Cooling
- Proprietary waterless / closed-loop cooling
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterNorth Dakota(26)
The deal
- utility
- Otter Tail Power (MISO)
- developer
- Applied Digital · NASDAQ: APLD
- operator
- Applied Digital
- offtaker
- CoreWeave · 15-year take-or-pay leases, 400 MW
Power
- Power source
- grid
- Grid operator
- MISO
- Interconnection
- Water
- Applied Digital proprietary closed-loop / waterless cooling design.
Jamestown-to-Ellendale 345 kV line (MISO Tranche 1), grid interconnect, Under construction. 345 kV transmission upgrade supporting ND data-center load; not a generation project
The MISO grid demand right now: 66.6 GW (EIA-930, 2026-09-27 07:00). Polaris Forge 1's announced 1 GW would be 1.5% of the grid's current load.
County water status: Severe drought (D2) in Dickey County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Polaris Forge 1 sits on greenfield in North Dakota, Ellendale. It connects to the MISO grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
- Cooling
- Proprietary waterless / closed-loop cooling source
Facilities at this campus
Timeline
- Aug 2026party linkedofftaker: linked externalName "CoreWeave" to company coreweave
- Sep 2026Current: Partially energized
Sources
- Applied Digital Corp. Form 10-K (FY ended May 31, 2026)
- Applied Digital Finalizes Additional 150MW Lease with CoreWeave in North Dakota
- Applied Digital Delivers Second Building at Polaris Forge 1
baa8d3fd-aa92-4697-8df3-166687b95c75 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Polaris Forge 1 (Ellendale)?
How much power will Polaris Forge 1 (Ellendale) use?
Who is building Polaris Forge 1 (Ellendale)?
Is Polaris Forge 1 (Ellendale) operating yet?
How verified is the data on Polaris Forge 1 (Ellendale)?
Deploy Watch
Track Polaris Forge 1 (Ellendale) on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Polaris Forge 1 (Ellendale): AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/applied-digital-ellendale-north-dakota
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/applied-digital-ellendale-north-dakota.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/applied-digital-ellendale-north-dakota
- Data documentation: /data
- Query this programmatically: Deploy MCP