Data center facility
Project Jade
Crusoe · Cheyenne. Every figure below is individually sourced and dated.
Part of the tracked campus Project Jade (Crusoe / Tallgrass) AI Data Center Campus.
- Announced capex
- $50B
- Cooling
- closed-loop cooling
- Grid
- WECC · Bring your own power: the campus is paired with the Cheyenne Power Hub, a dedicated 2.7 GW gas plant Tallgrass is building beside it inside the same industrial park, so the compute build does not wait on new grid capacity.
- Cost per MW
- $5M/MW
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterWyoming(26)
The deal
Inherited from campus Project Jade (Crusoe / Tallgrass) AI Data Center Campus.
- utility
- Tallgrass Energy · Builds BFC Power / Cheyenne Power Hub and CO2 sequestration hub
- financier
- Blackstone Inc. · Listed by Global Energy Monitor as parent/owner behind Tallgrass Energy on the BFC Power / Cheyenne Power Hub. Tracker-sourced.
- developer
- Crusoe · Develops the AI data center campus
Financial structure
Inherited from campus Project Jade (Crusoe / Tallgrass) AI Data Center Campus.
- Total campus capex (Crusoe/Project Jade)
- $50B. Reported as 'more than $50 billion' total capital expenditure across full build-out. journalist report
- Tallgrass energy infrastructure investment
- $7B. $7 billion for on-site natural gas power generation (BFC Power / Cheyenne Power Hub). journalist report
Investment, workforce and specs
Inherited from campus Project Jade (Crusoe / Tallgrass) AI Data Center Campus.
Power
Inherited from campus Project Jade (Crusoe / Tallgrass) AI Data Center Campus. Live grid demand and drought overlay only render on the campus page.
- Power source
- behind the meter gas
- Grid operator
- WECC
- Interconnection
- Bring your own power: the campus is paired with the Cheyenne Power Hub, a dedicated 2.7 GW gas plant Tallgrass is building beside it inside the same industrial park, so the compute build does not wait on new grid capacity.
- Water
- On-site deep groundwater wells drilled below the aquifers that supply Laramie County; closed-loop cooling to minimize consumption. Reported initial fill roughly equivalent to 20 households and ongoing annual use less than three households (Cowboy State Daily).
BFC Power / Cheyenne Power Hub, 2.70 GW gas, Permitted. 2.7 GW natural gas-fired generation on 659 acres, built by Tallgrass; $7B investment.
Bloom Energy fuel cells, other, Announced. Fuel cells cited in bring-your-own-power model; capacity unspecified.
BFC Power and Cheyenne Power Hub, 2.70 GW gas, Permitted. 2.7 GW new on-site natural gas generation dedicated to the campus; per Global Energy Monitor configured as two ~1,350 MW combined-cycle units plus aeroderivative turbines. Laramie County site plan approved 2026-01-05; developed by Tallgrass Energy; CO2 sequestration reported up to ~10.6M metric tons/yr. GEM status: pre-construction.
Bloom Energy fuel cell yard, other, Announced. Bloom Energy fuel cells cited as supplemental on-site generation alongside gas turbines.
Facility record
On the data center map
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Sep 2026Current: under construction
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is Project Jade?
Who operates Project Jade?
Is Project Jade operating?
How verified is the data on Project Jade?
Deploy Watch
Track Project Jade on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). Project Jade: data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/project-jade-crusoe-laramie-county-wy
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/project-jade-crusoe-laramie-county-wy.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/project-jade-crusoe-laramie-county-wy
- Data documentation: /data
- Query this programmatically: Deploy MCP