DEPLOYDatabase

Data center campus

AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus

AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus is an AI data center campus developed by Amazon Web Services in Pennsylvania, Salem Township. 0.96 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Partially energized · Amazon Web Services · Private land · PJM · Salem Township, Pennsylvania, United States


Capacity: announced vs energized

Announced-to-energized gap: 0.96 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Promised online: 2032. 74 months away. Claimed by Talen Energy / AWS (source).

AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus capacity claims
Source
Announced0.96 GW2024-06-01reportedjournalist report

Key facts

0.96 GW

Announced

0 GW

Energized

Amazon Web Services

Developer

PJM

Grid

0.96 GW

Announced-to-energized gap

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Acquisition (reported)
AWS bought Talen's Cumulus campus next to Susquehanna nuclear plant; about 960 MW, about $650M.
Nuclear PPA (company-claimed, Jun 2025)
Up to 1,920 MW from Susquehanna through 2042, full volume by 2032
Delivery structure (company-claimed)
Moving to front-of-meter supply via PJM and PPL after FERC rejection; reconfiguration Spring 2026.
SMR exploration (company-claimed)
Talen and Amazon to explore SMRs and Susquehanna uprates
Grid region
PJM

On the data center map

Every tracked data center is on this map, centered on AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.
The story of AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus
Announced capex
$650M
Derived
Cost per MW
$677K/MW

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterPennsylvania(96)

The deal

operator
Amazon Web Services · Acquired campus and develops data center load
utility
Talen Energy · Owner of Susquehanna nuclear plant and power supplier
offtaker
Amazon Web Services · 17-year nuclear power purchase agreement

Power

Power source
nuclear ppa
Grid operator
PJM
Interconnection

Susquehanna nuclear station power supply, 1.92 GW nuclear, Energized. 17-year PPA for up to 1.92 GW from the operating 2.5 GW two-unit plant, ramping to full by ~2032

The PJM grid demand right now: 81.9 GW (EIA-930, 2026-11-10 08:00). AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus's announced 0.96 GW would be 1.2% of the grid's current load.

County water status: No drought in Luzerne County, week of 2026-11-03 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Silicon on site

Every AI chip publicly attributed to AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus on the DEPLOY registry. Quantity hints are unstructured because underlying disclosures vary by an order of magnitude. Source links per row.

  1. as of 2024-11-01

    Anthropic Project Rainier training cluster — Trainium 2 at scale (960 MW envelope)

    reported

    Amazon

Why here

AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus sits on private land in Pennsylvania, Salem Township. It connects to the PJM grid, draws on nuclear ppa power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

AWS acquisition of Cumulus data center campus
$650M. $350M at close plus $300M in escrow tied to 2024 development milestones journalist report

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States

Timeline

  1. Aug 2026
    party added
    offtaker: Amazon Web Services
  2. Nov 2026
    Current: Partially energized

Sources

7cb8993b-ed76-464a-8094-82a4395840e3 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus?
AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus is an AI data center campus tracked on the DEPLOY registry, located in Salem Township. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus use?
AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus has 0.96 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus?
Amazon Web Services is recorded as a party to AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus on the DEPLOY registry.
Is AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus operating yet?
As of the most recent verification on the DEPLOY registry, AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). AWS Susquehanna (Cumulus) Nuclear-Coupled Data Center Campus: AI data center campus record. Retrieved November 12, 2026, from https://registry.deploy.report/datacenters/aws-susquehanna-cumulus-salem-township-pennsylvania

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces