DEPLOY

Data center campus

Garden City Data Center

Garden City Data Center is a tracked AI data center campus in Texas, Glasscock County. Legacy hosting (Cloud Services / bitcoin hosting) campus.

Energized · Applied Digital · Garden City, Glasscock County, Texas, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Garden City Data Center capacity claims
Source

Key facts

energized

Lifecycle

0 GW

Energized

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
200 MW (Company disclosure: 200 MW hosting facility)

On the data center map

Every tracked data center is on this map, centered on Garden City Data Center. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

In clusterGlasscock County(5)·Texas(607)

The deal

Power

Power source
grid
Interconnection

County water status: Severe drought (D2) in Glasscock County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Garden City Data Center is in Texas, Glasscock County. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States

Sources

6ece29a4-41b2-4134-9a89-b5778ac70a8e · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Garden City Data Center?
Garden City Data Center is an AI data center campus tracked on the DEPLOY registry, located in Garden City. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Garden City Data Center?
Applied Digital is recorded as a party to Garden City Data Center on the DEPLOY registry. The full party list, with each role, is on the record.
Is Garden City Data Center operating yet?
As of the most recent verification on the DEPLOY registry, Garden City Data Center is energized and operating. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Garden City Data Center?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Garden City Data Center on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Garden City Data Center: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/applied-digital-garden-city-data-center

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces