Data center facility
Applied Digital Ellendale Campus (Polaris Forge 1)
Applied Digital · Ellendale. Every figure below is individually sourced and dated.
Part of the tracked campus Polaris Forge 1 (Ellendale).
- Cooling
- Proprietary waterless / closed-loop cooling
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterNorth Dakota(26)
The deal
Inherited from campus Polaris Forge 1 (Ellendale).
- utility
- Otter Tail Power (MISO)
- developer
- Applied Digital · NASDAQ: APLD
- operator
- Applied Digital
- offtaker
- CoreWeave · 15-year take-or-pay leases, 400 MW
Investment, workforce and specs
Inherited from campus Polaris Forge 1 (Ellendale).
- Cooling
- Proprietary waterless / closed-loop cooling source
Power
Inherited from campus Polaris Forge 1 (Ellendale). Live grid demand and drought overlay only render on the campus page.
- Power source
- grid
- Grid operator
- MISO
- Interconnection
- Water
- Applied Digital proprietary closed-loop / waterless cooling design.
Jamestown-to-Ellendale 345 kV line (MISO Tranche 1), grid interconnect, Under construction. 345 kV transmission upgrade supporting ND data-center load; not a generation project
Facility record
operating
Status
hyperscale
Type
Operator
Location
180 MW
Critical IT
2,250,000 sqft
Building
2023
Operational
On the data center map
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
- buildingSqft: 2250000 (reported) · source · Polaris Forge 1 campus-total planned
- critical it mw: 180 (reported) · source
- note: Original 180 MW crypto/hosting facility energized March 7 2023; campus expanding into a multi-hundred-MW AI factory (Polaris Forge 1) leased to CoreWeave (reported) · source
- record: Applied Digital Ellendale Campus (Polaris Forge 1) (reported) · source
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Sep 2026Current: operating
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is Applied Digital Ellendale Campus (Polaris Forge 1)?
Who operates Applied Digital Ellendale Campus (Polaris Forge 1)?
Is Applied Digital Ellendale Campus (Polaris Forge 1) operating?
How verified is the data on Applied Digital Ellendale Campus (Polaris Forge 1)?
Deploy Watch
Track Applied Digital Ellendale Campus (Polaris Forge 1) on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). Applied Digital Ellendale Campus (Polaris Forge 1): data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/applied-digital-ellendale-dickey-northdakota
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/applied-digital-ellendale-dickey-northdakota.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/applied-digital-ellendale-dickey-northdakota
- Data documentation: /data
- Query this programmatically: Deploy MCP