Delta Forge 2 is a tracked AI data center campus in North Dakota, Ellendale. Second Ellendale-area HPC building leased to CoreWeave under the Applied AI Factories program.

Announced · Applied Digital · Ellendale, North Dakota, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Delta Forge 2 capacity claims
Source

Key facts

announced

Lifecycle

0 GW

Energized

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
210 MW (Company headline: 210 MW lease signed)
Named tenants
CoreWeave

On the data center map

Every tracked data center is on this map, centered on Delta Forge 2. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

In clusterNorth Dakota(26)

The deal

Power

Power source
grid
Interconnection

County water status: Severe drought (D2) in Dickey County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Delta Forge 2 is in North Dakota, Ellendale. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States
FAA Proposed Rule: Enabling Supersonic Overland Flight (July 2026)operational restriction · 2026-07-02 · United States

Sources

9296361c-cc72-45d3-af78-92a1b47e790f · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Delta Forge 2?
Delta Forge 2 is an AI data center campus tracked on the DEPLOY registry, located in Ellendale. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Delta Forge 2?
Applied Digital is recorded as a party to Delta Forge 2 on the DEPLOY registry. The full party list, with each role, is on the record.
Is Delta Forge 2 operating yet?
As of the most recent verification on the DEPLOY registry, Delta Forge 2 is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Delta Forge 2?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Delta Forge 2 on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Delta Forge 2: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/applied-digital-delta-forge-2

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces