Data center campus
Voltage Park Chicago
Voltage Park Chicago is a tracked AI data center campus in Illinois, Cook County. Chicago InfiniBand fabric hosting initial 24k H100 cluster (colocated in third-party Chicago-area facilities); flagship site of the 6-DC portfolio
Energized · Voltage Park · Chicago, Cook County, Illinois, United States
Capacity: announced vs energized
| Source |
|---|
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Operator portfolio (company-claimed)
- Six Tier 3+ US data centers in four states; about 24,000 NVIDIA H100 GPUs.
- Hardware (company-claimed)
- NVIDIA HGX H100 on Dell PowerEdge XE9680; InfiniBand up to 3200 Gbps.
- City naming (unconfirmed)
- Voltage Park's public pages do not list Chicago by name.
On the data center map
Every tracked data center is on this map, centered on Voltage Park Chicago. Pan or zoom out to see how close rivals are building.
In clusterCook County(105)·Illinois(172)
The deal
- developer
- Voltage Park
Power
- Power source
- grid
- Interconnection
County water status: No drought in Cook County, week of 2026-11-03 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Voltage Park Chicago is in Illinois, Cook County. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Sources
b219ed10-f226-4bbd-be22-c8d4f78fa280 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Voltage Park Chicago?
Who is building Voltage Park Chicago?
Is Voltage Park Chicago operating yet?
How verified is the data on Voltage Park Chicago?
Deploy Watch
Track Voltage Park Chicago on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Voltage Park Chicago: AI data center campus record. Retrieved November 11, 2026, from https://registry.deploy.report/datacenters/voltage-park-chicago
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/voltage-park-chicago.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/voltage-park-chicago
- Data documentation: /data
- Query this programmatically: Deploy MCP