DEPLOY

Data center campus

Stratos Project (O'Leary Digital) AI Data Center & Energy Campus

Stratos Project (O'Leary Digital) AI Data Center & Energy Campus is an AI data center campus developed by O'Leary Digital in Utah, Hansel Valley. 9 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Announced · O'Leary Digital · greenfield · WECC · Hansel Valley, Utah, United States


Capacity: announced vs energized

Announced-to-energized gap: 9 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Stratos Project (O'Leary Digital) AI Data Center & Energy Campus capacity claims
Source
Announced9 GW2026-06-01reportedpress release
Announced0.50 GW2026-05-07claimedjournalist report
Announced3 GW2026-05-04claimedcounty docket
Announced1 GW2026-05-01reportedjournalist report

Key facts

announced

Lifecycle

9 GW

Announced

0 GW

Energized

O'Leary Digital

Developer

WECC

Grid

9 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on Stratos Project (O'Leary Digital) AI Data Center & Energy Campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.
The story of Stratos Project (O'Leary Digital) AI Data Center & Energy Campus
Announced capex
$100B
Jobs
2,000 permanent reported
Cooling
Closed-loop chilling system combined with dry (air-based) cooling; no continuous water draw
Derived
Cost per MW
$11M/MW
Cost per job
$50M per permanent job

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterUtah(67)

The deal

developer
O'Leary Digital · Kevin O'Leary-backed; partnered with Utah MIDA project area
developer
Military Installation Development Authority (MIDA) · Utah state agency sponsoring the project area
utility
Tallgrass Energy · Prospective natural gas service via Ruby Pipeline connection
developer
O'Leary Ventures · Kevin O'Leary's investment firm and parent of O'Leary Digital; CEO Paul Palandjian publicly stated the >$4B Phase 1 and ~$20B early-phase capex figures. Kevin O'Leary (person) is the public backer making the larger multi-GW / $100B verbal claims.

Power

Power source
behind the meter gas
Grid operator
WECC
Interconnection
Water
Off-grid campus using closed-loop chilling plus dry (air-based) cooling with no continuous water draw; water only for one-time system fill and minor maintenance. Water purchased from private landowners' existing agricultural water rights, explicitly not from the Great Salt Lake (Utah Gov Office FAQ). A water-right change application was filed Mar 25, 2026 and withdrawn May 6, 2026 with intent to refile.

On-site natural gas generation (Ruby Pipeline supply), 9 GW gas, Announced. Self-generated gas plant claimed up to 9 GW; gas via Ruby Pipeline through Tallgrass; no air permit yet.

Stratos on-site natural gas generation, 9 GW gas, Announced. Behind-the-meter, off-grid; mostly natural gas fed via a direct connection to the interstate Ruby Pipeline (owned by Tallgrass Energy). Starts ~3 GW, scales toward ~9 GW. As of the state FAQ no Air Quality Notice of Intent had been submitted; nothing energized or permitted.

Stratos on-site solar (contemplated), solar, Announced. State FAQ notes solar is among on-site generation types contemplated (larger footprint than gas); no capacity specified.

County water status: Extreme drought (D3) in Box Elder County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Stratos Project (O'Leary Digital) AI Data Center & Energy Campus sits on greenfield in Utah, Hansel Valley. It connects to the WECC grid, draws on behind the meter gas power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Full buildout total
$100B. 'Could exceed $100 billion' at full buildout; aspirational full-scale figure. journalist report
Upfront county impact funding
$16M. Developer commitment TO Box Elder County (not an incentive to the developer) to offset initial impacts on the county budget for essential services such as law enforcement and fire. press release
MIDA property tax relief
MIDA approved property tax relief for the developers on Apr 24, 2026; specific abatement terms unspecified in sourcing. journalist report
Phase 1 (~500 MW) investment
$4B. Stated as 'more than $4 billion'; floor figure. journalist report
Early phases (scaling to 3 GW)
$20B. Cumulative early-phase expenditures per O'Leary Ventures. journalist report

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States
FAA Proposed Rule: Enabling Supersonic Overland Flight (July 2026)operational restriction · 2026-07-02 · United States

Investment, workforce and specs

Cooling
Closed-loop chilling system combined with dry (air-based) cooling; no continuous water draw source
Construction jobs
Thousands of construction jobs over an approximately ten-year period source
Permanent jobs
~2,000 permanent jobs at full buildout (skilled trade, logistics, IT, administrative) source

Timeline

  1. Aug 2026
    party added
    developer: O'Leary Ventures
  2. Sep 2026
    Current: Announced

Sources

25b8834d-2433-4ff8-a6dd-87c57d598562 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Stratos Project (O'Leary Digital) AI Data Center & Energy Campus?
Stratos Project (O'Leary Digital) AI Data Center & Energy Campus is an AI data center campus tracked on the DEPLOY registry, located in Hansel Valley. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Stratos Project (O'Leary Digital) AI Data Center & Energy Campus use?
Stratos Project (O'Leary Digital) AI Data Center & Energy Campus has 9 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building Stratos Project (O'Leary Digital) AI Data Center & Energy Campus?
O'Leary Digital is recorded as a party to Stratos Project (O'Leary Digital) AI Data Center & Energy Campus on the DEPLOY registry.
Is Stratos Project (O'Leary Digital) AI Data Center & Energy Campus operating yet?
As of the most recent verification on the DEPLOY registry, Stratos Project (O'Leary Digital) AI Data Center & Energy Campus is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Stratos Project (O'Leary Digital) AI Data Center & Energy Campus?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Stratos Project (O'Leary Digital) AI Data Center & Energy Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Stratos Project (O'Leary Digital) AI Data Center & Energy Campus: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/oleary-stratos-hansel-valley-box-elder

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces