{"id":"25b8834d-2433-4ff8-a6dd-87c57d598562","slug":"oleary-stratos-hansel-valley-box-elder","name":"Stratos Project (O'Leary Digital) AI Data Center & Energy Campus","aliases":["Stratos","O'Leary Digital Hansel Valley"],"locationId":"7a4f1b47-88f5-4ffe-87cc-d0b4088ffe9c","lat":null,"lng":null,"locationPrecision":null,"landStatus":"greenfield","lifecycleState":"announced","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"WECC","waterSourceNotes":"Off-grid campus using closed-loop chilling plus dry (air-based) cooling with no continuous water draw; water only for one-time system fill and minor maintenance. Water purchased from private landowners' existing agricultural water rights, explicitly not from the Great Salt Lake (Utah Gov Office FAQ). A water-right change application was filed Mar 25, 2026 and withdrawn May 6, 2026 with intent to refile.","servingUtility":null,"acreage":40000,"totalBuildingSqft":null,"streetAddress":null,"notes":"Proposed ~40,000-acre self-powered AI campus in Hansel/Locomotive Valley (unincorporated Box Elder County) backed by Kevin O'Leary's O'Leary Digital and Utah's Military Installation Development Authority (MIDA); Box Elder commissioners approved the project area 2026-05-04. Phase 1 targets ~3 GW with a 9 GW full buildout, all from on-site natural gas fed by the Ruby Pipeline via a Tallgrass deal. Early stage: no air permit, financing close, or construction start confirmed, and water/environmental review remains contested.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://utahnewsdispatch.com/2026/05/04/box-elder-commissioners-approve-data-center/","date":"2026-05-04","title":"Hundreds cry out as Box Elder commissioners wave in massive data center","publisher":"Utah News Dispatch"},{"url":"https://www.sltrib.com/news/2026/05/04/hyperscale-data-center-project/","date":"2026-05-04","title":"Hyperscale data center project in Utah: Here's what we know ahead of the Box Elder County vote","publisher":"Salt Lake Tribune"}],"reviewNote":null,"createdAt":"2026-08-17T20:25:32.933Z","updatedAt":"2026-08-19T00:16:13.194Z","location":{"id":"7a4f1b47-88f5-4ffe-87cc-d0b4088ffe9c","name":"Hansel Valley","slug":"hansel-valley-utah","kind":"city","parentLocationId":"d4c6c7ee-123a-4e8a-b272-47962ebad057","region":"Utah","lat":41.8421103,"lng":-112.6193566,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:25:32.554Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"a04b4c40-4121-4cb7-b58e-a4f1e88dc105","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","companyId":null,"externalName":"O'Leary Digital","role":"developer","structureNotes":"Kevin O'Leary-backed; partnered with Utah MIDA project area","createdAt":"2026-08-17T20:25:34.597Z","company":null},{"id":"161bed80-fbbb-4eac-a41c-bdc79b6e2f42","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","companyId":null,"externalName":"Military Installation Development Authority (MIDA)","role":"developer","structureNotes":"Utah state agency sponsoring the project area","createdAt":"2026-08-17T20:25:35.359Z","company":null},{"id":"38829e97-e782-4476-bc9c-99e40f9585f9","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","companyId":null,"externalName":"Tallgrass Energy","role":"utility","structureNotes":"Prospective natural gas service via Ruby Pipeline connection","createdAt":"2026-08-17T20:25:36.110Z","company":null},{"id":"011f9e07-b00c-4171-afcb-e31816e9aa45","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","companyId":null,"externalName":"O'Leary Ventures","role":"developer","structureNotes":"Kevin O'Leary's investment firm and parent of O'Leary Digital; CEO Paul Palandjian publicly stated the >$4B Phase 1 and ~$20B early-phase capex figures. Kevin O'Leary (person) is the public backer making the larger multi-GW / $100B verbal claims.","createdAt":"2026-08-19T00:16:22.056Z","company":null}],"capacityClaims":[{"id":"817d8de2-3e71-47c6-b291-dfeab7fd5579","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","series":"announced","valueGw":9,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.midaut.org/stratos","sourceType":"press_release","evidenceTier":"reported","supersedesId":null,"note":"Approximate full-buildout on-site generation per MIDA Stratos Project Area page. Journalism (SLTrib) cites a 7.5-9 GW full-buildout range; more than double Utah's ~4 GW average statewide demand.","createdAt":"2026-08-19T00:16:13.878Z"},{"id":"c418f8e0-d841-46f6-b796-ebf13fb3b981","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","series":"announced","valueGw":0.5,"asOf":"2026-05-07T00:00:00.000Z","sourceUrl":"https://www.utahmoneywatch.com/the-real-money-behind-stratos-oleary-ventures-pegs-phase-1-at-more-than-4-billion-with-20-billion-of-expenditures-in-its-early-phases/","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Initial Phase 1 sized at ~500 MW per O'Leary Ventures CEO Paul Palandjian, scaling toward 3 GW in early phases.","createdAt":"2026-08-19T00:16:14.716Z"},{"id":"1b013380-f525-486c-87b0-c1d2aefeafa3","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","series":"announced","valueGw":3,"asOf":"2026-05-04T00:00:00.000Z","sourceUrl":"https://utahnewsdispatch.com/2026/05/04/box-elder-commissioners-approve-data-center/","sourceType":"county_docket","evidenceTier":"claimed","supersedesId":null,"note":"Phase 1 commitment ~3 GW; 9 GW full Utah buildout claimed.","createdAt":"2026-08-17T20:25:33.630Z"},{"id":"3d11c7db-9304-4c53-8d39-7bdd04f582a1","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","series":"announced","valueGw":1,"asOf":"2026-05-01T00:00:00.000Z","sourceUrl":"https://www.sltrib.com/news/2026/05/04/hyperscale-data-center-project/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Interim regulatory ceiling: Gov. Spencer Cox requested the current/first phase be capped at ~1 GW pending review; not a build commitment.","createdAt":"2026-08-19T00:16:15.401Z"}],"financialClaims":[{"id":"fdd63aee-2774-4b20-9ffe-448702a6bffd","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","kind":"capex","label":"Full buildout total","valueUsd":"100000000000","capUsd":null,"conditions":"'Could exceed $100 billion' at full buildout; aspirational full-scale figure.","asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.sltrib.com/news/2026/05/04/hyperscale-data-center-project/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:16:17.319Z"},{"id":"79a334e4-3c44-4ed0-9b4d-1689774691a6","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","kind":"incentive","label":"Upfront county impact funding","valueUsd":"16200000","capUsd":null,"conditions":"Developer commitment TO Box Elder County (not an incentive to the developer) to offset initial impacts on the county budget for essential services such as law enforcement and fire.","asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.midaut.org/stratos","sourceType":"press_release","evidenceTier":"verified","createdAt":"2026-08-19T00:16:18.152Z"},{"id":"ab98e8af-6130-4ef5-a90c-3921d4327a8e","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","kind":"tax_abatement","label":"MIDA property tax relief","valueUsd":null,"capUsd":null,"conditions":"MIDA approved property tax relief for the developers on Apr 24, 2026; specific abatement terms unspecified in sourcing.","asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.sltrib.com/news/2026/05/04/hyperscale-data-center-project/","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:16:18.940Z"},{"id":"2d95d74a-0348-4241-86b5-8970e8cb3d97","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","kind":"capex","label":"Phase 1 (~500 MW) investment","valueUsd":"4000000000","capUsd":null,"conditions":"Stated as 'more than $4 billion'; floor figure.","asOf":"2026-05-07T00:00:00.000Z","sourceUrl":"https://www.utahmoneywatch.com/the-real-money-behind-stratos-oleary-ventures-pegs-phase-1-at-more-than-4-billion-with-20-billion-of-expenditures-in-its-early-phases/","sourceType":"journalist_report","evidenceTier":"claimed","createdAt":"2026-08-19T00:16:15.784Z"},{"id":"0cc7b34e-3bb6-4aa4-94ec-ee8bb123e395","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","kind":"capex","label":"Early phases (scaling to 3 GW)","valueUsd":"20000000000","capUsd":null,"conditions":"Cumulative early-phase expenditures per O'Leary Ventures.","asOf":"2026-05-07T00:00:00.000Z","sourceUrl":"https://www.utahmoneywatch.com/the-real-money-behind-stratos-oleary-ventures-pegs-phase-1-at-more-than-4-billion-with-20-billion-of-expenditures-in-its-early-phases/","sourceType":"journalist_report","evidenceTier":"claimed","createdAt":"2026-08-19T00:16:16.550Z"}],"metricClaims":[{"id":"b6298d6c-6b94-4c9e-977f-de5460d0b4ac","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","metricType":"cooling_type","valueNumeric":null,"valueText":"Closed-loop chilling system combined with dry (air-based) cooling; no continuous water draw","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://governor.utah.gov/wp-content/uploads/FAQ-on-Stratos-Project.pdf","sourceType":"permit_filing","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:16:21.294Z"},{"id":"c9169d2d-36fc-46de-a934-b887ef96136b","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","metricType":"jobs_construction","valueNumeric":null,"valueText":"Thousands of construction jobs over an approximately ten-year period","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://governor.utah.gov/wp-content/uploads/FAQ-on-Stratos-Project.pdf","sourceType":"permit_filing","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:16:20.907Z"},{"id":"fd2588c0-337c-448b-a31c-f3331a2ebf7c","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","metricType":"jobs_permanent","valueNumeric":2000,"valueText":"~2,000 permanent jobs at full buildout (skilled trade, logistics, IT, administrative)","unit":null,"grantingJurisdiction":null,"asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://governor.utah.gov/wp-content/uploads/FAQ-on-Stratos-Project.pdf","sourceType":"permit_filing","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:16:20.523Z"}],"powerProjects":[{"id":"0349f2c3-bc77-430d-8c65-4cee846f58e2","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","name":"On-site natural gas generation (Ruby Pipeline supply)","type":"gas","capacityGw":9,"lifecycleState":"announced","sourceUrl":"https://utahnewsdispatch.com/2026/05/04/box-elder-commissioners-approve-data-center/","evidenceTier":"claimed","note":"Self-generated gas plant claimed up to 9 GW; gas via Ruby Pipeline through Tallgrass; no air permit yet.","createdAt":"2026-08-17T20:25:34.196Z"},{"id":"601a6da7-8963-4dbc-8782-cc912fe342c6","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","name":"Stratos on-site natural gas generation","type":"gas","capacityGw":9,"lifecycleState":"announced","sourceUrl":"https://finance.yahoo.com/sectors/technology/articles/kevin-oleary-plans-9-gigawatt-133729333.html","evidenceTier":"reported","note":"Behind-the-meter, off-grid; mostly natural gas fed via a direct connection to the interstate Ruby Pipeline (owned by Tallgrass Energy). Starts ~3 GW, scales toward ~9 GW. As of the state FAQ no Air Quality Notice of Intent had been submitted; nothing energized or permitted.","createdAt":"2026-08-19T00:16:19.741Z"},{"id":"3c177529-7da3-4060-b91b-a9ed77ac6e65","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","name":"Stratos on-site solar (contemplated)","type":"solar","capacityGw":null,"lifecycleState":"announced","sourceUrl":"https://governor.utah.gov/wp-content/uploads/FAQ-on-Stratos-Project.pdf","evidenceTier":"verified","note":"State FAQ notes solar is among on-site generation types contemplated (larger footprint than gas); no capacity specified.","createdAt":"2026-08-19T00:16:20.132Z"}],"facilities":[],"incidents":[],"events":[{"id":"94e01c27-4758-472e-a0d9-ff8675b41a8e","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: O'Leary Ventures","occurredAt":"2026-08-19T00:16:22.437Z","createdAt":"2026-08-19T00:16:22.437Z"},{"id":"bd83d7ac-a5e7-4143-8fa3-638115ad0c61","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tax_abatement: MIDA property tax relief","occurredAt":"2026-08-19T00:16:19.350Z","createdAt":"2026-08-19T00:16:19.350Z"},{"id":"63ca8c41-e2e6-4021-8682-f49ad7198ef3","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"incentive: Upfront county impact funding","occurredAt":"2026-08-19T00:16:18.563Z","createdAt":"2026-08-19T00:16:18.563Z"},{"id":"9a5cbc28-9ea9-4829-b342-1f8329db3eb5","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Full buildout total","occurredAt":"2026-08-19T00:16:17.772Z","createdAt":"2026-08-19T00:16:17.772Z"},{"id":"b64c1037-ab6e-41d9-874c-864e65f0ddeb","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Early phases (scaling to 3 GW)","occurredAt":"2026-08-19T00:16:16.933Z","createdAt":"2026-08-19T00:16:16.933Z"},{"id":"3bd5d49a-9b7e-44f5-85cb-1919e816814e","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Phase 1 (~500 MW) investment","occurredAt":"2026-08-19T00:16:16.164Z","createdAt":"2026-08-19T00:16:16.164Z"},{"id":"f93910d3-741e-457d-bfa7-043d61aada5c","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1","claimId":"3d11c7db-9304-4c53-8d39-7bdd04f582a1","detail":"reported · journalist_report","occurredAt":"2026-08-19T00:16:15.549Z","createdAt":"2026-08-19T00:16:15.549Z"},{"id":"ea2f3dff-d45b-4ad7-8b09-ddd978b46172","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.5","claimId":"c418f8e0-d841-46f6-b796-ebf13fb3b981","detail":"claimed · journalist_report","occurredAt":"2026-08-19T00:16:14.874Z","createdAt":"2026-08-19T00:16:14.874Z"},{"id":"e4cfdbaa-9215-41e8-9604-cf6c4b126182","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"capacity_changed","series":"announced","oldValue":"3","newValue":"9","claimId":"817d8de2-3e71-47c6-b291-dfeab7fd5579","detail":null,"occurredAt":"2026-08-19T00:16:14.175Z","createdAt":"2026-08-19T00:16:14.175Z"},{"id":"cf310839-7ca8-44cc-854f-b88fee180899","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"9","claimId":"817d8de2-3e71-47c6-b291-dfeab7fd5579","detail":"reported · press_release","occurredAt":"2026-08-19T00:16:14.026Z","createdAt":"2026-08-19T00:16:14.026Z"},{"id":"cb44010b-56db-49b9-b618-dd55e4f84374","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Tallgrass Energy","occurredAt":"2026-08-17T20:25:36.485Z","createdAt":"2026-08-17T20:25:36.485Z"},{"id":"c8ad1d23-67ff-48f7-b79e-94b16a6d4780","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Military Installation Development Authority (MIDA)","occurredAt":"2026-08-17T20:25:35.734Z","createdAt":"2026-08-17T20:25:35.734Z"},{"id":"f88194af-247a-4a96-bc37-77ffd377694c","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: O'Leary Digital","occurredAt":"2026-08-17T20:25:34.981Z","createdAt":"2026-08-17T20:25:34.981Z"},{"id":"09ba6332-f463-4b29-953a-59c4dd8d09a8","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"3","claimId":"1b013380-f525-486c-87b0-c1d2aefeafa3","detail":null,"occurredAt":"2026-08-17T20:25:33.938Z","createdAt":"2026-08-17T20:25:33.938Z"},{"id":"d2d254d4-8950-4700-83b2-410f4e12ead4","dataCenterId":"25b8834d-2433-4ff8-a6dd-87c57d598562","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"3","claimId":"1b013380-f525-486c-87b0-c1d2aefeafa3","detail":"claimed · county_docket","occurredAt":"2026-08-17T20:25:33.783Z","createdAt":"2026-08-17T20:25:33.783Z"}],"capacity_picture":{"announced_gw":9,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":9,"by_series":{"announced":{"valueGw":9,"asOf":"2026-06-01T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.midaut.org/stratos"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Stratos Project (O'Leary Digital) AI Data Center & Energy Campus","url":"https://registry.deploy.report/datacenters/oleary-stratos-hansel-valley-box-elder","address":{"@type":"PostalAddress","addressLocality":"Hansel Valley"}}}