# Stratos Project (O'Leary Digital) AI Data Center & Energy Campus

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 25b8834d-2433-4ff8-a6dd-87c57d598562
- **Type:** AI data center campus
- **Location:** Hansel Valley, Utah, United States
- **Lifecycle state:** announced
- **Announced capacity (GW):** 9

## Capacity ledger (append-only, dated, sourced)

- announced: 9 GW · reported · as of 2026-06-01 · https://www.midaut.org/stratos
- announced: 0.5 GW · claimed · as of 2026-05-07 · https://www.utahmoneywatch.com/the-real-money-behind-stratos-oleary-ventures-pegs-phase-1-at-more-than-4-billion-with-20-billion-of-expenditures-in-its-early-phases/
- announced: 3 GW · claimed · as of 2026-05-04 · https://utahnewsdispatch.com/2026/05/04/box-elder-commissioners-approve-data-center/
- announced: 1 GW · reported · as of 2026-05-01 · https://www.sltrib.com/news/2026/05/04/hyperscale-data-center-project/

## Parties


## Common questions


**What is Stratos Project (O'Leary Digital) AI Data Center & Energy Campus?**

Stratos Project (O'Leary Digital) AI Data Center & Energy Campus is an AI data center campus tracked on the DEPLOY registry, located in Hansel Valley. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will Stratos Project (O'Leary Digital) AI Data Center & Energy Campus use?**

Stratos Project (O'Leary Digital) AI Data Center & Energy Campus has 9 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.

**Is Stratos Project (O'Leary Digital) AI Data Center & Energy Campus operating yet?**

As of the most recent verification on the DEPLOY registry, Stratos Project (O'Leary Digital) AI Data Center & Energy Campus is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Stratos Project (O'Leary Digital) AI Data Center & Energy Campus?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Hundreds cry out as Box Elder commissioners wave in massive data center: https://utahnewsdispatch.com/2026/05/04/box-elder-commissioners-approve-data-center/
- Hyperscale data center project in Utah: Here's what we know ahead of the Box Elder County vote: https://www.sltrib.com/news/2026/05/04/hyperscale-data-center-project/

Canonical: https://registry.deploy.report/datacenters/oleary-stratos-hansel-valley-box-elder
JSON: https://registry.deploy.report/v1/datacenters/oleary-stratos-hansel-valley-box-elder