Google The Dalles Data Center Campus is a tracked AI data center campus in Oregon, The Dalles. Google's ~$1.8B campus on a former aluminum smelter site has multiple operational data centers under Enterprise Zone agreements (2005/2013/2015) plus newer buildings under a 2021 Strategic Investment Program agreement wi

Partially energized · Google · Former industrial site · WECC · The Dalles, Oregon, United States


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Google The Dalles Data Center Campus capacity claims
Source

Construction evidence

Dated satellite imagery of the site itself, oldest to newest, with the campus milestones that landed in each window. This is what the site looked like from orbit while announcements, permits, and energizations were dated into our ledger, so bare land, grading, and building mass tell their own story alongside the paper trail. Sentinel-2 true color, 10 m resolution, cloud-free scenes; click any frame to expand it.

2018-08-01Contains modified Copernicus Sentinel data 2018
2020-08-10Contains modified Copernicus Sentinel data 2020
2022-07-26Contains modified Copernicus Sentinel data 2022
2024-07-20Contains modified Copernicus Sentinel data 2024
2025-09-13Contains modified Copernicus Sentinel data 2025

Dated Sentinel-2 imagery, gated to hand-verified site coordinates. Milestones synthesized from the campus's own capacity ledger, financial claims, and lifecycle events; each chip links to its source. How we source and verify it: satellite construction evidence.

Per-building manifest tied to the site polygons and imagery. When we know a building's outline we render it; when we know only its year and capacity we still surface those as first-class rows so the campus total is auditable, not a headline claim. Sorted largest-first; top 6 shown by default of 12.

Google
Building sqft: 287,793
polygon on record (7 vertices)
Google
Building sqft: 287,660
polygon on record (7 vertices)
Building 75
Building sqft: 189,391
polygon on record (11 vertices)
Building 78
Building sqft: 159,802
polygon on record (17 vertices)
Building 16
Building sqft: 159,358
polygon on record (19 vertices)
Building 22
Building sqft: 119,498
polygon on record (30 vertices)

Manifest totals: 1,744,311 sqft. Rolled from the per-building rows above.

Key facts

0 GW

Energized

Google

Developer

WECC

Grid

3

Facilities tracked

On the data center map

Every tracked data center is on this map, centered on Google The Dalles Data Center Campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.
The story of Google The Dalles Data Center Campus
Announced capex
$1.8B
Jobs
200 permanent reported
Water
1.2M gal/day (5K households)
Land owner
Northwest Aluminum
Derived
Cost per job
$9M per permanent job

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterOregon(85)

The deal

utility
Northern Wasco County PUD · Local public utility district
offtaker
Avangrid · Wind PPA supplier
operator
Google · SIP/EZ agreements administered by Business Oregon
construction
Whiting-Turner Contracting Co. · General contractor for the ~$600M / two ~290,000 sq ft new-build expansion (broke ground Sept 2024).
land owner
Northwest Aluminum · Prior owner of the former smelter site; sold land to Google.

Power

Power source
grid
Grid operator
WECC
Interconnection
Water
2024 use ~434.4M gal/yr (~1.19M gpd), up from 104M gal/yr in 2012; underground water right up to 3.88M gpd acquired with smelter; city commitment up to 2M gpd by Jan 2028, potential 8M gpd with expansion. Retail water via City of The Dalles; subject of a 2022-2023 public-records dispute (The Oregonian).

Leaning Juniper IIB repower (Avangrid, Gilliam County), 0.10 GW wind, Announced. Google PPA for 100+ MW clean energy to serve The Dalles campus.

Leaning Juniper IIB (Avangrid) repowered wind farm, 0.12 GW wind, Energized. 119 MW repowered wind farm in Gilliam County; >100 MW PPA to Google delivered via Northern Wasco County PUD; repower cost up to ~$200M, ~150 construction jobs.

County water status: Severe drought (D2) in Wasco County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Silicon on site

Every AI chip publicly attributed to Google The Dalles Data Center Campus on the DEPLOY registry. Quantity hints are unstructured because underlying disclosures vary by an order of magnitude. Source links per row.

  1. as of 2024-01-01

    TPU v4 pods (major Google Cloud TPU region)

    reported

    Google Cloud

  2. as of 2024-01-01

    TPU v5p available in us-east5 (Columbus) + us-central1 (Iowa) + us-central2 (Oklahoma) — The Dalles hosts related pods

    reported

    Google Cloud

Why here

Google The Dalles Data Center Campus sits on former industrial site in Oregon, The Dalles. It connects to the WECC grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Cumulative Oregon investment since 2006
$1.8B. ~18-year cumulative figure touted by Google. journalist report
Enterprise Zone abatements (2013 + 2015 agreements)
15-year abatements expiring ~2031/32 and ~2034/35; combined projected community payments ~$45.78M; effective property-tax discount reported ~92%. permit filing
2021 Strategic Investment Program agreement (Design LLC)
Up to 2 data centers, 15-year abatement; Google pays 50% of assessed property tax on first project, 60% on second; $3M upfront per new development; plus Community Service Fee and Guaranteed Annual Payment. permit filing

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States
FAA Proposed Rule: Enabling Supersonic Overland Flight (July 2026)operational restriction · 2026-07-02 · United States

Investment, workforce and specs

Permanent jobs
>200 permanent jobs at site source
Water (gal/day)
~1.19M gpd (434.4M gal in 2024) source

Facilities at this campus

Timeline

  1. Aug 2026
    party added
    land_owner: Northwest Aluminum
  2. Sep 2026
    Current: Partially energized

Sources

963decea-f424-4814-a8de-94389e75476a · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Google The Dalles Data Center Campus?
Google The Dalles Data Center Campus is an AI data center campus tracked on the DEPLOY registry, located in The Dalles. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Google The Dalles Data Center Campus?
Google is recorded as a party to Google The Dalles Data Center Campus on the DEPLOY registry. The full party list, with each role, is on the record.
Is Google The Dalles Data Center Campus operating yet?
As of the most recent verification on the DEPLOY registry, Google The Dalles Data Center Campus is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Google The Dalles Data Center Campus?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Google The Dalles Data Center Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Google The Dalles Data Center Campus: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/google-the-dalles-wasco-county

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces