- Announced capex
- $1.8B
- Jobs
- 200 permanent reported
- Water
- 1.2M gal/day (5K households)
- Land owner
- Northwest Aluminum
- Cost per job
- $9M per permanent job
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterOregon(85)
The deal
Inherited from campus Google The Dalles Data Center Campus.
- utility
- Northern Wasco County PUD · Local public utility district
- offtaker
- Avangrid · Wind PPA supplier
- operator
- Google · SIP/EZ agreements administered by Business Oregon
- construction
- Whiting-Turner Contracting Co. · General contractor for the ~$600M / two ~290,000 sq ft new-build expansion (broke ground Sept 2024).
- land owner
- Northwest Aluminum · Prior owner of the former smelter site; sold land to Google.
Financial structure
Inherited from campus Google The Dalles Data Center Campus.
- Cumulative Oregon investment since 2006
- $1.8B. ~18-year cumulative figure touted by Google. journalist report
- Enterprise Zone abatements (2013 + 2015 agreements)
- 15-year abatements expiring ~2031/32 and ~2034/35; combined projected community payments ~$45.78M; effective property-tax discount reported ~92%. permit filing
- 2021 Strategic Investment Program agreement (Design LLC)
- Up to 2 data centers, 15-year abatement; Google pays 50% of assessed property tax on first project, 60% on second; $3M upfront per new development; plus Community Service Fee and Guaranteed Annual Payment. permit filing
Investment, workforce and specs
Inherited from campus Google The Dalles Data Center Campus.
Power
Inherited from campus Google The Dalles Data Center Campus. Live grid demand and drought overlay only render on the campus page.
- Power source
- grid
- Grid operator
- WECC
- Interconnection
- Water
- 2024 use ~434.4M gal/yr (~1.19M gpd), up from 104M gal/yr in 2012; underground water right up to 3.88M gpd acquired with smelter; city commitment up to 2M gpd by Jan 2028, potential 8M gpd with expansion. Retail water via City of The Dalles; subject of a 2022-2023 public-records dispute (The Oregonian).
Leaning Juniper IIB repower (Avangrid, Gilliam County), 0.10 GW wind, Announced. Google PPA for 100+ MW clean energy to serve The Dalles campus.
Leaning Juniper IIB (Avangrid) repowered wind farm, 0.12 GW wind, Energized. 119 MW repowered wind farm in Gilliam County; >100 MW PPA to Google delivered via Northern Wasco County PUD; repower cost up to ~$200M, ~150 construction jobs.
Facility record
On the data center map
Construction evidence
Dated satellite imagery of the site itself, oldest to newest, with the campus milestones that landed in each window. This is what the site looked like from orbit while announcements, permits, and energizations were dated into our ledger, so bare land, grading, and building mass tell their own story alongside the paper trail. Sentinel-2 true color, 10 m resolution, cloud-free scenes; click any frame to expand it.
Dated Sentinel-2 imagery, gated to hand-verified site coordinates. Milestones inherited from campus Google The Dalles Data Center Campus. How we source and verify it: satellite construction evidence.
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Sep 2026Current: under construction
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is Google The Dalles Data Center Expansion (2nd/3rd buildings)?
Who operates Google The Dalles Data Center Expansion (2nd/3rd buildings)?
Is Google The Dalles Data Center Expansion (2nd/3rd buildings) operating?
How verified is the data on Google The Dalles Data Center Expansion (2nd/3rd buildings)?
Deploy Watch
Track Google The Dalles Data Center Expansion (2nd/3rd buildings) on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). Google The Dalles Data Center Expansion (2nd/3rd buildings): data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/google-the-dalles-expansion-or
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/google-the-dalles-expansion-or.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/google-the-dalles-expansion-or
- Data documentation: /data
- Query this programmatically: Deploy MCP