{"id":"3855ca30-2f90-46ea-9f56-34907bfdf94c","slug":"google-dte-van-buren-michigan","name":"Google / DTE 'Project Cannoli' — Van Buren Township","aliases":["Project Cannoli","Van Buren Township data center"],"locationId":"b0c1aa40-cd4f-47bb-9a6b-f69b1cb2f30d","lat":42.22,"lng":-83.48,"locationPrecision":"city","landStatus":"greenfield","lifecycleState":"permitted","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"MISO","waterSourceNotes":null,"servingUtility":null,"acreage":280,"totalBuildingSqft":null,"streetAddress":null,"notes":"Panattoni-developed ~280-acre site ('Project Cannoli') near I-94/Haggerty Rd with Google confirmed as end user (Mar 2026); ~1 GW data-center IT load, served by DTE building ~2.7 GW of new resources (1.6 GW renewable + 450 MW storage, no new fossil plants). DTE's special contract filed with MPSC Mar 2026 was forced into a contested case by the state AG; exact MPSC U-docket number and EGLE air permit status not surfaced.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.detroitnews.com/story/news/local/michigan/2026/03/17/google-weighs-joining-van-buren-township-data-center-project-dte-energy/89187228007/","date":"2026-03-17","title":"Google weighs joining Van Buren Township data center project, DTE Energy","publisher":"The Detroit News"},{"url":"https://planetdetroit.org/2026/05/google-data-center-substation/","date":"2026-05-14","title":"Van Buren Township OKs Google data center substation","publisher":"Planet Detroit"}],"reviewNote":null,"createdAt":"2026-08-17T20:21:14.642Z","updatedAt":"2026-08-28T14:22:23.889Z","location":{"id":"b0c1aa40-cd4f-47bb-9a6b-f69b1cb2f30d","name":"Van Buren Township","slug":"van-buren-township-michigan","kind":"city","parentLocationId":"0a54c4e7-bc0e-4913-a6ae-ed3d29b01882","region":"Michigan","lat":42.22,"lng":-83.48,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:21:14.263Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"814eb4d9-36f4-4cb4-b28c-3efba4deea77","dataCenterId":"3855ca30-2f90-46ea-9f56-34907bfdf94c","companyId":null,"externalName":"Panattoni Development","role":"developer","structureNotes":"site developer, 'Project Cannoli'","createdAt":"2026-08-17T20:21:16.698Z","company":null},{"id":"da48f98e-d30b-405e-be6d-ef0c41cd647b","dataCenterId":"3855ca30-2f90-46ea-9f56-34907bfdf94c","companyId":null,"externalName":"DTE Energy","role":"utility","structureNotes":"20-year special contract, MPSC contested case","createdAt":"2026-08-17T20:21:18.244Z","company":null},{"id":"b56d0a84-3bc6-49d9-afc6-c67c1d0a3920","dataCenterId":"3855ca30-2f90-46ea-9f56-34907bfdf94c","companyId":"0ed0d0e3-6e8b-4701-a812-f13221399dd4","externalName":"Google","role":"offtaker","structureNotes":"confirmed end user Mar 2026","createdAt":"2026-08-17T20:21:17.484Z","company":{"id":"0ed0d0e3-6e8b-4701-a812-f13221399dd4","name":"Google","slug":"google"}}],"capacityClaims":[{"id":"4d2cb263-3212-488c-8cf9-79bbdbef921b","dataCenterId":"3855ca30-2f90-46ea-9f56-34907bfdf94c","series":"announced","valueGw":1,"asOf":"2026-03-17T00:00:00.000Z","sourceUrl":"https://www.detroitnews.com/story/news/local/michigan/2026/03/17/google-weighs-joining-van-buren-township-data-center-project-dte-energy/89187228007/","sourceType":"utility_filing","evidenceTier":"reported","supersedesId":null,"note":"~1 GW data-center IT load per DTE special-contract reporting","createdAt":"2026-08-17T20:21:15.326Z"}],"financialClaims":[{"id":"bf58ae98-8236-449b-b3f0-6a032c5d51e4","dataCenterId":"3855ca30-2f90-46ea-9f56-34907bfdf94c","kind":"incentive","label":"Google energy affordability pledge","valueUsd":"10000000","capUsd":null,"conditions":"Google pledge to scale energy affordability initiatives in Michigan (company commitment, not an incentive received)","asOf":"2026-06-01T00:00:00.000Z","sourceUrl":"https://www.wxyz.com/news/google-announces-its-behind-massive-data-center-proposal-in-van-buren-township","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T01:33:55.294Z"}],"metricClaims":[],"powerProjects":[{"id":"0dd5f1f9-c400-4666-bb4c-0f2f1d70fecd","dataCenterId":"3855ca30-2f90-46ea-9f56-34907bfdf94c","name":"DTE renewable resources for Van Buren load","type":"solar","capacityGw":1.6,"lifecycleState":"announced","sourceUrl":"https://www.detroitnews.com/story/news/local/michigan/2026/03/17/google-weighs-joining-van-buren-township-data-center-project-dte-energy/89187228007/","evidenceTier":"reported","note":"1.6 GW renewable in DTE 2.7 GW build-out to serve load","createdAt":"2026-08-17T20:21:15.942Z"},{"id":"5131ca75-1f2b-4836-a6d0-afd0dcfed483","dataCenterId":"3855ca30-2f90-46ea-9f56-34907bfdf94c","name":"DTE storage for Van Buren load","type":"storage","capacityGw":0.45,"lifecycleState":"announced","sourceUrl":"https://www.detroitnews.com/story/news/local/michigan/2026/03/17/google-weighs-joining-van-buren-township-data-center-project-dte-energy/89187228007/","evidenceTier":"reported","note":"450 MW storage","createdAt":"2026-08-17T20:21:16.321Z"},{"id":"c2e19dd2-e869-456b-87ef-5eef64b9cdd4","dataCenterId":"3855ca30-2f90-46ea-9f56-34907bfdf94c","name":"DTE renewable generation for Google load","type":"solar","capacityGw":1.6,"lifecycleState":"announced","sourceUrl":"https://planetdetroit.org/2026/03/google-dte-data-center-van-buren/","evidenceTier":"reported","note":"1.6 GW renewable within the 2.7 GW package of new DTE resources to serve the data center","createdAt":"2026-08-19T01:33:56.177Z"},{"id":"001ac72d-6a83-42f5-bae3-efd13c1a7142","dataCenterId":"3855ca30-2f90-46ea-9f56-34907bfdf94c","name":"DTE energy storage for Google load","type":"storage","capacityGw":0.45,"lifecycleState":"announced","sourceUrl":"https://planetdetroit.org/2026/03/google-dte-data-center-van-buren/","evidenceTier":"reported","note":"450 MW of energy storage within the 2.7 GW package","createdAt":"2026-08-19T01:33:56.565Z"}],"facilities":[],"incidents":[],"events":[{"id":"7ee83c0c-c9b5-4d17-b688-a612f100a857","dataCenterId":"3855ca30-2f90-46ea-9f56-34907bfdf94c","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"incentive: Google energy affordability pledge","occurredAt":"2026-08-19T01:33:55.797Z","createdAt":"2026-08-19T01:33:55.797Z"},{"id":"8f8cfdf9-ee09-4d15-9982-b59f1505599f","dataCenterId":"3855ca30-2f90-46ea-9f56-34907bfdf94c","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: DTE Energy","occurredAt":"2026-08-17T20:21:18.686Z","createdAt":"2026-08-17T20:21:18.686Z"},{"id":"a8565d92-ee23-4f16-8e98-b4ac7d20f294","dataCenterId":"3855ca30-2f90-46ea-9f56-34907bfdf94c","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"offtaker: Google","occurredAt":"2026-08-17T20:21:17.866Z","createdAt":"2026-08-17T20:21:17.866Z"},{"id":"5a10244e-ebb3-403b-8103-2f569412e3fa","dataCenterId":"3855ca30-2f90-46ea-9f56-34907bfdf94c","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Panattoni Development","occurredAt":"2026-08-17T20:21:17.081Z","createdAt":"2026-08-17T20:21:17.081Z"},{"id":"f2387e4e-3c36-4c9e-8b01-498bbc4800e4","dataCenterId":"3855ca30-2f90-46ea-9f56-34907bfdf94c","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1","claimId":"4d2cb263-3212-488c-8cf9-79bbdbef921b","detail":null,"occurredAt":"2026-08-17T20:21:15.700Z","createdAt":"2026-08-17T20:21:15.700Z"},{"id":"740223e2-de68-4628-84b5-5a84c2006494","dataCenterId":"3855ca30-2f90-46ea-9f56-34907bfdf94c","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1","claimId":"4d2cb263-3212-488c-8cf9-79bbdbef921b","detail":"reported · utility_filing","occurredAt":"2026-08-17T20:21:15.485Z","createdAt":"2026-08-17T20:21:15.485Z"}],"capacity_picture":{"announced_gw":1,"contracted_gw":null,"under_construction_gw":null,"energized_gw":null,"announced_minus_energized_gw":1,"by_series":{"announced":{"valueGw":1,"asOf":"2026-03-17T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.detroitnews.com/story/news/local/michigan/2026/03/17/google-weighs-joining-van-buren-township-data-center-project-dte-energy/89187228007/"},"contracted":null,"under_construction":null,"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Google / DTE 'Project Cannoli' — Van Buren Township","url":"https://registry.deploy.report/datacenters/google-dte-van-buren-michigan","geo":{"@type":"GeoCoordinates","latitude":42.22,"longitude":-83.48},"address":{"@type":"PostalAddress","addressLocality":"Van Buren Township"}}}