Data center campus
Alterra Marshall Technology & Energy Center
Alterra Marshall Technology & Energy Center is an AI data center campus developed by Alterra Development in Michigan, Marshall. 1.40 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Stalled · Alterra Development · greenfield · Marshall, Michigan, United States
Capacity: announced vs energized
Announced-to-energized gap: 1.40 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2027. 15 months away. Claimed by City of Marshall (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 1.40 GW | 2025-12-18 | reported | journalist report |
Key facts
Lifecycle
Announced
Energized
Alterra Development
Developer
Location
Land
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on Alterra Marshall Technology & Energy Center. Pan or zoom out to see how close rivals are building.
- Announced capex
- $1M
- Jobs
- 300 permanent reported
- Cooling
- Closed-loop liquid cooling (proposed)
- Grid
- Frozen locally, and shrinking: Marshall has a moratorium that blocks approval of any data center until at least August 2027. The developer has since dropped the on-site gas plant that would have carried a gigawatt, cutting the projected power demand by about 60 percent.
- Land owner
- City of Marshall Local Development Finance Authority
- Cost per MW
- $800/MW
- Cost per job
- $4K per permanent job
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterMichigan(59)
The deal
- developer
- Alterra Development · Toronto-based; founder James Jarvis; bought Brooks Industrial Park land from Marshall LDFA.
- land owner
- City of Marshall Local Development Finance Authority · Land seller; authorized sale of the 270-acre parcel Oct 30 2025.
Power
- Power source
- mixed
- Interconnection
- Frozen locally, and shrinking: Marshall has a moratorium that blocks approval of any data center until at least August 2027. The developer has since dropped the on-site gas plant that would have carried a gigawatt, cutting the projected power demand by about 60 percent.
- Water
- Closed-loop liquid cooling proposed to minimize water use; developer said it would not draw from Stuart Lake (reported, Dec 2025). No gpd figure sourced.
Grid import (peak), 0.40 GW grid interconnect, Announced. Up to ~400 MW grid import at peak; MISO region, supplying utility unconfirmed.
On-site natural gas turbine plant, 1 GW gas, Announced. ~1,000 MW behind-the-meter gas; air permit not yet filed.
Marshall Technology & Energy Center on-site gas plant, 1 GW gas, Cancelled. ~1,000 MW on-site natural-gas turbines originally proposed; Alterra later reportedly decided not to build the gas plant (mayor's statement, Aug 2026), cutting project energy use ~60%.
County water status: No drought in Calhoun County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Alterra Marshall Technology & Energy Center sits on greenfield in Michigan, Marshall. It draws on mixed power, interconnection is Frozen locally, and shrinking: Marshall has a moratorium that blocks approval of any data center until at least August 2027. The developer has since dropped the on-site gas plant that would have carried a gigawatt, cutting the projected power demand by about 60 percent.. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- 270-acre land purchase (Brooks Industrial Park)
- $1M. LDFA-authorized sale of the 270-acre parcel; total project capex characterized only as 'billions' (no figure). journalist report
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
Timeline
- Aug 2026party addedland_owner: City of Marshall Local Development Finance Authority
- Sep 2026Current: Stalled
Sources
- Data center, gas generation plant proposed in Marshall
- Marshall data center moratorium delays development by at least one year
- New Technology Park planned for Marshall
f6b83182-0a0d-448e-9e52-8aed60c10086 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Alterra Marshall Technology & Energy Center?
How much power will Alterra Marshall Technology & Energy Center use?
Who is building Alterra Marshall Technology & Energy Center?
Is Alterra Marshall Technology & Energy Center operating yet?
How verified is the data on Alterra Marshall Technology & Energy Center?
Deploy Watch
Track Alterra Marshall Technology & Energy Center on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Alterra Marshall Technology & Energy Center: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/alterra-marshall-michigan
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/alterra-marshall-michigan.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/alterra-marshall-michigan
- Data documentation: /data
- Query this programmatically: Deploy MCP