DEPLOY

Data center facility

Crusoe Cheyenne ("Jade") Campus

Crusoe · Cheyenne. Every figure below is individually sourced and dated.


Part of the tracked campus Project Jade (Crusoe / Tallgrass) AI Data Center Campus.

The story of Crusoe Cheyenne ("Jade") Campusinherited from campus Project Jade (Crusoe / Tallgrass) AI Data Center Campus
Announced capex
$50B
Cooling
closed-loop cooling
Grid
WECC · Bring your own power: the campus is paired with the Cheyenne Power Hub, a dedicated 2.7 GW gas plant Tallgrass is building beside it inside the same industrial park, so the compute build does not wait on new grid capacity.
Derived
Cost per MW
$5M/MW

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterWyoming(26)

The deal

Inherited from campus Project Jade (Crusoe / Tallgrass) AI Data Center Campus.

utility
Tallgrass Energy · Builds BFC Power / Cheyenne Power Hub and CO2 sequestration hub
financier
Blackstone Inc. · Listed by Global Energy Monitor as parent/owner behind Tallgrass Energy on the BFC Power / Cheyenne Power Hub. Tracker-sourced.
developer
Crusoe · Develops the AI data center campus

Financial structure

Inherited from campus Project Jade (Crusoe / Tallgrass) AI Data Center Campus.

Total campus capex (Crusoe/Project Jade)
$50B. Reported as 'more than $50 billion' total capital expenditure across full build-out. journalist report
Tallgrass energy infrastructure investment
$7B. $7 billion for on-site natural gas power generation (BFC Power / Cheyenne Power Hub). journalist report

Investment, workforce and specs

Inherited from campus Project Jade (Crusoe / Tallgrass) AI Data Center Campus.

Capex
more than $50 billion total campus capex source
Cooling
closed-loop cooling source
Construction jobs
as many as 5,000 construction workers source

Power

Inherited from campus Project Jade (Crusoe / Tallgrass) AI Data Center Campus. Live grid demand and drought overlay only render on the campus page.

Power source
behind the meter gas
Grid operator
WECC
Interconnection
Bring your own power: the campus is paired with the Cheyenne Power Hub, a dedicated 2.7 GW gas plant Tallgrass is building beside it inside the same industrial park, so the compute build does not wait on new grid capacity.
Water
On-site deep groundwater wells drilled below the aquifers that supply Laramie County; closed-loop cooling to minimize consumption. Reported initial fill roughly equivalent to 20 households and ongoing annual use less than three households (Cowboy State Daily).

BFC Power / Cheyenne Power Hub, 2.70 GW gas, Permitted. 2.7 GW natural gas-fired generation on 659 acres, built by Tallgrass; $7B investment.

Bloom Energy fuel cells, other, Announced. Fuel cells cited in bring-your-own-power model; capacity unspecified.

BFC Power and Cheyenne Power Hub, 2.70 GW gas, Permitted. 2.7 GW new on-site natural gas generation dedicated to the campus; per Global Energy Monitor configured as two ~1,350 MW combined-cycle units plus aeroderivative turbines. Laramie County site plan approved 2026-01-05; developed by Tallgrass Energy; CO2 sequestration reported up to ~10.6M metric tons/yr. GEM status: pre-construction.

Bloom Energy fuel cell yard, other, Announced. Bloom Energy fuel cells cited as supplemental on-site generation alongside gas turbines.

Facility record

planned

Status

hyperscale

Type

Crusoe

Operator

Cheyenne

Location

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 1.8 GW initial, scalable to ~10 GW (claimed) · source
  • record: Crusoe Cheyenne ("Jade") Campus (reported) · source
  • status: planned; Crusoe exited June 2026 (Google now developer, reflagged Project Tembo) - operator attribution needs review (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Sep 2026
    Current: planned

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Crusoe Cheyenne ("Jade") Campus?
Crusoe Cheyenne ("Jade") Campus is a data center facility record on the DEPLOY registry, in Cheyenne. Every fact on the record is individually sourced and dated.
Who operates Crusoe Cheyenne ("Jade") Campus?
Crusoe operates Crusoe Cheyenne ("Jade") Campus, per the sourced record on the DEPLOY registry.
Is Crusoe Cheyenne ("Jade") Campus operating?
Crusoe Cheyenne ("Jade") Campus is recorded as planned on the DEPLOY registry. Each figure traces to a source.
How verified is the data on Crusoe Cheyenne ("Jade") Campus?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Crusoe Cheyenne ("Jade") Campus on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Crusoe Cheyenne ("Jade") Campus: data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/crusoe-cheyenne-wy-jade

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces