{"id":"e78a37e6-9963-4310-bea3-17e1016bf4ca","slug":"meta-ohio-new-albany","name":"Meta New Albany Data Center","aliases":[],"operatorCompanyId":"303ca7c0-45ce-4503-97e7-d5e0d5adb2bb","parentCampusId":"d7c13110-4def-4903-9828-a30b405f3afb","lat":null,"lng":null,"streetAddress":null,"locationId":"c8245e03-38b0-4243-9753-af44aa940c35","status":"operating","facilityType":"hyperscale","criticalItMw":null,"buildingSqft":null,"yearOperational":null,"yearAnnounced":null,"servingUtility":null,"wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"city","reviewStatus":"reviewed","sources":[{"url":"https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/"}],"notes":null,"createdAt":"2026-08-18T03:20:48.440Z","updatedAt":"2026-08-29T19:10:19.671Z","operator":{"name":"Meta","slug":"meta"},"parentCampus":{"id":"d7c13110-4def-4903-9828-a30b405f3afb","slug":"meta-prometheus-ohio","name":"Meta Prometheus Data Center (New Albany)","aliases":[],"locationId":"c8245e03-38b0-4243-9753-af44aa940c35","lat":40.0652,"lng":-82.7497,"locationPrecision":"exact","landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Prometheus is Meta's ~1 GW New Albany supercluster (5 traditional buildings plus 7 weatherproof 'tent' structures on ~740 acres at 1500 Beech Road), billed as the world's first gigawatt-class AI data center and slated to come fully online by end of 2026. As of May 2026 more than 500 MW of AI compute was reported already installed, so it is partially energized rather than fully built. Power is a mix: Williams' Socrates South behind-the-meter gas (~200 MW firm) under construction, plus contracted renewables (~800 MW) and nuclear PPAs (Vistra, Constellation, plus future Oklo/TerraPower).","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://measuredai.substack.com/p/meta-prometheus-google-ohio","title":"Meta's Prometheus and Google's Central Ohio Cluster: An AI Data Center Primer","sourceName":"MeasuredAI"},{"url":"https://www.nbc4i.com/news/local-news/new-albany/meet-prometheus-worlds-highest-capacity-data-center-slated-to-open-in-ohio-in-2026/","title":"Meet Prometheus: World's highest capacity data center slated to open in Ohio in 2026","sourceName":"NBC4 WCMH-TV"},{"url":"https://www.nbc4i.com/news/local-news/new-albany/meta-will-use-nuclear-power-for-its-new-albany-a-i-data-center/","title":"Meta will use nuclear power for its New Albany A.I. data center","sourceName":"NBC4 WCMH-TV"}],"reviewNote":null,"createdAt":"2026-08-17T18:11:19.103Z","updatedAt":"2026-08-29T17:40:05.621Z","parties":[{"id":"71f75d85-093b-4cf5-a1c1-6ff75a716e8c","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","companyId":null,"externalName":"AEP Ohio","role":"utility","structureNotes":"Grid interconnection utility.","createdAt":"2026-08-17T18:11:24.664Z","company":null},{"id":"3865a489-99b1-4f69-aad8-6d76f844558e","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","companyId":null,"externalName":"PJM","role":"grid_operator","structureNotes":"AEP Ohio operates within PJM Interconnection.","createdAt":"2026-08-17T18:11:25.422Z","company":null},{"id":"4af536b3-7249-4a32-9e36-9e7986bd116d","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","companyId":null,"externalName":"Williams Companies","role":"construction","structureNotes":"Building the Socrates South behind-the-meter gas facility.","createdAt":"2026-08-17T18:11:26.197Z","company":null},{"id":"638b9f9f-dc63-4aec-94b3-043126dde32e","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","companyId":null,"externalName":"Vistra / Constellation / Oklo / TerraPower","role":"utility","structureNotes":"Nuclear power counterparties (PPAs and future SMR/advanced-reactor deals).","createdAt":"2026-08-17T18:11:26.944Z","company":null},{"id":"2da4eca9-45fe-44ff-97f9-93ab7634006d","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","companyId":"a9a34db8-5719-4789-b681-7ba6643a92b2","externalName":"Meta Platforms","role":"developer","structureNotes":"Owner-operator; New Albany campus.","createdAt":"2026-08-17T18:11:23.146Z","company":{"id":"a9a34db8-5719-4789-b681-7ba6643a92b2","name":"Meta Platforms","slug":"meta-platforms"}},{"id":"c2995093-baa0-4500-bed7-4d03f5feecf3","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","companyId":"a9a34db8-5719-4789-b681-7ba6643a92b2","externalName":"Meta Platforms","role":"tenant","structureNotes":"Self-tenant; AI supercluster compute.","createdAt":"2026-08-17T18:11:23.915Z","company":{"id":"a9a34db8-5719-4789-b681-7ba6643a92b2","name":"Meta Platforms","slug":"meta-platforms"}}],"financialClaims":[{"id":"46905476-9e01-4eeb-bc3f-f3a07d90afbf","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","kind":"capex","label":"Meta New Albany campus investment (to date)","valueUsd":"1500000000","capUsd":null,"conditions":"Cumulative since breaking ground in 2017; understates full Prometheus buildout.","asOf":"2026-05-01T00:00:00.000Z","sourceUrl":"https://measuredai.substack.com/p/meta-prometheus-google-ohio","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-17T18:11:22.376Z"}],"metricClaims":[],"powerProjects":[{"id":"77b9c360-3a61-450a-b5ee-2923cfc65b0c","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","name":"Williams Socrates South (behind-the-meter gas)","type":"gas","capacityGw":0.2,"lifecycleState":"under_construction","sourceUrl":"https://measuredai.substack.com/p/meta-prometheus-google-ohio","evidenceTier":"reported","note":"~307.5 MW nameplate, ~258 MW at design ambient, 200 MW firm; construction began June 2025, targeted before end of 2026.","createdAt":"2026-08-17T18:11:21.161Z"},{"id":"bfd86379-4d79-4a11-a6a6-9f89d1824674","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","name":"Vistra Ohio nuclear PPA","type":"nuclear","capacityGw":2.1,"lifecycleState":"financed","sourceUrl":"https://www.nbc4i.com/news/local-news/new-albany/meta-will-use-nuclear-power-for-its-new-albany-a-i-data-center/","evidenceTier":"reported","note":"Meta to buy >2.1 GW from two Vistra nuclear plants in Ohio plus expansions; also TerraPower, Oklo (Aurora Powerhouse, Pike County) and Constellation agreements.","createdAt":"2026-08-17T18:11:21.535Z"},{"id":"a23d3418-b428-4f12-b4e8-91891cae4dc6","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","name":"Contracted renewables (Ohio solar / Indiana wind)","type":"solar_storage","capacityGw":0.8,"lifecycleState":"financed","sourceUrl":"https://measuredai.substack.com/p/meta-prometheus-google-ohio","evidenceTier":"reported","note":"Over 800 MW of renewable energy contracted.","createdAt":"2026-08-17T18:11:21.918Z"}],"capacityClaims":[{"id":"228dd5de-1edc-4e06-b4ca-be483e4224f0","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","series":"announced","valueGw":1,"asOf":"2026-05-01T00:00:00.000Z","sourceUrl":"https://measuredai.substack.com/p/meta-prometheus-google-ohio","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"~1 GW spanning multiple buildings; described as world's first 1 GW-class data center.","createdAt":"2026-08-17T18:11:19.800Z"},{"id":"a834afe5-e82f-446d-9e0b-f2fa2d7b80ce","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","series":"energized","valueGw":0.5,"asOf":"2026-05-01T00:00:00.000Z","sourceUrl":"https://measuredai.substack.com/p/meta-prometheus-google-ohio","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"More than 500 MW of AI compute reported already installed as of May 2026; full campus targeted to come online by end of 2026.","createdAt":"2026-08-17T18:11:20.627Z"}],"events":[{"id":"0bdc36e9-1c0f-4ad1-b46b-540eb2fdb617","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Vistra / Constellation / Oklo / TerraPower","occurredAt":"2026-08-17T18:11:27.320Z","createdAt":"2026-08-17T18:11:27.320Z"},{"id":"fbb25e22-b561-4d1f-92f0-5234518d0385","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"construction: Williams Companies","occurredAt":"2026-08-17T18:11:26.568Z","createdAt":"2026-08-17T18:11:26.568Z"},{"id":"ff8b8fbb-363c-41ec-861a-b7f9c5ea356b","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"grid_operator: PJM","occurredAt":"2026-08-17T18:11:25.814Z","createdAt":"2026-08-17T18:11:25.814Z"},{"id":"c912848b-592f-47c2-b137-9a3cebf3a05a","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: AEP Ohio","occurredAt":"2026-08-17T18:11:25.039Z","createdAt":"2026-08-17T18:11:25.039Z"},{"id":"ff1734a9-0f0e-4bbc-b700-c0b1a90d97c4","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: Meta Platforms","occurredAt":"2026-08-17T18:11:24.291Z","createdAt":"2026-08-17T18:11:24.291Z"},{"id":"550a3811-448d-41b0-8197-388666b61dff","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Meta Platforms","occurredAt":"2026-08-17T18:11:23.530Z","createdAt":"2026-08-17T18:11:23.530Z"},{"id":"2d252f8e-c93a-4c95-b35e-39aed0d17a74","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Meta New Albany campus investment (to date)","occurredAt":"2026-08-17T18:11:22.760Z","createdAt":"2026-08-17T18:11:22.760Z"},{"id":"74860686-9f32-49eb-b568-3eeee6500907","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0.5","claimId":"a834afe5-e82f-446d-9e0b-f2fa2d7b80ce","detail":null,"occurredAt":"2026-08-17T18:11:20.932Z","createdAt":"2026-08-17T18:11:20.932Z"},{"id":"f87fb1ae-9dea-468e-a51f-e933d4b9708e","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.5","claimId":"a834afe5-e82f-446d-9e0b-f2fa2d7b80ce","detail":"reported · journalist_report","occurredAt":"2026-08-17T18:11:20.779Z","createdAt":"2026-08-17T18:11:20.779Z"},{"id":"e20266bf-60af-41d7-9c26-99854f50a25b","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1","claimId":"228dd5de-1edc-4e06-b4ca-be483e4224f0","detail":null,"occurredAt":"2026-08-17T18:11:20.099Z","createdAt":"2026-08-17T18:11:20.099Z"},{"id":"04a21676-ddf5-49b7-93eb-bb6266e680e2","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1","claimId":"228dd5de-1edc-4e06-b4ca-be483e4224f0","detail":"claimed · journalist_report","occurredAt":"2026-08-17T18:11:19.950Z","createdAt":"2026-08-17T18:11:19.950Z"}]},"location":{"name":"New Albany","slug":"new-albany-ohio","kind":"city","lat":40.09,"lng":-82.71},"evidence":[{"id":"9ad30a42-f8f9-4b95-8c6d-f4e3546aa6c3","facilityId":"e78a37e6-9963-4310-bea3-17e1016bf4ca","field":"capex_usd","value":"1500000000","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:20:48.816Z"},{"id":"7fdacac1-fbad-4f00-abae-844b960a8c9f","facilityId":"e78a37e6-9963-4310-bea3-17e1016bf4ca","field":"jobs_construction","value":"1200","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:20:48.816Z"},{"id":"7b2b462a-8870-4308-82c1-483c9519b696","facilityId":"e78a37e6-9963-4310-bea3-17e1016bf4ca","field":"jobs_permanent","value":"300","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:20:48.816Z"},{"id":"510ad870-7751-47ce-bf39-2b45ecd4e9ea","facilityId":"e78a37e6-9963-4310-bea3-17e1016bf4ca","field":"record","value":"Meta New Albany Data Center","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:20:48.816Z"}],"resolved_facts":{"capex_usd":{"id":"9ad30a42-f8f9-4b95-8c6d-f4e3546aa6c3","facilityId":"e78a37e6-9963-4310-bea3-17e1016bf4ca","field":"capex_usd","value":"1500000000","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:20:48.816Z"},"jobs_construction":{"id":"7fdacac1-fbad-4f00-abae-844b960a8c9f","facilityId":"e78a37e6-9963-4310-bea3-17e1016bf4ca","field":"jobs_construction","value":"1200","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:20:48.816Z"},"jobs_permanent":{"id":"7b2b462a-8870-4308-82c1-483c9519b696","facilityId":"e78a37e6-9963-4310-bea3-17e1016bf4ca","field":"jobs_permanent","value":"300","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:20:48.816Z"},"record":{"id":"510ad870-7751-47ce-bf39-2b45ecd4e9ea","facilityId":"e78a37e6-9963-4310-bea3-17e1016bf4ca","field":"record","value":"Meta New Albany Data Center","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:20:48.816Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Meta New Albany Data Center","url":"https://registry.deploy.report/datacenters/facilities/meta-ohio-new-albany","address":{"@type":"PostalAddress","addressLocality":"New Albany"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Meta"}]}}