{"id":"e78a37e6-9963-4310-bea3-17e1016bf4ca","slug":"meta-ohio-new-albany","name":"Meta New Albany Data Center","aliases":[],"operatorCompanyId":"303ca7c0-45ce-4503-97e7-d5e0d5adb2bb","parentCampusId":"d7c13110-4def-4903-9828-a30b405f3afb","lat":null,"lng":null,"streetAddress":null,"locationId":"c8245e03-38b0-4243-9753-af44aa940c35","status":"operating","facilityType":"hyperscale","criticalItMw":null,"buildingSqft":null,"yearOperational":null,"yearAnnounced":null,"servingUtility":null,"wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"city","reviewStatus":"reviewed","sources":[{"url":"https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/"}],"notes":null,"createdAt":"2026-08-18T03:20:48.440Z","updatedAt":"2026-08-29T19:10:19.671Z","operator":{"name":"Meta","slug":"meta"},"parentCampus":{"id":"d7c13110-4def-4903-9828-a30b405f3afb","slug":"meta-prometheus-ohio","name":"Meta Prometheus Data Center (New Albany)","aliases":[],"locationId":"c8245e03-38b0-4243-9753-af44aa940c35","lat":40.0652,"lng":-82.7497,"locationPrecision":"exact","landStatus":"private","lifecycleState":"partially_energized","powerSourceMix":"mixed","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"PJM","waterSourceNotes":null,"servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Prometheus is Meta's ~1 GW New Albany supercluster (5 traditional buildings plus 7 weatherproof 'tent' structures on ~740 acres at 1500 Beech Road), billed as the world's first gigawatt-class AI data center and slated to come fully online by end of 2026. As of May 2026 more than 500 MW of AI compute was reported already installed, so it is partially energized rather than fully built. Power is a mix: Williams' Socrates South behind-the-meter gas (~200 MW firm) under construction, plus contracted renewables (~800 MW) and nuclear PPAs (Vistra, Constellation, plus future Oklo/TerraPower).","keyFacts":[{"label":"Campus capacity (company-claimed)","value":"1 GW or more at New Albany, Ohio once complete"},{"label":"Named supercluster","value":"Prometheus"},{"label":"Nuclear offtake (company-claimed)","value":"Vistra, TerraPower and Oklo deals support up to 6.6 GW of clean energy by 2035."},{"label":"Ohio nuclear partners","value":"Vistra uprates at Perry, Davis-Besse and Beaver Valley (433 MW); Oklo campus in Pike County up to 1.2 GW."},{"label":"On-site gas (reported, unconfirmed)","value":"Reports describe tent-style halls and Williams behind-the-meter gas plants; not confirmed by Meta."},{"label":"Neo Power plant (Oct 2026)","value":"OPSB case for a 500 MW gas plus 260 MW battery plant in Licking County; Meta link claimed, not confirmed."},{"label":"Phase one complete (company-stated, Oct 2026)","value":"Phase one of Prometheus is complete and trained Meta's Muse models. Hundreds of thousands of GPUs run as one cluster, scaling toward about 1 million GPUs."},{"label":"Training reliability (company-stated, Oct 2026)","value":"Over 85% goodput on pre-training and over 90% on RL runs. Mean time between interruptions was about 47,000 GPU hours, since raised past 54,000."},{"label":"GPU platforms (company-stated, Oct 2026)","value":"NVIDIA GB200 NVL72 (Catalina) and GB300 NVL72 (Clemente) in production; Vera Rubin NVL72 (San Miguel) is next."},{"label":"Building mix (company-stated, Oct 2026)","value":"Free-air buildings, rapid-deployment structures, leased partner capacity and one purpose-built AI building with closed-loop facility liquid cooling."}],"reviewStatus":"reviewed","sources":[{"url":"https://measuredai.substack.com/p/meta-prometheus-google-ohio","title":"Meta's Prometheus and Google's Central Ohio Cluster: An AI Data Center Primer","sourceName":"MeasuredAI"},{"url":"https://www.nbc4i.com/news/local-news/new-albany/meet-prometheus-worlds-highest-capacity-data-center-slated-to-open-in-ohio-in-2026/","title":"Meet Prometheus: World's highest capacity data center slated to open in Ohio in 2026","sourceName":"NBC4 WCMH-TV"},{"url":"https://www.nbc4i.com/news/local-news/new-albany/meta-will-use-nuclear-power-for-its-new-albany-a-i-data-center/","title":"Meta will use nuclear power for its New Albany A.I. data center","sourceName":"NBC4 WCMH-TV"},{"url":"https://about.fb.com/news/2026/01/meta-nuclear-energy-projects-power-american-ai-leadership/","title":"Meta Announces Nuclear Energy Projects (Prometheus / New Albany)"},{"url":"https://about.fb.com/news/2026/04/infrastructure-explained-meta-data-centers/","title":"Infrastructure Explained: Data Centers (New Albany 1GW+)"},{"url":"https://opsb.ohio.gov/cases/26-0627-el-bgn","title":"26-0627-EL-BGN: Neo Power Generation Facility","sourceName":"Ohio Power Siting Board"},{"url":"https://www.thereportingproject.org/tuesday-hearing-about-a-gas-fired-power-plant-in-licking-county-is-among-6-proposed-or-under-construction/","title":"Tuesday hearing about a gas-fired power plant in Licking County is among 6 proposed or under construction","sourceName":"The Reporting Project (Denison University)","publishedAt":"2026-10-02"},{"url":"https://freepress.org/article/tell-ohio-power-siting-board-don-t-give-meta-another-polluting-gas-plant","title":"Tell the Ohio Power Siting Board: Don't give Meta another polluting gas plant!","sourceName":"Columbus Free Press","publishedAt":"2026-10-04"},{"url":"https://x.com/SaveOhioParks/status/2106910269851181314","title":"Meta gas plant public hearing","sourceName":"X / @SaveOhioParks","publishedAt":"2026-10-05"},{"url":"https://www.storagereview.com/news/meta-prometheus-gigawatt-supercluster-1-million-gpus-gb200-gb300-nvl72","title":"Meta Prometheus: Inside the Gigawatt Supercluster Scaling to 1 Million GPUs on GB200 and GB300 NVL72","sourceName":"StorageReview","publishedAt":"2026-10-19"},{"url":"https://datacenters.atmeta.com/2026/10/new-albany-where-ohios-community-spirit-meets-the-frontier-of-ai/","title":"New Albany: where Ohio's community spirit meets the frontier of AI","sourceName":"Meta Data Centers"}],"reviewNote":null,"createdAt":"2026-08-17T18:11:19.103Z","updatedAt":"2026-10-19T20:57:20.567Z","parties":[{"id":"71f75d85-093b-4cf5-a1c1-6ff75a716e8c","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","companyId":null,"externalName":"AEP Ohio","role":"utility","structureNotes":"Grid interconnection utility.","createdAt":"2026-08-17T18:11:24.664Z","company":null},{"id":"3865a489-99b1-4f69-aad8-6d76f844558e","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","companyId":null,"externalName":"PJM","role":"grid_operator","structureNotes":"AEP Ohio operates within PJM Interconnection.","createdAt":"2026-08-17T18:11:25.422Z","company":null},{"id":"4af536b3-7249-4a32-9e36-9e7986bd116d","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","companyId":null,"externalName":"Williams Companies","role":"construction","structureNotes":"Building the Socrates South behind-the-meter gas facility.","createdAt":"2026-08-17T18:11:26.197Z","company":null},{"id":"638b9f9f-dc63-4aec-94b3-043126dde32e","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","companyId":null,"externalName":"Vistra / Constellation / Oklo / TerraPower","role":"utility","structureNotes":"Nuclear power counterparties (PPAs and future SMR/advanced-reactor deals).","createdAt":"2026-08-17T18:11:26.944Z","company":null},{"id":"c2995093-baa0-4500-bed7-4d03f5feecf3","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","companyId":"303ca7c0-45ce-4503-97e7-d5e0d5adb2bb","externalName":"Meta Platforms","role":"tenant","structureNotes":"Self-tenant; AI supercluster compute.","createdAt":"2026-08-17T18:11:23.915Z","company":{"id":"303ca7c0-45ce-4503-97e7-d5e0d5adb2bb","name":"Meta","slug":"meta"}},{"id":"2da4eca9-45fe-44ff-97f9-93ab7634006d","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","companyId":"303ca7c0-45ce-4503-97e7-d5e0d5adb2bb","externalName":"Meta Platforms","role":"developer","structureNotes":"Owner-operator; New Albany campus.","createdAt":"2026-08-17T18:11:23.146Z","company":{"id":"303ca7c0-45ce-4503-97e7-d5e0d5adb2bb","name":"Meta","slug":"meta"}}],"financialClaims":[{"id":"46905476-9e01-4eeb-bc3f-f3a07d90afbf","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","kind":"capex","label":"Meta New Albany campus investment (to date)","valueUsd":"1500000000","capUsd":null,"conditions":"Cumulative since breaking ground in 2017; understates full Prometheus buildout.","asOf":"2026-05-01T00:00:00.000Z","sourceUrl":"https://measuredai.substack.com/p/meta-prometheus-google-ohio","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-17T18:11:22.376Z"}],"metricClaims":[],"powerProjects":[{"id":"77b9c360-3a61-450a-b5ee-2923cfc65b0c","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","name":"Williams Socrates South (behind-the-meter gas)","type":"gas","capacityGw":0.2,"lifecycleState":"under_construction","sourceUrl":"https://measuredai.substack.com/p/meta-prometheus-google-ohio","evidenceTier":"reported","note":"~307.5 MW nameplate, ~258 MW at design ambient, 200 MW firm; construction began June 2025, targeted before end of 2026.","createdAt":"2026-08-17T18:11:21.161Z"},{"id":"bfd86379-4d79-4a11-a6a6-9f89d1824674","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","name":"Vistra Ohio nuclear PPA","type":"nuclear","capacityGw":2.1,"lifecycleState":"financed","sourceUrl":"https://www.nbc4i.com/news/local-news/new-albany/meta-will-use-nuclear-power-for-its-new-albany-a-i-data-center/","evidenceTier":"reported","note":"Meta to buy >2.1 GW from two Vistra nuclear plants in Ohio plus expansions; also TerraPower, Oklo (Aurora Powerhouse, Pike County) and Constellation agreements.","createdAt":"2026-08-17T18:11:21.535Z"},{"id":"a23d3418-b428-4f12-b4e8-91891cae4dc6","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","name":"Contracted renewables (Ohio solar / Indiana wind)","type":"solar_storage","capacityGw":0.8,"lifecycleState":"financed","sourceUrl":"https://measuredai.substack.com/p/meta-prometheus-google-ohio","evidenceTier":"reported","note":"Over 800 MW of renewable energy contracted.","createdAt":"2026-08-17T18:11:21.918Z"}],"capacityClaims":[{"id":"228dd5de-1edc-4e06-b4ca-be483e4224f0","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","series":"announced","valueGw":1,"asOf":"2026-05-01T00:00:00.000Z","sourceUrl":"https://measuredai.substack.com/p/meta-prometheus-google-ohio","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"~1 GW spanning multiple buildings; described as world's first 1 GW-class data center.","createdAt":"2026-08-17T18:11:19.800Z"},{"id":"a834afe5-e82f-446d-9e0b-f2fa2d7b80ce","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","series":"energized","valueGw":0.5,"asOf":"2026-05-01T00:00:00.000Z","sourceUrl":"https://measuredai.substack.com/p/meta-prometheus-google-ohio","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"More than 500 MW of AI compute reported already installed as of May 2026; full campus targeted to come online by end of 2026.","createdAt":"2026-08-17T18:11:20.627Z"}],"events":[{"id":"0bdc36e9-1c0f-4ad1-b46b-540eb2fdb617","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Vistra / Constellation / Oklo / TerraPower","occurredAt":"2026-08-17T18:11:27.320Z","createdAt":"2026-08-17T18:11:27.320Z"},{"id":"fbb25e22-b561-4d1f-92f0-5234518d0385","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"construction: Williams Companies","occurredAt":"2026-08-17T18:11:26.568Z","createdAt":"2026-08-17T18:11:26.568Z"},{"id":"ff8b8fbb-363c-41ec-861a-b7f9c5ea356b","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"grid_operator: PJM","occurredAt":"2026-08-17T18:11:25.814Z","createdAt":"2026-08-17T18:11:25.814Z"},{"id":"c912848b-592f-47c2-b137-9a3cebf3a05a","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: AEP Ohio","occurredAt":"2026-08-17T18:11:25.039Z","createdAt":"2026-08-17T18:11:25.039Z"},{"id":"ff1734a9-0f0e-4bbc-b700-c0b1a90d97c4","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: Meta Platforms","occurredAt":"2026-08-17T18:11:24.291Z","createdAt":"2026-08-17T18:11:24.291Z"},{"id":"550a3811-448d-41b0-8197-388666b61dff","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Meta Platforms","occurredAt":"2026-08-17T18:11:23.530Z","createdAt":"2026-08-17T18:11:23.530Z"},{"id":"2d252f8e-c93a-4c95-b35e-39aed0d17a74","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Meta New Albany campus investment (to date)","occurredAt":"2026-08-17T18:11:22.760Z","createdAt":"2026-08-17T18:11:22.760Z"},{"id":"74860686-9f32-49eb-b568-3eeee6500907","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0.5","claimId":"a834afe5-e82f-446d-9e0b-f2fa2d7b80ce","detail":null,"occurredAt":"2026-08-17T18:11:20.932Z","createdAt":"2026-08-17T18:11:20.932Z"},{"id":"f87fb1ae-9dea-468e-a51f-e933d4b9708e","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0.5","claimId":"a834afe5-e82f-446d-9e0b-f2fa2d7b80ce","detail":"reported · journalist_report","occurredAt":"2026-08-17T18:11:20.779Z","createdAt":"2026-08-17T18:11:20.779Z"},{"id":"e20266bf-60af-41d7-9c26-99854f50a25b","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"1","claimId":"228dd5de-1edc-4e06-b4ca-be483e4224f0","detail":null,"occurredAt":"2026-08-17T18:11:20.099Z","createdAt":"2026-08-17T18:11:20.099Z"},{"id":"04a21676-ddf5-49b7-93eb-bb6266e680e2","dataCenterId":"d7c13110-4def-4903-9828-a30b405f3afb","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"1","claimId":"228dd5de-1edc-4e06-b4ca-be483e4224f0","detail":"claimed · journalist_report","occurredAt":"2026-08-17T18:11:19.950Z","createdAt":"2026-08-17T18:11:19.950Z"}]},"location":{"name":"New Albany","slug":"new-albany-ohio","kind":"city","lat":40.09,"lng":-82.71},"evidence":[{"id":"9ad30a42-f8f9-4b95-8c6d-f4e3546aa6c3","facilityId":"e78a37e6-9963-4310-bea3-17e1016bf4ca","field":"capex_usd","value":"1500000000","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:20:48.816Z"},{"id":"7fdacac1-fbad-4f00-abae-844b960a8c9f","facilityId":"e78a37e6-9963-4310-bea3-17e1016bf4ca","field":"jobs_construction","value":"1200","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:20:48.816Z"},{"id":"7b2b462a-8870-4308-82c1-483c9519b696","facilityId":"e78a37e6-9963-4310-bea3-17e1016bf4ca","field":"jobs_permanent","value":"300","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:20:48.816Z"},{"id":"510ad870-7751-47ce-bf39-2b45ecd4e9ea","facilityId":"e78a37e6-9963-4310-bea3-17e1016bf4ca","field":"record","value":"Meta New Albany Data Center","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:20:48.816Z"}],"resolved_facts":{"capex_usd":{"id":"9ad30a42-f8f9-4b95-8c6d-f4e3546aa6c3","facilityId":"e78a37e6-9963-4310-bea3-17e1016bf4ca","field":"capex_usd","value":"1500000000","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:20:48.816Z"},"jobs_construction":{"id":"7fdacac1-fbad-4f00-abae-844b960a8c9f","facilityId":"e78a37e6-9963-4310-bea3-17e1016bf4ca","field":"jobs_construction","value":"1200","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:20:48.816Z"},"jobs_permanent":{"id":"7b2b462a-8870-4308-82c1-483c9519b696","facilityId":"e78a37e6-9963-4310-bea3-17e1016bf4ca","field":"jobs_permanent","value":"300","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:20:48.816Z"},"record":{"id":"510ad870-7751-47ce-bf39-2b45ecd4e9ea","facilityId":"e78a37e6-9963-4310-bea3-17e1016bf4ca","field":"record","value":"Meta New Albany Data Center","asOf":null,"sourceUrl":"https://datacenters.atmeta.com/asset/new-albany-data-center-info-sheet/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:20:48.816Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Meta New Albany Data Center","url":"https://registry.deploy.report/datacenters/facilities/meta-ohio-new-albany","address":{"@type":"PostalAddress","addressLocality":"New Albany"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Meta"}]}}