Core Scientific · Muskogee. Every figure below is individually sourced and dated.


Part of the tracked campus Core Scientific / CoreWeave Muskogee HPC Campus.

The story of Muskogee 1inherited from campus Core Scientific / CoreWeave Muskogee HPC Campus
Announced capex
$8.7B
Jobs
150 permanent reported
Grid
SPP · Served by Oklahoma Gas & Electric. Core Scientific announced on 7 May 2026 that it is buying Polaris Technologies for about $421 million in cash, bringing 440 MW of gross power already contracted with OG&E and an on-site substation with it.
Tenant
CoreWeave
Land owner
Port Muskogee
Derived
Cost per MW
$6M/MW
Cost per job
$58M per permanent job

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterMuskogee County(11)·Oklahoma(46)

The deal

Inherited from campus Core Scientific / CoreWeave Muskogee HPC Campus.

developer
Core Scientific · Site developer and operator
land owner
Port Muskogee · Industrial park / port authority partner
chip supplier
NVIDIA · GPUs hosted for CoreWeave
tenant
CoreWeave · HPC hosting lessee for Nvidia GPU compute

Financial structure

Inherited from campus Core Scientific / CoreWeave Muskogee HPC Campus.

CoreWeave HPC hosting contracts with Core Scientific (portfolio, not Muskogee alone)
$8.7B. ~$8.7B potential value over 12-year contracts across six sites; ~590 MW total contracted journalist report
Total capital investment
$4B. Core Scientific IR: 'more than $4 billion in capital investment' company filing

Investment, workforce and specs

Inherited from campus Core Scientific / CoreWeave Muskogee HPC Campus.

Capex
CoreWeave 500 MW hosting contract valued at $8.7B over 12-year terms (each with two 5-year options); Muskogee is one facility within it source
Permanent jobs
150 jobs, average salaries exceeding $65,000 source

Power

Inherited from campus Core Scientific / CoreWeave Muskogee HPC Campus. Live grid demand and drought overlay only render on the campus page.

Power source
grid
Grid operator
SPP
Interconnection
Served by Oklahoma Gas & Electric. Core Scientific announced on 7 May 2026 that it is buying Polaris Technologies for about $421 million in cash, bringing 440 MW of gross power already contracted with OG&E and an on-site substation with it.
Water
Not published. Core Scientific's own page for the site talks about power, connectivity and expansion room, and mentions cooling only as one of the things the facility provides. It names no cooling method, water source or volume.

Facility record

under construction

Status

crypto hpc

Type

Muskogee

Location

100 MW

Critical IT

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • critical it mw: 100 (reported) · source
  • record: Muskogee 1 (reported) · source
  • status: under_construction (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Sep 2026
    Current: under construction

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Muskogee 1?
Muskogee 1 is a data center facility record on the DEPLOY registry, in Muskogee. Every fact on the record is individually sourced and dated.
Who operates Muskogee 1?
Core Scientific operates Muskogee 1, per the sourced record on the DEPLOY registry.
Is Muskogee 1 operating?
Muskogee 1 is recorded as under construction on the DEPLOY registry, with 100 MW of critical IT capacity. Each figure traces to a source.
How verified is the data on Muskogee 1?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Muskogee 1 on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Muskogee 1: data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/corescientific-muskogee-hpc-ok

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces