Data center facility
Core Scientific Port Muskogee HPC Data Center
Core Scientific · Muskogee. Every figure below is individually sourced and dated.
Part of the tracked campus Core Scientific / CoreWeave Muskogee HPC Campus.
- Announced capex
- $8.7B
- Jobs
- 150 permanent reported
- Grid
- SPP · Served by Oklahoma Gas & Electric. Core Scientific announced on 7 May 2026 that it is buying Polaris Technologies for about $421 million in cash, bringing 440 MW of gross power already contracted with OG&E and an on-site substation with it.
- Tenant
- CoreWeave
- Land owner
- Port Muskogee
- Cost per MW
- $6M/MW
- Cost per job
- $58M per permanent job
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterMuskogee County(11)·Oklahoma(46)
The deal
Inherited from campus Core Scientific / CoreWeave Muskogee HPC Campus.
- developer
- Core Scientific · Site developer and operator
- land owner
- Port Muskogee · Industrial park / port authority partner
- chip supplier
- NVIDIA · GPUs hosted for CoreWeave
- tenant
- CoreWeave · HPC hosting lessee for Nvidia GPU compute
Financial structure
Inherited from campus Core Scientific / CoreWeave Muskogee HPC Campus.
- CoreWeave HPC hosting contracts with Core Scientific (portfolio, not Muskogee alone)
- $8.7B. ~$8.7B potential value over 12-year contracts across six sites; ~590 MW total contracted journalist report
- Total capital investment
- $4B. Core Scientific IR: 'more than $4 billion in capital investment' company filing
Investment, workforce and specs
Inherited from campus Core Scientific / CoreWeave Muskogee HPC Campus.
Power
Inherited from campus Core Scientific / CoreWeave Muskogee HPC Campus. Live grid demand and drought overlay only render on the campus page.
- Power source
- grid
- Grid operator
- SPP
- Interconnection
- Served by Oklahoma Gas & Electric. Core Scientific announced on 7 May 2026 that it is buying Polaris Technologies for about $421 million in cash, bringing 440 MW of gross power already contracted with OG&E and an on-site substation with it.
- Water
- Not published. Core Scientific's own page for the site talks about power, connectivity and expansion room, and mentions cooling only as one of the things the facility provides. It names no cooling method, water source or volume.
Facility record
On the data center map
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Sep 2026Current: under construction
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is Core Scientific Port Muskogee HPC Data Center?
Who operates Core Scientific Port Muskogee HPC Data Center?
Is Core Scientific Port Muskogee HPC Data Center operating?
How verified is the data on Core Scientific Port Muskogee HPC Data Center?
Deploy Watch
Track Core Scientific Port Muskogee HPC Data Center on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). Core Scientific Port Muskogee HPC Data Center: data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/core-scientific-port-muskogee-hpc-muskogee-county-ok
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/core-scientific-port-muskogee-hpc-muskogee-county-ok.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/core-scientific-port-muskogee-hpc-muskogee-county-ok
- Data documentation: /data
- Query this programmatically: Deploy MCP