AI data centers on the SPP grid

Every tracked AI data center campus interconnecting to the SPP grid, with combined announced-vs-energized capacity and the grid's live demand. Each figure is individually dated and sourced.


On this grid

Campuses
5
Announced (combined)
13.72 GW
Energized (combined)
0.09 GW
Grid demand now
32.8 GW

The SPP grid is pulling 32.8 GW right now (EIA-930, 2026-09-27 04:00). If every announced campus on this grid energized fully, their combined 13.72 GW would be 41.9% of the grid's current load. Announced numbers are claims, not built capacity; see the methodology.

Campuses on this grid

AI data center campuses on the SPP grid
Fermi America HyperGridAmarillounder construction110
Core Scientific / CoreWeave Muskogee HPC CampusMuskogeeunder construction1.50—
Nebius Independence AI Factory CampusIndependenceunder construction1.20—
Lambda Kansas City AI FactoryKansas Cityunder construction0.02—
Google Pryor (MidAmerica) Data Center CampusPryorpartially energized—0.09