# Delta Forge 2

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** 9296361c-cc72-45d3-af78-92a1b47e790f
- **Type:** AI data center campus
- **Operator / developer:** [Applied Digital](/companies/applied-digital.md)
- **Location:** Ellendale, North Dakota, United States
- **Lifecycle state:** announced

## Parties

- Applied Digital (developer): https://registry.deploy.report/companies/applied-digital

## Common questions


**What is Delta Forge 2?**

Delta Forge 2 is an AI data center campus tracked on the DEPLOY registry, located in Ellendale. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**Who is building Delta Forge 2?**

Applied Digital is recorded as a party to Delta Forge 2 on the DEPLOY registry. The full party list, with each role, is on the record.

**Is Delta Forge 2 operating yet?**

As of the most recent verification on the DEPLOY registry, Delta Forge 2 is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on Delta Forge 2?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- Delta Forge 2 — applied-digital facility: https://www.applieddigital.com/

Canonical: https://registry.deploy.report/datacenters/applied-digital-delta-forge-2
JSON: https://registry.deploy.report/v1/datacenters/applied-digital-delta-forge-2