Khazna QAJ1 Ajman AI-Optimized Data Center

Khazna QAJ1 Ajman AI-Optimized Data Center is an AI data center campus developed by Khazna Data Centers in Ajman, Ajman. 0.10 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Under construction · Khazna Data Centers · Private land · other · Ajman, Ajman, United Arab Emirates


Capacity: announced vs energized

Announced-to-energized gap: 0.10 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Khazna QAJ1 Ajman AI-Optimized Data Center capacity claims
Source
Announced0.10 GW2024-10-01reportedpress release
Under construction0.10 GW2024-10-01verifiedpress release

Key facts

0.10 GW

Announced

0 GW

Energized

other

Grid

0.10 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on Khazna QAJ1 Ajman AI-Optimized Data Center. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.
The story of Khazna QAJ1 Ajman AI-Optimized Data Center
Cooling
liquid cooling (first certified liquid-cooled AI data center in MENA)
Tenant
Microsoft

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterAjman(3)

The deal

developer
Khazna Data Centers · G42 Group subsidiary
operator
Khazna Data Centers
tenant
Microsoft · Anchor tenant; first 30MW AI deployment phase
utility
Etihad Water and Electricity Company (EtihadWE) · Power supply
construction
Laing O'Rourke · Main contractor

Power

Power source
grid
Grid operator
other
Interconnection

Silicon on site

Every AI chip publicly attributed to Khazna QAJ1 Ajman AI-Optimized Data Center on the DEPLOY registry. Quantity hints are unstructured because underlying disclosures vary by an order of magnitude. Source links per row.

  1. H200/GB200-generation capacity for G42 / UAE AI stack

    inferredG42 has committed multi-billion NVIDIA compute; per-campus attribution not published.

    Khazna

Why here

Khazna QAJ1 Ajman AI-Optimized Data Center sits on private land in Ajman, Ajman. It connects to the other grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

UAE unmanned-aircraft (drone) framework (GCAA CAR-UAS)other · 2022-01-01 · United Arab Emirates

Investment, workforce and specs

Cooling
Liquid cooling (first certified AI data center with liquid cooling in MENA); Tier III design source

Timeline

  1. Aug 2026
    capacity changed
    under_construction: unknown to 0.1
  2. Sep 2026
    Current: Under construction

Sources

aca9b61a-c103-4846-824b-97b2eebbb858 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Khazna QAJ1 Ajman AI-Optimized Data Center?
Khazna QAJ1 Ajman AI-Optimized Data Center is an AI data center campus tracked on the DEPLOY registry, located in Ajman. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Khazna QAJ1 Ajman AI-Optimized Data Center use?
Khazna QAJ1 Ajman AI-Optimized Data Center has 0.10 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building Khazna QAJ1 Ajman AI-Optimized Data Center?
Khazna Data Centers is recorded as a party to Khazna QAJ1 Ajman AI-Optimized Data Center on the DEPLOY registry. The full party list, with each role, is on the record.
Is Khazna QAJ1 Ajman AI-Optimized Data Center operating yet?
As of the most recent verification on the DEPLOY registry, Khazna QAJ1 Ajman AI-Optimized Data Center is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Khazna QAJ1 Ajman AI-Optimized Data Center?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Khazna QAJ1 Ajman AI-Optimized Data Center on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Khazna QAJ1 Ajman AI-Optimized Data Center: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/khazna-qaj1-ajman-ai-data-center