Data center campus
Khazna AUH6 Abu Dhabi
Khazna AUH6 Abu Dhabi is a tracked AI data center campus in Abu Dhabi, UAE. Named on Khazna's own site as an existing Abu Dhabi facility that has been retrofitted for GPU / AI workloads. Part of Khazna's 30-live-site UAE footprint (portfolio total ~673 MW across 30 live plus 6 ongoing projects,
Energized · Khazna Data Centers · Abu Dhabi, UAE, United Arab Emirates
Capacity: announced vs energized
| Source |
|---|
Key facts
Reported facts
Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.
- Launch (company-claimed, Feb 2024)
- AUH6 in Masdar City; 31.8 MW IT
- Design (company-claimed)
- Modular, repeatable build; facade reduces sun heat gain
- Solar (company-claimed)
- 7 MWp ground-mounted solar with Emerge
On the data center map
Every tracked data center is on this map, centered on Khazna AUH6 Abu Dhabi. Pan or zoom out to see how close rivals are building.
The deal
- developer
- Khazna Data Centers
Power
- Power source
- grid
- Interconnection
Why here
Khazna AUH6 Abu Dhabi is in Abu Dhabi, UAE. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Sources
- Khazna AUH6 Abu Dhabi — khazna-data-centers facility
- Khazna Data Centers Fuels UAE's Digital Future with the Launch of Hyperscale AI-ready Data Center in Masdar City
88bb1777-4fa0-4c53-9545-dfb2c13e5fc3 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Khazna AUH6 Abu Dhabi?
Who is building Khazna AUH6 Abu Dhabi?
Is Khazna AUH6 Abu Dhabi operating yet?
How verified is the data on Khazna AUH6 Abu Dhabi?
Deploy Watch
Track Khazna AUH6 Abu Dhabi on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Khazna AUH6 Abu Dhabi: AI data center campus record. Retrieved November 11, 2026, from https://registry.deploy.report/datacenters/khazna-data-centers-khazna-auh6-abu-dhabi
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/khazna-data-centers-khazna-auh6-abu-dhabi.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/khazna-data-centers-khazna-auh6-abu-dhabi
- Data documentation: /data
- Query this programmatically: Deploy MCP