DEPLOYDatabase

Data center campus

Stargate UAE Abu Dhabi Campus

Stargate UAE Abu Dhabi Campus is a tracked AI data center campus in Abu Dhabi, UAE. Joint G42/OpenAI/Oracle/SoftBank/NVIDIA/Cisco cluster; announced May 2025

Under construction · G42 · Abu Dhabi, UAE, United Arab Emirates


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Stargate UAE Abu Dhabi Campus capacity claims
Source

Key facts

0 GW

Energized

G42

Developer

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity (company-claimed)
1 GW phase 1 committed; 5 GW at full build; initial operations 2026
Named tenants
OpenAI, Oracle, NVIDIA, SoftBank, Cisco

On the data center map

Every tracked data center is on this map, centered on Stargate UAE Abu Dhabi Campus. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

The deal

developer
G42

Power

Power source
mixed
Interconnection

Why here

Stargate UAE Abu Dhabi Campus is in Abu Dhabi, UAE. It draws on mixed power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

Abu Dhabi autonomous-vehicle permit regimeother · 2025-11-13 · Abu Dhabi, UAE
UAE unmanned-aircraft (drone) framework (GCAA CAR-UAS)other · 2022-01-01 · United Arab Emirates

Sources

0a27cbbc-3a01-4d6e-a664-7e92e9efe2b6 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Stargate UAE Abu Dhabi Campus?
Stargate UAE Abu Dhabi Campus is an AI data center campus tracked on the DEPLOY registry, located in Abu Dhabi, UAE. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Stargate UAE Abu Dhabi Campus?
G42 is recorded as a party to Stargate UAE Abu Dhabi Campus on the DEPLOY registry. The full party list, with each role, is on the record.
Is Stargate UAE Abu Dhabi Campus operating yet?
As of the most recent verification on the DEPLOY registry, Stargate UAE Abu Dhabi Campus is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Stargate UAE Abu Dhabi Campus?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Stargate UAE Abu Dhabi Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Stargate UAE Abu Dhabi Campus: AI data center campus record. Retrieved November 11, 2026, from https://registry.deploy.report/datacenters/g42-stargate-uae-abu-dhabi-campus

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces