DEPLOY

Data center campus

Khazna Ajman AJM1

Khazna Ajman AJM1 is a tracked AI data center campus in Ajman, Ajman.

Announced · G42 · Ajman, Ajman, United Arab Emirates


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Khazna Ajman AJM1 capacity claims
Source

Key facts

announced

Lifecycle

0 GW

Energized

G42

Developer

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
100 MW (100 MW announced October 2024 for AI workloads)

On the data center map

Every tracked data center is on this map, centered on Khazna Ajman AJM1. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.

In clusterAjman(3)

The deal

developer
G42

Power

Power source
grid
Interconnection

Why here

Khazna Ajman AJM1 is in Ajman, Ajman. It draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

UAE unmanned-aircraft (drone) framework (GCAA CAR-UAS)other · 2022-01-01 · United Arab Emirates

Sources

c21432ba-b7c9-43ed-80d6-dae7c078dbf9 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Khazna Ajman AJM1?
Khazna Ajman AJM1 is an AI data center campus tracked on the DEPLOY registry, located in Ajman. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Khazna Ajman AJM1?
G42 is recorded as a party to Khazna Ajman AJM1 on the DEPLOY registry. The full party list, with each role, is on the record.
Is Khazna Ajman AJM1 operating yet?
As of the most recent verification on the DEPLOY registry, Khazna Ajman AJM1 is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Khazna Ajman AJM1?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Khazna Ajman AJM1 on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Khazna Ajman AJM1: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/g42-khazna-ajman-ajm1

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces