DEPLOY

Data center campus

Microsoft-G42 Kenya Geothermal Datacenter

Microsoft-G42 Kenya Geothermal Datacenter is a tracked AI data center campus in Olkaria. Geothermal-powered; part of Microsoft's $1B commitment tied to G42 investment

Announced · G42 · Olkaria, Kenya


Capacity: announced vs energized

Announced
not recorded
Contracted
not recorded
Under construction
not recorded
Energized
not recorded
Microsoft-G42 Kenya Geothermal Datacenter capacity claims
Source

Key facts

announced

Lifecycle

0 GW

Energized

G42

Developer

Kenya

Location

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

IT capacity
1000 MW (1 GW geothermal-powered campus announced May 2024 with Microsoft and EcoCloud)
Named tenants
Microsoft

On the data center map

No mappable coordinate is recorded for Microsoft-G42 Kenya Geothermal Datacenter yet. Location: Olkaria.

The deal

developer
G42

Power

Power source
other
Interconnection

Why here

Microsoft-G42 Kenya Geothermal Datacenter is in Olkaria. It draws on other power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Sources

8d77fcf6-5b29-4303-b7ee-e288bc264daf · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Microsoft-G42 Kenya Geothermal Datacenter?
Microsoft-G42 Kenya Geothermal Datacenter is an AI data center campus tracked on the DEPLOY registry, located in Olkaria. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Microsoft-G42 Kenya Geothermal Datacenter?
G42 is recorded as a party to Microsoft-G42 Kenya Geothermal Datacenter on the DEPLOY registry. The full party list, with each role, is on the record.
Is Microsoft-G42 Kenya Geothermal Datacenter operating yet?
As of the most recent verification on the DEPLOY registry, Microsoft-G42 Kenya Geothermal Datacenter is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Microsoft-G42 Kenya Geothermal Datacenter?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Microsoft-G42 Kenya Geothermal Datacenter on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Microsoft-G42 Kenya Geothermal Datacenter: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/microsoft-g42-kenya-geothermal-datacenter

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces