Data center facility
xAI Southaven Data Center (MACROHARD)
xAI · Southaven. Every figure below is individually sourced and dated.
Part of the tracked campus xAI Colossus 2 Data Center.
- Announced capex
- $80M
- Cost per MW
- $67K/MW
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterMississippi(27)
The deal
Inherited from campus xAI Colossus 2 Data Center.
Financial structure
Inherited from campus xAI Colossus 2 Data Center.
- Reported multi-billion investment (largest private-sector in state history)
- Aggregate figures vary across reports journalist report
- Planned wastewater treatment plant (Colossus 2)
- $80M press
Investment, workforce and specs
Inherited from campus xAI Colossus 2 Data Center.
- GPUs
- Targeting on the order of 1 million Nvidia Blackwell GPUs; several hundred thousand deployed by mid-2026 source
Power
Inherited from campus xAI Colossus 2 Data Center. Live grid demand and drought overlay only render on the campus page.
- Power source
- behind the meter gas
- Interconnection
- Water
- Sits too far from the wastewater plant and draws millions of gallons/day of drinking water (about 1.3M gal/day as of early 2026); xAI has announced an ~$80M treatment plant to reuse ~13M gal/day of wastewater. Powered by on-site natural gas turbines.
Colossus 2 on-site gas turbine fleet, 0.49 GW gas, Partially energized. ~46 turbines (~495 MW) reported operating; 41 additional turbines permitted March 2026
Facility record
On the data center map
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Sep 2026Current: announced
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is xAI Southaven Data Center (MACROHARD)?
Who operates xAI Southaven Data Center (MACROHARD)?
Is xAI Southaven Data Center (MACROHARD) operating?
How verified is the data on xAI Southaven Data Center (MACROHARD)?
Deploy Watch
Track xAI Southaven Data Center (MACROHARD) on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). xAI Southaven Data Center (MACROHARD): data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/xai-southaven-macrohard-desoto-ms
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/xai-southaven-macrohard-desoto-ms.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/xai-southaven-macrohard-desoto-ms
- Data documentation: /data
- Query this programmatically: Deploy MCP