Oracle · Santa Teresa. Every figure below is individually sourced and dated.


Part of the tracked campus Stargate Doña Ana County / Project Jupiter (New Mexico).

The story of Oracle Dona Ana County AI Data Centerinherited from campus Stargate Doña Ana County / Project Jupiter (New Mexico)
Jobs
750 permanent reported
Water
20K gal/day (77 households)
Cooling
Closed-loop cooling system
Tenant
OpenAI

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterNew Mexico(28)

The deal

Inherited from campus Stargate Doña Ana County / Project Jupiter (New Mexico).

developer
STACK Infrastructure · Developer/builder of Project Jupiter (four buildings).
tenant
OpenAI · Anchor tenant / Stargate program lead.
developer
Oracle · Oracle-led site under the Stargate expansion; contracts compute to OpenAI.
chip supplier
NVIDIA · GPU supplier across the Stargate program.
developer
BorderPlex Digital Assets · Austin-based co-developer of Project Jupiter alongside STACK Infrastructure.
utility
El Paso Electric · Regional utility serving the Santa Teresa / Doña Ana County area (WECC).

Financial structure

Inherited from campus Stargate Doña Ana County / Project Jupiter (New Mexico).

Industrial revenue bond approved
up to $165B. Up to $165 billion industrial revenue bond approved by Doña Ana County commissioners to finance the campus. journalist report

Investment, workforce and specs

Inherited from campus Stargate Doña Ana County / Project Jupiter (New Mexico).

Cooling
Closed-loop cooling system source
Construction jobs
~2,500 construction jobs over a decade source
Permanent jobs
~750 permanent positions (salaries ~$75k-$100k) source
Water (gal/day)
~20,000 gallons/day proposed domestic water use source

Power

Inherited from campus Stargate Doña Ana County / Project Jupiter (New Mexico). Live grid demand and drought overlay only render on the campus page.

Power source
behind the meter gas
Grid operator
WECC
Interconnection
Water
Closed-loop cooling; proposed domestic water use ~20,000 gallons/day; on-site microgrid targeting net-zero emissions by 2045.

Project Jupiter on-site natural gas microgrids, gas, Under construction. Two natural gas microgrids to power the campus behind the meter; individual capacity not disclosed (0.0 = unknown, not zero).

On-site natural gas turbine microgrid, gas, Announced. Natural gas turbine system with microgrid designed to meet net-zero emission targets by 2045.

Facility record

under construction

Status

hyperscale

Type

Oracle

Operator

Santa Teresa

Location

On the data center map

Free to use on your site, with a link back to DEPLOY.

Evidence

Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.

  • cooling type: closed-loop non-evaporative liquid cooling (reported) · source
  • jobs construction: 7000 (reported) · source
  • jobs permanent: 1500 (reported) · source
  • record: Oracle Dona Ana County AI Data Center (reported) · source

Timeline

  1. Aug 2026
    First recorded
    Added to the DEPLOY registry as a sourced facility record
  2. Sep 2026
    Current: under construction

Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.

Common questions

What is Oracle Dona Ana County AI Data Center?
Oracle Dona Ana County AI Data Center is a data center facility record on the DEPLOY registry, in Santa Teresa. Every fact on the record is individually sourced and dated.
Who operates Oracle Dona Ana County AI Data Center?
Oracle operates Oracle Dona Ana County AI Data Center, per the sourced record on the DEPLOY registry.
Is Oracle Dona Ana County AI Data Center operating?
Oracle Dona Ana County AI Data Center is recorded as under construction on the DEPLOY registry. Each figure traces to a source.
How verified is the data on Oracle Dona Ana County AI Data Center?
A human editor has reviewed this record for the indexed registry. Every rendered fact shows its source: this is what a verified record looks like next to an unsourced directory listing.

Deploy Watch

Track Oracle Dona Ana County AI Data Center on Deploy.

We notify you when operating status, capacity, or the operator changes against a sourced record.

Cite this page

DEPLOY. (2026). Oracle Dona Ana County AI Data Center: data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/oracle-dona-ana-county-new-mexico

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces