Data center facility
Oracle Dona Ana County AI Data Center
Oracle · Santa Teresa. Every figure below is individually sourced and dated.
Part of the tracked campus Stargate Doña Ana County / Project Jupiter (New Mexico).
- Jobs
- 750 permanent reported
- Water
- 20K gal/day (77 households)
- Cooling
- Closed-loop cooling system
- Tenant
- OpenAI
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterNew Mexico(28)
The deal
Inherited from campus Stargate Doña Ana County / Project Jupiter (New Mexico).
- developer
- STACK Infrastructure · Developer/builder of Project Jupiter (four buildings).
- tenant
- OpenAI · Anchor tenant / Stargate program lead.
- developer
- Oracle · Oracle-led site under the Stargate expansion; contracts compute to OpenAI.
- chip supplier
- NVIDIA · GPU supplier across the Stargate program.
- developer
- BorderPlex Digital Assets · Austin-based co-developer of Project Jupiter alongside STACK Infrastructure.
- utility
- El Paso Electric · Regional utility serving the Santa Teresa / Doña Ana County area (WECC).
- developer
- Stargate Infrastructure
Financial structure
Inherited from campus Stargate Doña Ana County / Project Jupiter (New Mexico).
- Industrial revenue bond approved
- up to $165B. Up to $165 billion industrial revenue bond approved by Doña Ana County commissioners to finance the campus. journalist report
Investment, workforce and specs
Inherited from campus Stargate Doña Ana County / Project Jupiter (New Mexico).
Power
Inherited from campus Stargate Doña Ana County / Project Jupiter (New Mexico). Live grid demand and drought overlay only render on the campus page.
- Power source
- behind the meter gas
- Grid operator
- WECC
- Interconnection
- Water
- Closed-loop cooling; proposed domestic water use ~20,000 gallons/day; on-site microgrid targeting net-zero emissions by 2045.
Project Jupiter on-site natural gas microgrids, gas, Under construction. Two natural gas microgrids to power the campus behind the meter; individual capacity not disclosed (0.0 = unknown, not zero).
On-site natural gas turbine microgrid, gas, Announced. Natural gas turbine system with microgrid designed to meet net-zero emission targets by 2045.
Facility record
On the data center map
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Sep 2026Current: under construction
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is Oracle Dona Ana County AI Data Center?
Who operates Oracle Dona Ana County AI Data Center?
Is Oracle Dona Ana County AI Data Center operating?
How verified is the data on Oracle Dona Ana County AI Data Center?
Deploy Watch
Track Oracle Dona Ana County AI Data Center on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). Oracle Dona Ana County AI Data Center: data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/oracle-dona-ana-county-new-mexico
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/oracle-dona-ana-county-new-mexico.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/oracle-dona-ana-county-new-mexico
- Data documentation: /data
- Query this programmatically: Deploy MCP