{"id":"6c38c4e4-5a86-4cf1-a3aa-97c1ea7c679c","slug":"oracle-dona-ana-county-new-mexico","name":"Oracle Dona Ana County AI Data Center","aliases":[],"operatorCompanyId":"a18eca31-e45d-4693-9cd1-7d306be303fb","parentCampusId":"4c5d91e2-9598-4b3c-9128-702828bf4251","lat":null,"lng":null,"streetAddress":null,"locationId":"426e17fd-34c9-4de4-a2c4-c6a9d933fc9b","status":"under_construction","facilityType":"hyperscale","criticalItMw":null,"buildingSqft":null,"yearOperational":null,"yearAnnounced":null,"servingUtility":null,"wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"city","reviewStatus":"reviewed","sources":[{"url":"https://www.oracle.com/data-centers/dona-ana-county/"}],"notes":null,"createdAt":"2026-08-18T03:23:06.216Z","updatedAt":"2026-08-28T04:02:34.889Z","operator":{"name":"Oracle","slug":"oracle"},"parentCampus":{"id":"4c5d91e2-9598-4b3c-9128-702828bf4251","slug":"stargate-dona-ana-county-new-mexico","name":"Stargate Doña Ana County / Project Jupiter (New Mexico)","aliases":[],"locationId":"426e17fd-34c9-4de4-a2c4-c6a9d933fc9b","lat":31.9,"lng":-106.65,"locationPrecision":"city","landStatus":"private","lifecycleState":"under_construction","powerSourceMix":"behind_the_meter_gas","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"WECC","waterSourceNotes":"Closed-loop cooling; proposed domestic water use ~20,000 gallons/day; on-site microgrid targeting net-zero emissions by 2045.","servingUtility":null,"acreage":1400,"totalBuildingSqft":null,"streetAddress":null,"notes":"An Oracle-led Stargate site in Doña Ana County, New Mexico, developed by STACK Infrastructure under the name Project Jupiter (four large buildings). Epoch AI's April 2026 tracker reports foundation work underway with satellite imagery, a planned ~2.2 GW, and power from two on-site natural gas microgrids designed to limit local-grid impact. The site sits in the WECC region (not ERCOT/PJM/MISO/SPP). No energized capacity reported yet.","keyFacts":[{"label":"Also known as","value":"Project Jupiter"},{"label":"Location","value":"Doña Ana County, New Mexico (Santa Teresa area)"},{"label":"Developer","value":"STACK Infrastructure (Oracle-led)"},{"label":"Lifecycle (reported)","value":"Under construction; foundation work seen in satellite imagery"},{"label":"Planned capacity (reported)","value":"About 2.2 GW; part of about 5.5 GW across three Oracle-led sites"},{"label":"Cooling","value":"Closed-loop; about 20,000 gal/day domestic water proposed"},{"label":"On-site power","value":"Two natural-gas microgrids; net-zero target by 2045"},{"label":"First GW target","value":"H2 2026; initial operations Q4 2026"},{"label":"Incentive","value":"Industrial revenue bond approved"},{"label":"Utility","value":"El Paso Electric"},{"label":"Force majeure (reported, Sep 2026)","value":"Oracle sent a force majeure notice on payment timing; Oracle says schedule unchanged."},{"label":"Delay (reported, Sep 2026)","value":"About one-year delay reported; Blue Owl holds about $3B of equity"},{"label":"Open issues (reported, Oct 2026)","value":"Gas supply, air permit and land access unresolved; pipeline in service Feb 1 2027."},{"label":"Renewable energy RFP (company-stated, Sep 2026)","value":"Oracle seeks proposals for 2 GW of new New Mexico solar, wind and geothermal deliverable 2027 to 2031, toward 100% carbon-free energy matching for the campus by 2031."}],"reviewStatus":"reviewed","sources":[{"url":"https://openai.com/index/five-new-stargate-sites/","title":"OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites","sourceName":"OpenAI"},{"url":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand","title":"OpenAI Stargate: where the US sites stand","sourceName":"Epoch AI"},{"url":"https://www.reuters.com/business/oracle-cites-force-majeure-shield-itself-controversial-data-center-bloomberg-2026-09-24/","title":"Oracle cites 'force majeure' to shield itself on data center, Bloomberg News reports","sourceName":"Reuters","publishedAt":"2026-09-24"},{"url":"https://www.cnbc.com/2026/09/24/oracle-data-center-force-majeure.html","title":"Oracle shares drop on report it sent 'force majeure' notice about data center project","sourceName":"CNBC","publishedAt":"2026-09-24"},{"url":"https://techcrunch.com/2026/09/24/oracle-sends-force-majeure-notice-on-its-new-mexico-stargate-data-center/","title":"Oracle sends force majeure notice on its New Mexico Stargate data center","sourceName":"TechCrunch","publishedAt":"2026-09-24"},{"url":"https://www.reuters.com/business/energy/oracle-blue-owl-project-delay-sends-ripples-through-ai-financing-sources-say-2026-09-24/","title":"Oracle, Blue Owl project delay sends ripples through AI financing, sources say","sourceName":"Reuters","publishedAt":"2026-09-24"},{"url":"https://www.abqjournal.com/business/oracle-invokes-force-majeure-on-project-jupiter-but-says-data-center-still-on-track/3127907","title":"Oracle invokes force majeure on Project Jupiter, but says data center still on track","sourceName":"Albuquerque Journal","publishedAt":"2026-09-24"},{"url":"https://qz.com/oracle-force-majeure-new-mexico-ai-data-center-092426","title":"Oracle invokes force majeure on New Mexico AI data center","sourceName":"Quartz","publishedAt":"2026-10-03"},{"url":"https://www.theregister.com/on-prem/2026/10/02/power-approval-set-to-delay-oracles-wisconsin-ai-datacenter/5300832","title":"Power approval set to delay Oracle's Wisconsin AI datacenter","sourceName":"The Register","publishedAt":"2026-10-02"},{"url":"https://www.enr.com/articles/63720-oracle-invokes-force-majeure-as-new-mexico-project-jupiter-power-work-faces-hurdles","title":"Oracle Invokes Force Majeure as New Mexico Project Jupiter Power Work Faces Hurdles","sourceName":"Engineering News-Record","publishedAt":"2026-09-25"},{"url":"https://stocktwits.com/news-articles/markets/equity/ai-data-center-delays-new-questions-orcl-be-apld/cZDFMNFRB1s","title":"AI Data Center Delays Raise New Questions For ORCL, BE And APLD, Says IO Fund","sourceName":"Stocktwits","publishedAt":"2026-10-04"},{"url":"https://x.com/venaodiver/status/2107219174644957418","title":"X post on Project Jupiter delays","sourceName":"X/@venaodiver","publishedAt":"2026-10-05"},{"url":"https://www.oracle.com/news/announcement/oracle-issues-rfp-for-2gw-of-renewable-energy-2026-09-08/","title":"Oracle Issues RFP for 2 GW of Renewable Energy in New Mexico","sourceName":"Oracle","publishedAt":"2026-09-08"}],"reviewNote":null,"createdAt":"2026-08-17T18:13:26.103Z","updatedAt":"2026-10-20T21:01:38.280Z","parties":[{"id":"f55ac6e4-b09a-4c92-bc11-b6f798fe33b3","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","companyId":null,"externalName":"STACK Infrastructure","role":"developer","structureNotes":"Developer/builder of Project Jupiter (four buildings).","createdAt":"2026-08-17T18:13:28.498Z","company":null},{"id":"57edcebb-ad90-4ebc-99aa-43c5f171a765","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","companyId":"bd3c5b86-a4cf-4655-842d-e32895c87e6b","externalName":"OpenAI","role":"tenant","structureNotes":"Anchor tenant / Stargate program lead.","createdAt":"2026-08-17T18:13:27.729Z","company":{"id":"bd3c5b86-a4cf-4655-842d-e32895c87e6b","name":"OpenAI","slug":"openai"}},{"id":"ec858b3d-226a-4d97-bddb-044beb072c1d","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","companyId":"a18eca31-e45d-4693-9cd1-7d306be303fb","externalName":"Oracle","role":"developer","structureNotes":"Oracle-led site under the Stargate expansion; contracts compute to OpenAI.","createdAt":"2026-08-17T18:13:29.258Z","company":{"id":"a18eca31-e45d-4693-9cd1-7d306be303fb","name":"Oracle","slug":"oracle"}},{"id":"fb6fe8d2-de15-4bb8-9455-ab03ce415a79","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","companyId":"a9609061-00fd-4d9b-9b2d-ce2d772ab825","externalName":"Nvidia","role":"chip_supplier","structureNotes":"GPU supplier across the Stargate program.","createdAt":"2026-08-17T18:13:30.008Z","company":{"id":"a9609061-00fd-4d9b-9b2d-ce2d772ab825","name":"NVIDIA","slug":"nvidia"}},{"id":"d11d1989-2508-4136-94ff-6d67c2a7d0f3","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","companyId":null,"externalName":"BorderPlex Digital Assets","role":"developer","structureNotes":"Austin-based co-developer of Project Jupiter alongside STACK Infrastructure.","createdAt":"2026-08-19T00:28:26.174Z","company":null},{"id":"f936e89e-4d07-41e6-8acf-036c68bc724d","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","companyId":null,"externalName":"El Paso Electric","role":"utility","structureNotes":"Regional utility serving the Santa Teresa / Doña Ana County area (WECC).","createdAt":"2026-08-19T00:28:27.302Z","company":null},{"id":"ef118d4d-4757-4880-b707-9bb3205f44da","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","companyId":"d6ac4d62-36f9-4800-8d56-5e82c51594d5","externalName":null,"role":"developer","structureNotes":null,"createdAt":"2026-08-27T22:22:46.378Z","company":{"id":"d6ac4d62-36f9-4800-8d56-5e82c51594d5","name":"Stargate Infrastructure","slug":"stargate-infrastructure"}}],"financialClaims":[{"id":"55ab2e00-5e4d-460c-bdb8-bc5901556490","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","kind":"incentive","label":"Industrial revenue bond approved","valueUsd":null,"capUsd":"165000000000","conditions":"Up to $165 billion industrial revenue bond approved by Doña Ana County commissioners to finance the campus.","asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.abqjournal.com/business/doa-ana-countys-project-jupiter-joins-500-billion-stargate-initiative-led-by-openai-oracle/493927","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:28:23.011Z"}],"metricClaims":[{"id":"d5c2b714-ea48-41a0-96e7-cd781a10e2ea","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","metricType":"cooling_type","valueNumeric":null,"valueText":"Closed-loop cooling system","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.abqjournal.com/business/doa-ana-countys-project-jupiter-joins-500-billion-stargate-initiative-led-by-openai-oracle/493927","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:28:25.328Z"},{"id":"9b396c59-bf16-4a81-9a59-1c19eeba7a9a","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","metricType":"jobs_construction","valueNumeric":2500,"valueText":"~2,500 construction jobs over a decade","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.abqjournal.com/business/doa-ana-countys-project-jupiter-joins-500-billion-stargate-initiative-led-by-openai-oracle/493927","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:28:24.150Z"},{"id":"0fb63f27-fb6f-484b-8cd5-425a995ebe78","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","metricType":"jobs_permanent","valueNumeric":750,"valueText":"~750 permanent positions (salaries ~$75k-$100k)","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.abqjournal.com/business/doa-ana-countys-project-jupiter-joins-500-billion-stargate-initiative-led-by-openai-oracle/493927","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:28:24.573Z"},{"id":"29757313-e719-4a43-89d0-08608d32432d","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","metricType":"water_gpd","valueNumeric":20000,"valueText":"~20,000 gallons/day proposed domestic water use","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://www.abqjournal.com/business/doa-ana-countys-project-jupiter-joins-500-billion-stargate-initiative-led-by-openai-oracle/493927","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:28:24.950Z"}],"powerProjects":[{"id":"2aa1843d-7c65-401d-931c-1a3a73b8eadd","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","name":"Project Jupiter on-site natural gas microgrids","type":"gas","capacityGw":null,"lifecycleState":"under_construction","sourceUrl":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand","evidenceTier":"reported","note":"Two natural gas microgrids to power the campus behind the meter; individual capacity not disclosed (0.0 = unknown, not zero).","createdAt":"2026-08-17T18:13:27.346Z"},{"id":"31e916a7-5db5-436e-848f-361fff595f38","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","name":"On-site natural gas turbine microgrid","type":"gas","capacityGw":null,"lifecycleState":"announced","sourceUrl":"https://www.abqjournal.com/business/doa-ana-countys-project-jupiter-joins-500-billion-stargate-initiative-led-by-openai-oracle/493927","evidenceTier":"reported","note":"Natural gas turbine system with microgrid designed to meet net-zero emission targets by 2045.","createdAt":"2026-08-19T00:28:23.773Z"}],"capacityClaims":[{"id":"afe50ea4-5ba6-4aaa-b4f6-e35ef8648845","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","series":"announced","valueGw":2.2,"asOf":"2026-04-17T00:00:00.000Z","sourceUrl":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand","sourceType":"journalist_report","evidenceTier":"claimed","supersedesId":null,"note":"Epoch AI planned-capacity estimate for Project Jupiter; part of the ~5.5 GW OpenAI attributed to the three Oracle-led sites.","createdAt":"2026-08-17T18:13:26.792Z"},{"id":"31529050-fa17-4d1b-a0ef-7220958a80b7","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","series":"energized","valueGw":0,"asOf":"2026-07-01T00:00:00.000Z","sourceUrl":"https://epoch.ai/publications/openai-stargate-where-the-us-sites-stand","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":"Epoch AI site tracker shows Project Jupiter (Santa Teresa) at 0 GW as of mid-2026 with foundation work underway. First GW targeted H2 2026, initial operations Q4 2026; nothing energized yet.","createdAt":"2026-08-17T18:33:40.755Z"}],"events":[{"id":"038c07b3-0292-4d90-a6d9-6d66e22a30ba","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: El Paso Electric","occurredAt":"2026-08-19T00:28:27.743Z","createdAt":"2026-08-19T00:28:27.743Z"},{"id":"e807dfbe-48d6-4954-95be-fb4f9f50202f","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: BorderPlex Digital Assets","occurredAt":"2026-08-19T00:28:26.551Z","createdAt":"2026-08-19T00:28:26.551Z"},{"id":"990ba384-cdf2-4d93-9a73-ed86eba5cb4e","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"incentive: Industrial revenue bond approved","occurredAt":"2026-08-19T00:28:23.386Z","createdAt":"2026-08-19T00:28:23.386Z"},{"id":"267633f0-4272-4458-92cd-bfb54d8a3a93","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","eventType":"capacity_changed","series":"energized","oldValue":null,"newValue":"0","claimId":"31529050-fa17-4d1b-a0ef-7220958a80b7","detail":null,"occurredAt":"2026-08-17T18:33:41.060Z","createdAt":"2026-08-17T18:33:41.060Z"},{"id":"09b43fea-1fa5-4a6d-94ec-4577d78c388e","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","eventType":"claim_recorded","series":"energized","oldValue":null,"newValue":"0","claimId":"31529050-fa17-4d1b-a0ef-7220958a80b7","detail":"reported · journalist_report","occurredAt":"2026-08-17T18:33:40.905Z","createdAt":"2026-08-17T18:33:40.905Z"},{"id":"306d1b8a-95d1-4f97-9120-c79074eb1be3","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"chip_supplier: Nvidia","occurredAt":"2026-08-17T18:13:30.391Z","createdAt":"2026-08-17T18:13:30.391Z"},{"id":"5068b9b6-fbc8-4072-aa84-367a47bce8b8","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: Oracle","occurredAt":"2026-08-17T18:13:29.635Z","createdAt":"2026-08-17T18:13:29.635Z"},{"id":"f21653f2-9fd7-4246-a878-49195069876e","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: STACK Infrastructure","occurredAt":"2026-08-17T18:13:28.884Z","createdAt":"2026-08-17T18:13:28.884Z"},{"id":"3ba05252-79e1-46a7-89c0-2e3ad9e93fff","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tenant: OpenAI","occurredAt":"2026-08-17T18:13:28.116Z","createdAt":"2026-08-17T18:13:28.116Z"},{"id":"37454f11-7ec2-405f-a635-5448a2d8610c","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"2.2","claimId":"afe50ea4-5ba6-4aaa-b4f6-e35ef8648845","detail":null,"occurredAt":"2026-08-17T18:13:27.116Z","createdAt":"2026-08-17T18:13:27.116Z"},{"id":"78b067ca-d496-4ebb-8718-984e74e186df","dataCenterId":"4c5d91e2-9598-4b3c-9128-702828bf4251","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"2.2","claimId":"afe50ea4-5ba6-4aaa-b4f6-e35ef8648845","detail":"claimed · journalist_report","occurredAt":"2026-08-17T18:13:26.963Z","createdAt":"2026-08-17T18:13:26.963Z"}]},"location":{"name":"Santa Teresa","slug":"santa-teresa-new-mexico","kind":"city","lat":31.9,"lng":-106.65},"evidence":[{"id":"728838cd-3dd1-49f7-a354-ffa1e797473a","facilityId":"6c38c4e4-5a86-4cf1-a3aa-97c1ea7c679c","field":"cooling_type","value":"closed-loop non-evaporative liquid cooling","asOf":null,"sourceUrl":"https://www.oracle.com/data-centers/dona-ana-county/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:23:06.600Z"},{"id":"c3b4bb2e-534a-410b-b3c0-7ffd9c888341","facilityId":"6c38c4e4-5a86-4cf1-a3aa-97c1ea7c679c","field":"jobs_construction","value":"7000","asOf":null,"sourceUrl":"https://www.oracle.com/data-centers/dona-ana-county/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:23:06.600Z"},{"id":"bf503808-b1f9-46b0-8a86-c72becfd6f9b","facilityId":"6c38c4e4-5a86-4cf1-a3aa-97c1ea7c679c","field":"jobs_permanent","value":"1500","asOf":null,"sourceUrl":"https://www.oracle.com/data-centers/dona-ana-county/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:23:06.600Z"},{"id":"0927010e-367c-4014-898e-b69246df69c0","facilityId":"6c38c4e4-5a86-4cf1-a3aa-97c1ea7c679c","field":"record","value":"Oracle Dona Ana County AI Data Center","asOf":null,"sourceUrl":"https://www.oracle.com/data-centers/dona-ana-county/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:23:06.600Z"}],"resolved_facts":{"cooling_type":{"id":"728838cd-3dd1-49f7-a354-ffa1e797473a","facilityId":"6c38c4e4-5a86-4cf1-a3aa-97c1ea7c679c","field":"cooling_type","value":"closed-loop non-evaporative liquid cooling","asOf":null,"sourceUrl":"https://www.oracle.com/data-centers/dona-ana-county/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:23:06.600Z"},"jobs_construction":{"id":"c3b4bb2e-534a-410b-b3c0-7ffd9c888341","facilityId":"6c38c4e4-5a86-4cf1-a3aa-97c1ea7c679c","field":"jobs_construction","value":"7000","asOf":null,"sourceUrl":"https://www.oracle.com/data-centers/dona-ana-county/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:23:06.600Z"},"jobs_permanent":{"id":"bf503808-b1f9-46b0-8a86-c72becfd6f9b","facilityId":"6c38c4e4-5a86-4cf1-a3aa-97c1ea7c679c","field":"jobs_permanent","value":"1500","asOf":null,"sourceUrl":"https://www.oracle.com/data-centers/dona-ana-county/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:23:06.600Z"},"record":{"id":"0927010e-367c-4014-898e-b69246df69c0","facilityId":"6c38c4e4-5a86-4cf1-a3aa-97c1ea7c679c","field":"record","value":"Oracle Dona Ana County AI Data Center","asOf":null,"sourceUrl":"https://www.oracle.com/data-centers/dona-ana-county/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-18T03:23:06.600Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Oracle Dona Ana County AI Data Center","url":"https://registry.deploy.report/datacenters/facilities/oracle-dona-ana-county-new-mexico","address":{"@type":"PostalAddress","addressLocality":"Santa Teresa"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Oracle"}]}}