Data center facility
Microsoft Mount Pleasant 8537 Braun Road
Microsoft · Mount Pleasant. Every figure below is individually sourced and dated.
Part of the tracked campus Microsoft Fairwater Data Center (Mount Pleasant).
- Announced capex
- $3.3B
- Tenant
- Microsoft / OpenAI
- Cost per MW
- $7M/MW
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterWisconsin(43)
The deal
Inherited from campus Microsoft Fairwater Data Center (Mount Pleasant).
- tenant
- Microsoft / OpenAI · Self-tenant AI supercompute (Azure).
- chip supplier
- NVIDIA · GB200/B200-class GPUs (Epoch cites B200).
- utility
- We Energies · Regulated monopoly; sole grid power supplier, building new gas generation.
- grid operator
- MISO · We Energies operates within MISO.
- developer
- Microsoft · Owner-operator; Fairwater flagship AI datacenter on former Foxconn land.
Financial structure
Inherited from campus Microsoft Fairwater Data Center (Mount Pleasant).
- Microsoft Mount Pleasant campus investment (announced)
- $3.3B. Initial announced investment; Epoch estimates ~$14B deployed to date and ~$85B at full buildout. press release
Power
Inherited from campus Microsoft Fairwater Data Center (Mount Pleasant). Live grid demand and drought overlay only render on the campus page.
- Power source
- grid
- Grid operator
- MISO
- Interconnection
- Water
- Closed-loop liquid cooling filled once at construction with no ongoing water draw and no evaporation across about 90% of capacity; the remaining ~10% uses outdoor-air cooling and taps water only during peak summer heat. Microsoft compares annual water use to a single restaurant.
We Energies Oak Creek gas plant (5 simple-cycle turbines), 1.10 GW gas, Permitted. 1,100 MW proposed at the Oak Creek coal site; first turbine delivery May 2026, operations winter 2027-summer 2028.
We Energies Paris gas plant (Kenosha County), 0.13 GW gas, Permitted. 128 MW gas plant near Paris, WI; part of ~$2.77B of PSC-approved generation/transmission justified on Microsoft load.
Facility record
On the data center map
Evidence
Each fact traces to a source. This is what a verified record looks like next to an unsourced directory listing.
Timeline
- Aug 2026First recordedAdded to the DEPLOY registry as a sourced facility record
- Sep 2026Current: under construction
Facility-tier record. For campus-scale announced-vs-energized tracking see the data center index. DEPLOY is neutral infrastructure: what is claimed, what is verified, and when.
Common questions
What is Microsoft Mount Pleasant 8537 Braun Road?
Who operates Microsoft Mount Pleasant 8537 Braun Road?
Is Microsoft Mount Pleasant 8537 Braun Road operating?
How verified is the data on Microsoft Mount Pleasant 8537 Braun Road?
Deploy Watch
Track Microsoft Mount Pleasant 8537 Braun Road on Deploy.
We notify you when operating status, capacity, or the operator changes against a sourced record.
Cite this page
DEPLOY. (2026). Microsoft Mount Pleasant 8537 Braun Road: data center facility record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/facilities/microsoft-mount-pleasant-wi-8537-braun-road
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/facilities/microsoft-mount-pleasant-wi-8537-braun-road.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/facilities/microsoft-mount-pleasant-wi-8537-braun-road
- Data documentation: /data
- Query this programmatically: Deploy MCP