{"id":"b3ecd421-5914-4c3f-8689-2bc1d93cc56b","slug":"google-the-dalles-expansion-or","name":"Google The Dalles Data Center Expansion (2nd/3rd buildings)","aliases":[],"operatorCompanyId":"0ed0d0e3-6e8b-4701-a812-f13221399dd4","parentCampusId":"963decea-f424-4814-a8de-94389e75476a","lat":45.6253889,"lng":-121.2023887,"streetAddress":"3500 River Road, The Dalles, OR","locationId":"c66bd0d7-b5fb-4455-b8e1-77013d15b76d","status":"under_construction","facilityType":"hyperscale","criticalItMw":null,"buildingSqft":290000,"yearOperational":null,"yearAnnounced":null,"servingUtility":null,"wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"exact","reviewStatus":"reviewed","sources":[{"url":"https://www.google.com/about/datacenters/locations/"}],"notes":null,"createdAt":"2026-08-19T23:18:56.597Z","updatedAt":"2026-08-28T04:02:38.344Z","operator":{"name":"Google","slug":"google"},"parentCampus":{"id":"963decea-f424-4814-a8de-94389e75476a","slug":"google-the-dalles-wasco-county","name":"Google The Dalles Data Center Campus","aliases":["Google Design LLC The Dalles","The Dalles data center campus"],"locationId":"c66bd0d7-b5fb-4455-b8e1-77013d15b76d","lat":45.6253889,"lng":-121.2023887,"locationPrecision":"exact","landStatus":"former_industrial","lifecycleState":"partially_energized","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"WECC","waterSourceNotes":"2024 use ~434.4M gal/yr (~1.19M gpd), up from 104M gal/yr in 2012; underground water right up to 3.88M gpd acquired with smelter; city commitment up to 2M gpd by Jan 2028, potential 8M gpd with expansion. Retail water via City of The Dalles; subject of a 2022-2023 public-records dispute (The Oregonian).","servingUtility":null,"acreage":null,"totalBuildingSqft":null,"streetAddress":null,"notes":"Google's ~$1.8B campus on a former aluminum smelter site has multiple operational data centers under Enterprise Zone agreements (2005/2013/2015) plus newer buildings under a 2021 Strategic Investment Program agreement with The Dalles and Wasco County; the city approved a fifth data center. Per-building MW load is not disclosed, but scale (2024 water use ~434M gallons; a >100 MW dedicated wind PPA) indicates the campus well exceeds 100 MW.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"http://www.thedalles.gov/business/google_data_centers/ezandsipagreements.php","date":"2021-11-09","title":"Enterprise Zone & Strategic Investment Program Agreements with Google","publisher":"City of The Dalles"},{"url":"https://www.costar.com/article/1934080842/google-advances-plan-to-expand-sprawling-data-center-campus-near-portland-oregon","date":"2024-01-01","title":"Google advances plan to expand sprawling data center campus near Portland, Oregon","publisher":"CoStar"}],"reviewNote":null,"createdAt":"2026-08-17T20:25:12.469Z","updatedAt":"2026-08-28T14:22:23.508Z","parties":[{"id":"b2ee7485-0c2c-49a1-ad73-633fd413fa70","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","companyId":null,"externalName":"Northern Wasco County PUD","role":"utility","structureNotes":"Local public utility district","createdAt":"2026-08-17T20:25:14.003Z","company":null},{"id":"feb76bdc-445c-4f55-b47d-9d99aafe8ce5","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","companyId":null,"externalName":"Avangrid","role":"offtaker","structureNotes":"Wind PPA supplier","createdAt":"2026-08-17T20:25:14.757Z","company":null},{"id":"76357509-7505-4703-a61c-5e00086151b1","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","companyId":"0ed0d0e3-6e8b-4701-a812-f13221399dd4","externalName":"Google (Design, LLC)","role":"operator","structureNotes":"SIP/EZ agreements administered by Business Oregon","createdAt":"2026-08-17T20:25:13.239Z","company":{"id":"0ed0d0e3-6e8b-4701-a812-f13221399dd4","name":"Google","slug":"google"}},{"id":"c75b74fe-3de9-435e-bf82-3e32d4420cda","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","companyId":null,"externalName":"Whiting-Turner Contracting Co.","role":"construction","structureNotes":"General contractor for the ~$600M / two ~290,000 sq ft new-build expansion (broke ground Sept 2024).","createdAt":"2026-08-19T00:14:51.385Z","company":null},{"id":"eeffe2be-e68f-426b-8f0d-497c7c78d356","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","companyId":null,"externalName":"Northwest Aluminum","role":"land_owner","structureNotes":"Prior owner of the former smelter site; sold land to Google.","createdAt":"2026-08-19T00:14:52.525Z","company":null}],"financialClaims":[{"id":"0cf406da-edd1-40f5-9942-dec740314166","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","kind":"capex","label":"Cumulative Oregon investment since 2006","valueUsd":"1800000000","capUsd":null,"conditions":"~18-year cumulative figure touted by Google.","asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://www.kgw.com/article/money/business/google-touts-18-billion-investment-in-oregon-data-center/283-544712879","sourceType":"journalist_report","evidenceTier":"reported","createdAt":"2026-08-19T00:14:47.561Z"},{"id":"d2866a2c-0e09-48a8-9cac-d2aaa505eefe","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","kind":"tax_abatement","label":"Enterprise Zone abatements (2013 + 2015 agreements)","valueUsd":null,"capUsd":null,"conditions":"15-year abatements expiring ~2031/32 and ~2034/35; combined projected community payments ~$45.78M; effective property-tax discount reported ~92%.","asOf":"2021-06-01T00:00:00.000Z","sourceUrl":"https://www.thedalles.gov/business/google_data_centers/ezandsipagreements.php","sourceType":"permit_filing","evidenceTier":"verified","createdAt":"2026-08-19T00:14:48.336Z"},{"id":"599a3c66-342f-4af4-b7fd-4dc5220858dd","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","kind":"tax_abatement","label":"2021 Strategic Investment Program agreement (Design LLC)","valueUsd":null,"capUsd":null,"conditions":"Up to 2 data centers, 15-year abatement; Google pays 50% of assessed property tax on first project, 60% on second; $3M upfront per new development; plus Community Service Fee and Guaranteed Annual Payment.","asOf":"2021-06-01T00:00:00.000Z","sourceUrl":"https://www.thedalles.gov/business/google_data_centers/ezandsipagreements.php","sourceType":"permit_filing","evidenceTier":"verified","createdAt":"2026-08-19T00:14:49.097Z"}],"metricClaims":[{"id":"ad46abeb-3c26-4fcd-b5b9-09ba0f090bed","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","metricType":"jobs_permanent","valueNumeric":200,"valueText":">200 permanent jobs at site","unit":null,"grantingJurisdiction":null,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://www.kgw.com/article/money/business/google-touts-18-billion-investment-in-oregon-data-center/283-544712879","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:14:50.628Z"},{"id":"8d67941f-c01b-4f16-b15c-3e24e62f2ee7","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","metricType":"water_gpd","valueNumeric":1190000,"valueText":"~1.19M gpd (434.4M gal in 2024)","unit":null,"grantingJurisdiction":null,"asOf":"2024-06-01T00:00:00.000Z","sourceUrl":"https://www.opb.org/article/2026/01/23/the-dalles-mayor-data-center-google/","sourceType":"journalist_report","evidenceTier":"reported","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:14:50.238Z"}],"powerProjects":[{"id":"83b093d5-e867-4ec6-96d5-13f07498ca99","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","name":"Leaning Juniper IIB repower (Avangrid, Gilliam County)","type":"wind","capacityGw":0.1,"lifecycleState":"announced","sourceUrl":"https://oregonbusiness.com/google-advances-commitment-to-the-dalles-launching-sustainable-water-storage-system/","evidenceTier":"reported","note":"Google PPA for 100+ MW clean energy to serve The Dalles campus.","createdAt":"2026-08-17T20:25:12.848Z"},{"id":"b917540a-78d8-4e8d-8b9a-ed2ddcf3e107","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","name":"Leaning Juniper IIB (Avangrid) repowered wind farm","type":"wind","capacityGw":0.119,"lifecycleState":"energized","sourceUrl":"https://www.avangrid.com/w/avangrid-announces-119-megawatt-repower-project-in-oregon","evidenceTier":"verified","note":"119 MW repowered wind farm in Gilliam County; >100 MW PPA to Google delivered via Northern Wasco County PUD; repower cost up to ~$200M, ~150 construction jobs.","createdAt":"2026-08-19T00:14:49.865Z"}],"capacityClaims":[],"events":[{"id":"1ff17437-0832-407b-95b1-c6095259a103","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"land_owner: Northwest Aluminum","occurredAt":"2026-08-19T00:14:52.903Z","createdAt":"2026-08-19T00:14:52.903Z"},{"id":"81380994-1f34-4a56-8c9f-0029d9a0b48e","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"construction: Whiting-Turner Contracting Co.","occurredAt":"2026-08-19T00:14:51.761Z","createdAt":"2026-08-19T00:14:51.761Z"},{"id":"3e5673e7-b332-4c51-b2ff-a5c905e61e19","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tax_abatement: 2021 Strategic Investment Program agreement (Design LLC)","occurredAt":"2026-08-19T00:14:49.478Z","createdAt":"2026-08-19T00:14:49.478Z"},{"id":"e4adf33e-5169-4eba-ad56-fc254024202f","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"tax_abatement: Enterprise Zone abatements (2013 + 2015 agreements)","occurredAt":"2026-08-19T00:14:48.712Z","createdAt":"2026-08-19T00:14:48.712Z"},{"id":"d7bc47b0-0685-4260-87ab-1565536321f4","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Cumulative Oregon investment since 2006","occurredAt":"2026-08-19T00:14:47.957Z","createdAt":"2026-08-19T00:14:47.957Z"},{"id":"cdae7d42-29d9-4ca0-bfd4-99efd30abc99","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"offtaker: Avangrid","occurredAt":"2026-08-17T20:25:15.145Z","createdAt":"2026-08-17T20:25:15.145Z"},{"id":"1d83a728-0433-4dbd-9f7d-3ddabac8c6ad","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: Northern Wasco County PUD","occurredAt":"2026-08-17T20:25:14.380Z","createdAt":"2026-08-17T20:25:14.380Z"},{"id":"a4f80086-ebd6-44d0-bad3-a48243a3a26b","dataCenterId":"963decea-f424-4814-a8de-94389e75476a","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"operator: Google (Design, LLC)","occurredAt":"2026-08-17T20:25:13.622Z","createdAt":"2026-08-17T20:25:13.622Z"}]},"location":{"name":"The Dalles","slug":"the-dalles-oregon","kind":"city","lat":45.6015056,"lng":-121.1841587},"evidence":[{"id":"d4de7e1d-fc91-4964-a702-52b00355c15a","facilityId":"b3ecd421-5914-4c3f-8689-2bc1d93cc56b","field":"buildingSqft","value":"290000","asOf":null,"sourceUrl":"https://columbiacommunityconnection.com/the-dalles/google-gets-another-go-second-data-center-garners-td-city-approval","sourceType":"operator","tier":"reported","note":null,"createdAt":"2026-08-21T20:40:12.710Z"},{"id":"08ed0681-4539-4a70-b0db-b63571e3bbc0","facilityId":"b3ecd421-5914-4c3f-8689-2bc1d93cc56b","field":"record","value":"Google The Dalles Data Center Expansion (2nd/3rd buildings)","asOf":null,"sourceUrl":"https://www.google.com/about/datacenters/locations/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T23:18:56.978Z"},{"id":"25b3daaf-9c53-4321-b905-678f05428787","facilityId":"b3ecd421-5914-4c3f-8689-2bc1d93cc56b","field":"status","value":"under_construction","asOf":null,"sourceUrl":"https://www.google.com/about/datacenters/locations/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T23:18:56.978Z"},{"id":"cf9e7a01-b740-4ea3-a3c0-39be002ee1d5","facilityId":"b3ecd421-5914-4c3f-8689-2bc1d93cc56b","field":"streetAddress","value":"3500 River Road, The Dalles, OR","asOf":null,"sourceUrl":"https://columbiacommunityconnection.com/the-dalles/google-gets-another-go-second-data-center-garners-td-city-approval","sourceType":"operator","tier":"reported","note":"second/expansion building at same 3500 River Rd site","createdAt":"2026-08-21T20:40:13.099Z"}],"resolved_facts":{"buildingSqft":{"id":"d4de7e1d-fc91-4964-a702-52b00355c15a","facilityId":"b3ecd421-5914-4c3f-8689-2bc1d93cc56b","field":"buildingSqft","value":"290000","asOf":null,"sourceUrl":"https://columbiacommunityconnection.com/the-dalles/google-gets-another-go-second-data-center-garners-td-city-approval","sourceType":"operator","tier":"reported","note":null,"createdAt":"2026-08-21T20:40:12.710Z"},"record":{"id":"08ed0681-4539-4a70-b0db-b63571e3bbc0","facilityId":"b3ecd421-5914-4c3f-8689-2bc1d93cc56b","field":"record","value":"Google The Dalles Data Center Expansion (2nd/3rd buildings)","asOf":null,"sourceUrl":"https://www.google.com/about/datacenters/locations/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T23:18:56.978Z"},"status":{"id":"25b3daaf-9c53-4321-b905-678f05428787","facilityId":"b3ecd421-5914-4c3f-8689-2bc1d93cc56b","field":"status","value":"under_construction","asOf":null,"sourceUrl":"https://www.google.com/about/datacenters/locations/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T23:18:56.978Z"},"streetAddress":{"id":"cf9e7a01-b740-4ea3-a3c0-39be002ee1d5","facilityId":"b3ecd421-5914-4c3f-8689-2bc1d93cc56b","field":"streetAddress","value":"3500 River Road, The Dalles, OR","asOf":null,"sourceUrl":"https://columbiacommunityconnection.com/the-dalles/google-gets-another-go-second-data-center-garners-td-city-approval","sourceType":"operator","tier":"reported","note":"second/expansion building at same 3500 River Rd site","createdAt":"2026-08-21T20:40:13.099Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Google The Dalles Data Center Expansion (2nd/3rd buildings)","url":"https://registry.deploy.report/datacenters/facilities/google-the-dalles-expansion-or","geo":{"@type":"GeoCoordinates","latitude":45.6253889,"longitude":-121.2023887},"address":{"@type":"PostalAddress","addressLocality":"The Dalles","streetAddress":"3500 River Road, The Dalles, OR"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"Google"}]}}