{"id":"a7ae6ae5-d35e-45d9-8e00-3b94e3ef5a9f","slug":"databank-red-oak-campus-ellis-county-tx","name":"DataBank Red Oak Campus (DFW9-16)","aliases":[],"operatorCompanyId":"372ff549-be5b-4b20-9b1d-3bbdc7005de0","parentCampusId":null,"lat":null,"lng":null,"streetAddress":null,"locationId":"f17d7a76-5c4c-47f8-9212-02fb349fac61","status":"under_construction","facilityType":"hyperscale","criticalItMw":480,"buildingSqft":null,"yearOperational":null,"yearAnnounced":null,"servingUtility":null,"wikidataId":null,"osmId":null,"dataSourceFamily":"c1_operator","locationPrecision":"city","reviewStatus":"reviewed","sources":[{"url":"https://www.datacenterdynamics.com/en/news/databank-announces-480mw-campus-in-dallas-texas/"}],"notes":null,"createdAt":"2026-08-19T04:49:33.560Z","updatedAt":"2026-08-19T05:08:40.807Z","operator":{"name":"DataBank","slug":"databank"},"parentCampus":null,"location":{"name":"Red Oak","slug":"red-oak-texas","kind":"city","lat":32.5143898,"lng":-96.8066615},"evidence":[{"id":"2c4da32d-0441-42b2-9af4-f437fbd2a21a","facilityId":"a7ae6ae5-d35e-45d9-8e00-3b94e3ef5a9f","field":"critical_it_mw","value":"480 MW (240 MW phase 1)","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/databank-announces-480mw-campus-in-dallas-texas/","sourceType":"operator_page","tier":"claimed","note":null,"createdAt":"2026-08-19T04:49:33.945Z"},{"id":"5c0e0b03-2a2a-449b-8c20-1de35aaa96f3","facilityId":"a7ae6ae5-d35e-45d9-8e00-3b94e3ef5a9f","field":"record","value":"DataBank Red Oak Campus (DFW9-16)","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/databank-announces-480mw-campus-in-dallas-texas/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:49:33.945Z"},{"id":"af26f113-46ac-44c9-8293-9556d7ab884a","facilityId":"a7ae6ae5-d35e-45d9-8e00-3b94e3ef5a9f","field":"status","value":"under construction; 292 acres, up to 8 buildings, $2B loan for first three secured Apr 2026","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/databank-announces-480mw-campus-in-dallas-texas/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:49:33.945Z"}],"resolved_facts":{"critical_it_mw":{"id":"2c4da32d-0441-42b2-9af4-f437fbd2a21a","facilityId":"a7ae6ae5-d35e-45d9-8e00-3b94e3ef5a9f","field":"critical_it_mw","value":"480 MW (240 MW phase 1)","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/databank-announces-480mw-campus-in-dallas-texas/","sourceType":"operator_page","tier":"claimed","note":null,"createdAt":"2026-08-19T04:49:33.945Z"},"record":{"id":"5c0e0b03-2a2a-449b-8c20-1de35aaa96f3","facilityId":"a7ae6ae5-d35e-45d9-8e00-3b94e3ef5a9f","field":"record","value":"DataBank Red Oak Campus (DFW9-16)","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/databank-announces-480mw-campus-in-dallas-texas/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:49:33.945Z"},"status":{"id":"af26f113-46ac-44c9-8293-9556d7ab884a","facilityId":"a7ae6ae5-d35e-45d9-8e00-3b94e3ef5a9f","field":"status","value":"under construction; 292 acres, up to 8 buildings, $2B loan for first three secured Apr 2026","asOf":null,"sourceUrl":"https://www.datacenterdynamics.com/en/news/databank-announces-480mw-campus-in-dallas-texas/","sourceType":"operator_page","tier":"reported","note":null,"createdAt":"2026-08-19T04:49:33.945Z"}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"DataBank Red Oak Campus (DFW9-16)","url":"https://registry.deploy.report/datacenters/facilities/databank-red-oak-campus-ellis-county-tx","address":{"@type":"PostalAddress","addressLocality":"Red Oak"},"additionalProperty":[{"@type":"PropertyValue","name":"operator","value":"DataBank"}]}}