DEPLOYDatabase

Data center campus

GMI Cloud Taiwan AI Factory (Taoyuan)

GMI Cloud Taiwan AI Factory is an AI data center campus developed by GMI Cloud in Taoyuan, Taiwan. 0.02 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Partially energized · GMI Cloud · Taiwan Power Company (Taipower) · Taoyuan, Taiwan, Taiwan


Capacity: announced vs energized

Announced-to-energized gap: 0.02 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

GMI Cloud Taiwan AI Factory (Taoyuan) capacity claims
Source
Announced0.02 GW2025-11-17reportedjournalist report

Key facts

0.02 GW

Announced

0 GW

Energized

GMI Cloud

Developer

Taiwan

Location

0.02 GW

Announced-to-energized gap

Reported facts

Structured facts sourced from citations already on this record. Each fact traces to a source in the References section below.

Scale (company-claimed, Nov 2025)
$500M AI Factory with 7,000 NVIDIA Blackwell Ultra GPUs in 96 GB300 NVL72 racks; about 16 MW.
Online target (company-claimed)
March 2026; billed as Taiwan's first sovereign AI Factory.
Networking (company-claimed)
NVLink, Quantum InfiniBand, Spectrum-X Ethernet and BlueField DPUs.
Initial customers (reported, Nov 2025)
NVIDIA, Trend Micro, Wistron, Chunghwa System Integration, VAST Data and TECO.
Contract value (reported, Nov 2025)
CEO Alex Yeh expects about $1B total contract value once fully operating.
Operator footprint (reported)
NVIDIA Cloud Partner with data centers in the US, Taiwan, Singapore, Thailand and Japan.
Operating status (company-claimed, Mar 2026)
TPE11 operational: 16 MW, 7,000+ GB300 GPUs; Phase 1 in Q2 2026, full buildout by Q4 2026.

On the data center map

Every tracked data center is on this map, centered on GMI Cloud Taiwan AI Factory. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.

The deal

operator
GMI Cloud · GMI Cloud (CEO Alex Yeh).
grid operator
Taiwan Power Company (Taipower) · 16 MW expected to exceed the 5 MW allocation limit.
chip supplier
NVIDIA · ~7,000 GB300 (Blackwell Ultra).

Why here

GMI Cloud Taiwan AI Factory is in Taoyuan, Taiwan. It connects to the Taiwan Power Company (Taipower) grid. This siting summary is composed from the record's held fields, not speculation; see methodology.

Timeline

  1. Aug 2026
    party added
    chip_supplier: NVIDIA
  2. Nov 2026
    Current: Partially energized

Sources

ff470a39-3010-4b20-99dd-e0585700574a · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Common questions

What is GMI Cloud Taiwan AI Factory (Taoyuan)?
GMI Cloud Taiwan AI Factory (Taoyuan) is an AI data center campus tracked on the DEPLOY registry, located in Taoyuan, Taiwan. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will GMI Cloud Taiwan AI Factory (Taoyuan) use?
GMI Cloud Taiwan AI Factory (Taoyuan) has 0.02 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building GMI Cloud Taiwan AI Factory (Taoyuan)?
GMI Cloud is recorded as a party to GMI Cloud Taiwan AI Factory (Taoyuan) on the DEPLOY registry. The full party list, with each role, is on the record.
Is GMI Cloud Taiwan AI Factory (Taoyuan) operating yet?
As of the most recent verification on the DEPLOY registry, GMI Cloud Taiwan AI Factory (Taoyuan) is partially energized. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on GMI Cloud Taiwan AI Factory (Taoyuan)?
This record has been checked against its cited sources by automated agents for the indexed registry; it has not been individually reviewed by a person. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track GMI Cloud Taiwan AI Factory (Taoyuan) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). GMI Cloud Taiwan AI Factory (Taoyuan): AI data center campus record. Retrieved November 11, 2026, from https://registry.deploy.report/datacenters/gmi-cloud-taiwan-ai-factory-taoyuan

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces