Kraft Group Sutton Data Center Campus is an AI data center campus developed by The Kraft Group in Massachusetts, Sutton. 0.90 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Announced · The Kraft Group · Sutton, Massachusetts, United States
Capacity: announced vs energized
Announced-to-energized gap: 0.90 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
| Source | ||||
|---|---|---|---|---|
| Announced | 0.90 GW | 2026-11-10 | reported | journalist report |
Key facts
Lifecycle
Announced
Energized
The Kraft Group
Developer
Location
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on Kraft Group Sutton Data Center Campus. Pan or zoom out to see how close rivals are building.
In clusterMassachusetts(42)
The deal
- developer
- The Kraft Group
- developer
- Unified Global Packaging Group
Power
- Interconnection
County water status: Abnormally dry (D0) in Sutton County, week of 2026-11-03 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Kraft Group Sutton Data Center Campus is in Massachusetts, Sutton. This siting summary is composed from the record's held fields, not speculation; see methodology.
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Timeline
- Nov 2026capacity changedannounced: unknown to 0.9
- Nov 2026Current: Announced
Sources
- Kraft Group Proposes $16B Data Center Campus in Sutton · This Week in Worcester
- 900-megawatt data center campus proposed for central Massachusetts, backed by Kraft Group · CBS Boston
b34aa5e9-cd0d-4c3d-881c-76cf4dfc4a0e · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Kraft Group Sutton Data Center Campus?
How much power will Kraft Group Sutton Data Center Campus use?
Who is building Kraft Group Sutton Data Center Campus?
Is Kraft Group Sutton Data Center Campus operating yet?
How verified is the data on Kraft Group Sutton Data Center Campus?
Deploy Watch
Track Kraft Group Sutton Data Center Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Kraft Group Sutton Data Center Campus: AI data center campus record. Retrieved November 11, 2026, from https://registry.deploy.report/datacenters/kraft-group-sutton-data-center-campus
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/kraft-group-sutton-data-center-campus.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/kraft-group-sutton-data-center-campus
- Data documentation: /data
- Query this programmatically: Deploy MCP