Tract Master-Planned Data Center Park is a tracked AI data center campus in Nevada, Storey County. Tract has assembled 2,200+ acres (part of a broader ~8,590-acre position) at the Tahoe-Reno Industrial Center in Storey County, positioned as master-planned data center land for hyperscalers, with an NV Energy relationsh

Announced · Tract (Tract Capital) · greenfield · WECC · Storey County, Nevada, United States


Capacity: announced vs energized

Promised online: 2026. 3 months away. Claimed by Tract / NV Energy (source).

Tract Master-Planned Data Center Park (TRIC) capacity claims
Source
Contracted2 GW2023-10-02claimedpress release
Under construction0.40 GW2026-05-01reportedjournalist report

Key facts

announced

Lifecycle

0 GW

Energized

Tract (Tract Capital)

Developer

WECC

Grid

On the data center map

Every tracked data center is on this map, centered on Tract Master-Planned Data Center Park. Pan or zoom out to see how close rivals are building.

Free to use on your site, with a link back to DEPLOY.
The story of Tract Master-Planned Data Center Park (TRIC)
Announced capex
$10B

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterNevada(65)

The deal

developer
Tract (Tract Capital) · Master-planned data center land developer
utility
NV Energy · WECC; permanent power provider
developer
Fleet Data Centers · Subsidiary of Tract Capital Management; developing South Valley and Peru Ridge campuses

Power

Power source
mixed
Grid operator
WECC
Interconnection
Water
Tract controls over 1,100 acre-feet of water rights at TRIC

South Valley temporary gas plant, 0.14 GW gas, Announced. Air-quality permit application filed ~2026-04-20; temporary 2-3 yr bridge.

Peru Ridge temporary gas plant, 0.22 GW gas, Announced. Air-quality/state energy-regulator application; construction targeted 2027.

Why here

Tract Master-Planned Data Center Park sits on greenfield in Nevada, Storey County. It connects to the WECC grid, draws on mixed power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Fleet Data Centers construction (South Valley + Peru Ridge)
$10B journalist report

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States
FAA Proposed Rule: Enabling Supersonic Overland Flight (July 2026)operational restriction · 2026-07-02 · United States

Timeline

  1. Aug 2026
    party added
    developer: Fleet Data Centers
  2. Sep 2026
    Current: Announced

Sources

79dc4d14-f2b6-4caf-b4d9-2620039c6a94 · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Tract Master-Planned Data Center Park (TRIC)?
Tract Master-Planned Data Center Park (TRIC) is an AI data center campus tracked on the DEPLOY registry, located in Storey County. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
Who is building Tract Master-Planned Data Center Park (TRIC)?
Tract (Tract Capital) is recorded as a party to Tract Master-Planned Data Center Park (TRIC) on the DEPLOY registry.
Is Tract Master-Planned Data Center Park (TRIC) operating yet?
As of the most recent verification on the DEPLOY registry, Tract Master-Planned Data Center Park (TRIC) is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Tract Master-Planned Data Center Park (TRIC)?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Tract Master-Planned Data Center Park (TRIC) on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Tract Master-Planned Data Center Park (TRIC): AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/tract-tric-storey-county-nevada

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces