Cayuga Data Campus

Cayuga Data Campus is an AI data center campus developed by TeraWulf Inc. in New York, Lansing. 0.40 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.

Announced · TeraWulf Inc. · Former industrial site · NYISO · Lansing, New York, United States


Capacity: announced vs energized

Announced-to-energized gap: 0.40 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.

Promised online: 2026. 3 months away. Claimed by TeraWulf Inc. (source).

Cayuga Data Campus capacity claims
Source
Announced0.40 GW2026-03-31verifiedsec filing
Under construction0.14 GW2026-02-26reportedearnings call

Key facts

announced

Lifecycle

0.40 GW

Announced

0 GW

Energized

TeraWulf Inc.

Developer

NYISO

Grid

0.40 GW

Announced-to-energized gap

On the data center map

Every tracked data center is on this map, centered on Cayuga Data Campus. Pan or zoom out to see how close rivals are building.

Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.

Free to use on your site, with a link back to DEPLOY.
The story of Cayuga Data Campus
Announced capex
$98M
Cooling
Regional grid ~90% zero-carbon with electricity averaging below $0.05/kWh; existing substation and four transmission lines (115kV and 34.5kV) plus redundant fiber to NYC
Land owner
Cayuga Operating Company LLC
Derived
Cost per MW
$245K/MW

Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.

In clusterNew York(82)

The deal

developer
TeraWulf Inc. · NASDAQ: WULF; 80-year site lease
utility
NYISO
land owner
Cayuga Operating Company LLC · Site lessor under the 80-year Cayuga ground lease; parent is Riesling Power LLC (received the $95M stock + $3M cash consideration)
construction
Ramboll · Engineering/environmental partner for the coal-to-digital-hub redevelopment

Power

Power source
grid
Grid operator
NYISO
Interconnection
Water
Existing industrial-scale water intake system at former coal plant; TeraWulf states it will NOT rely on Cayuga Lake to cool the data center

Cayuga on-site solar, 0.07 GW solar, Announced. ~67 MW solar planned as part of the low-carbon redevelopment

Cayuga battery storage, storage, Announced. 800 MWh battery storage system in advanced development on adjacent parcels

The New York (NYISO) grid demand right now: 12.2 GW (EIA-930, 2026-09-27 08:00). Cayuga Data Campus's announced 0.40 GW would be 3.3% of the grid's current load.

County water status: No drought in Tompkins County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.

Why here

Cayuga Data Campus sits on former industrial site in New York, Lansing. It connects to the NYISO grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.

Financial structure

Cayuga ground-lease consideration
$98M. $95M in TeraWulf common stock (15-day trailing VWAP) plus $3M cash paid to Riesling Power (Cayuga's parent) company filing

Regulatory paper trail

The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.

NHTSA Recall: Zoox Robotaxi Software Update for Heavy Smoke Visibility (26E044)operational restriction · 2026-07-15 · United States
FCC Proposed Fines Against Drone Companies (July 2026)other · 2026-07-10 · United States

Investment, workforce and specs

Cooling
Regional grid ~90% zero-carbon with electricity averaging below $0.05/kWh; existing substation and four transmission lines (115kV and 34.5kV) plus redundant fiber to NYC source

Timeline

  1. Aug 2026
    party added
    construction: Ramboll
  2. Sep 2026
    Current: Announced

Sources

bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.

Head-to-head

Common questions

What is Cayuga Data Campus?
Cayuga Data Campus is an AI data center campus tracked on the DEPLOY registry, located in Lansing. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.
How much power will Cayuga Data Campus use?
Cayuga Data Campus has 0.40 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.
Who is building Cayuga Data Campus?
TeraWulf Inc. is recorded as a party to Cayuga Data Campus on the DEPLOY registry.
Is Cayuga Data Campus operating yet?
As of the most recent verification on the DEPLOY registry, Cayuga Data Campus is announced but not yet built. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.
How verified is the data on Cayuga Data Campus?
A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

Deploy Watch

Track Cayuga Data Campus on Deploy.

We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.

Cite this page

DEPLOY. (2026). Cayuga Data Campus: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/terawulf-cayuga-lansing-new-york

More citation formats (MLA, Chicago, BibTeX) →
CC BY 4.0

The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.

Machine-readable surfaces