Data center campus
Cayuga Data Campus
Cayuga Data Campus is an AI data center campus developed by TeraWulf Inc. in New York, Lansing. 0.40 GW of capacity has been announced; none is energized yet. The gap is what this page tracks: what is claimed versus what is actually built, each figure dated and sourced.
Announced · TeraWulf Inc. · Former industrial site · NYISO · Lansing, New York, United States
Capacity: announced vs energized
Announced-to-energized gap: 0.40 GW. Every figure below is a single dated, sourced claim. Current best per series resolves by evidence tier, then date. See the methodology.
Promised online: 2026. 3 months away. Claimed by TeraWulf Inc. (source).
| Source | ||||
|---|---|---|---|---|
| Announced | 0.40 GW | 2026-03-31 | verified | sec filing |
| Under construction | 0.14 GW | 2026-02-26 | reported | earnings call |
Key facts
Lifecycle
Announced
Energized
TeraWulf Inc.
Developer
Location
Grid
Announced-to-energized gap
On the data center map
Every tracked data center is on this map, centered on Cayuga Data Campus. Pan or zoom out to see how close rivals are building.
Approximate pin. We hold a city-level coordinate for this campus, not a verified site coordinate, so the marker shows the city rather than the parcel. The satellite strip and building outlines stay off until the site coordinate is sourced.
- Announced capex
- $98M
- Cooling
- Regional grid ~90% zero-carbon with electricity averaging below $0.05/kWh; existing substation and four transmission lines (115kV and 34.5kV) plus redundant fiber to NYC
- Land owner
- Cayuga Operating Company LLC
- Cost per MW
- $245K/MW
Every figure is one row in the ledger below with its source. Derived rows are pure arithmetic on the rows above (not new claims). Absent lines mean the fact isn't on record yet.
In clusterNew York(82)
The deal
- developer
- TeraWulf Inc. · NASDAQ: WULF; 80-year site lease
- utility
- NYISO
- land owner
- Cayuga Operating Company LLC · Site lessor under the 80-year Cayuga ground lease; parent is Riesling Power LLC (received the $95M stock + $3M cash consideration)
- construction
- Ramboll · Engineering/environmental partner for the coal-to-digital-hub redevelopment
Power
- Power source
- grid
- Grid operator
- NYISO
- Interconnection
- Water
- Existing industrial-scale water intake system at former coal plant; TeraWulf states it will NOT rely on Cayuga Lake to cool the data center
Cayuga on-site solar, 0.07 GW solar, Announced. ~67 MW solar planned as part of the low-carbon redevelopment
Cayuga battery storage, storage, Announced. 800 MWh battery storage system in advanced development on adjacent parcels
The New York (NYISO) grid demand right now: 12.2 GW (EIA-930, 2026-09-27 08:00). Cayuga Data Campus's announced 0.40 GW would be 3.3% of the grid's current load.
County water status: No drought in Tompkins County, week of 2026-09-22 (US Drought Monitor). Data centers are large water users for cooling; this is the neutral local water picture.
Why here
Cayuga Data Campus sits on former industrial site in New York, Lansing. It connects to the NYISO grid, draws on grid power. This siting summary is composed from the record's held fields, not speculation; see methodology.
Financial structure
- Cayuga ground-lease consideration
- $98M. $95M in TeraWulf common stock (15-day trailing VWAP) plus $3M cash paid to Riesling Power (Cayuga's parent) company filing
Regulatory paper trail
The filings and rules on record for this site and its jurisdiction, most recent first. Each is a sourced, dated artifact you can follow to the primary document.
Investment, workforce and specs
- Cooling
- Regional grid ~90% zero-carbon with electricity averaging below $0.05/kWh; existing substation and four transmission lines (115kV and 34.5kV) plus redundant fiber to NYC source
Timeline
- Aug 2026party addedconstruction: Ramboll
- Sep 2026Current: Announced
Sources
- TeraWulf Inc. Form 10-Q (period ended March 31, 2026)
- TeraWulf Reports Fourth Quarter and Full Year 2025 Results
bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba · Tracked with DEPLOY's verified-vs-claimed methodology. Every term is defined in the glossary. Announced numbers are claims, not built capacity.
Head-to-head
Common questions
What is Cayuga Data Campus?
How much power will Cayuga Data Campus use?
Who is building Cayuga Data Campus?
Is Cayuga Data Campus operating yet?
How verified is the data on Cayuga Data Campus?
Deploy Watch
Track Cayuga Data Campus on Deploy.
We notify you when energized capacity, lifecycle state, or a new dated capacity claim changes against primary-source evidence, not when the developer issues a press release.
Cite this page
DEPLOY. (2026). Cayuga Data Campus: AI data center campus record. Retrieved September 27, 2026, from https://registry.deploy.report/datacenters/terawulf-cayuga-lansing-new-york
More citation formats (MLA, Chicago, BibTeX) →The verified data on this page is available under a Creative Commons Attribution 4.0 license: reuse the facts freely, with attribution to DEPLOY (deploy.report). The prose, design, and any imagery are not included and keep their own rights.
Machine-readable surfaces
- Markdown mirror: /datacenters/terawulf-cayuga-lansing-new-york.md
- JSON-LD: embedded in this page’s head
- REST API: /v1/datacenters/terawulf-cayuga-lansing-new-york
- Data documentation: /data
- Query this programmatically: Deploy MCP