{"id":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","slug":"terawulf-cayuga-lansing-new-york","name":"Cayuga Data Campus","aliases":["Cayuga","Lansing NY site","former Cayuga coal plant"],"locationId":"8a5f6efa-5c28-46e1-8510-c77cc35c3bc2","lat":42.5479,"lng":-76.5988,"locationPrecision":"city","landStatus":"former_industrial","lifecycleState":"announced","powerSourceMix":"grid","interconnectionQueueStatus":null,"interconnectionQueueId":null,"expectedEnergizationDate":null,"dedicatedSubstation":null,"gridOperator":"NYISO","waterSourceNotes":"Existing industrial-scale water intake system at former coal plant; TeraWulf states it will NOT rely on Cayuga Lake to cool the data center","servingUtility":null,"acreage":183,"totalBuildingSqft":null,"streetAddress":null,"notes":"TeraWulf's second New York site, on the former Cayuga coal-plant property in Lansing, NY, under an 80-year lease granting exclusive rights to develop up to 400 MW (company cites ~320 critical IT MW upon permitting). Roughly 138 MW of power is expected ready-for-service in 2026. Site is early-stage: full tenant lineup, financing, and build schedule beyond the first tranche are not yet disclosed.","keyFacts":[],"reviewStatus":"reviewed","sources":[{"url":"https://www.sec.gov/Archives/edgar/data/0001083301/000108330126000092/wulf-20260331.htm","date":"2026-05-01","title":"TeraWulf Inc. Form 10-Q (period ended March 31, 2026)","publisher":"SEC EDGAR"},{"url":"https://www.globenewswire.com/news-release/2026/02/26/3246105/0/en/TeraWulf-Reports-Fourth-Quarter-and-Full-Year-2025-Results.html","date":"2026-02-26","title":"TeraWulf Reports Fourth Quarter and Full Year 2025 Results","publisher":"GlobeNewswire"}],"reviewNote":null,"createdAt":"2026-08-17T20:22:27.323Z","updatedAt":"2026-08-28T14:22:23.889Z","location":{"id":"8a5f6efa-5c28-46e1-8510-c77cc35c3bc2","name":"Lansing","slug":"lansing-new-york","kind":"city","parentLocationId":"f5886176-6ea5-4971-aa8b-a25812f29de3","region":"New York","lat":42.5479,"lng":-76.5988,"reviewStatus":"reviewed","aliases":[],"collisionRisk":"high","reviewNote":null,"createdAt":"2026-08-17T20:22:26.943Z","updatedAt":"2026-08-21T03:20:12.226Z"},"parties":[{"id":"ba03d7c8-e760-4ef1-a4f1-0ff6f4450096","dataCenterId":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","companyId":null,"externalName":"TeraWulf Inc.","role":"developer","structureNotes":"NASDAQ: WULF; 80-year site lease","createdAt":"2026-08-17T20:22:29.472Z","company":null},{"id":"bfdb356d-0808-4a13-b986-b5b96808b9de","dataCenterId":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","companyId":null,"externalName":"NYISO","role":"utility","structureNotes":null,"createdAt":"2026-08-17T20:22:30.238Z","company":null},{"id":"5976545a-3a89-462b-bf72-8ac8485ad5fe","dataCenterId":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","companyId":null,"externalName":"Cayuga Operating Company LLC","role":"land_owner","structureNotes":"Site lessor under the 80-year Cayuga ground lease; parent is Riesling Power LLC (received the $95M stock + $3M cash consideration)","createdAt":"2026-08-19T00:28:59.216Z","company":null},{"id":"f0df67e4-d40f-4c96-a745-489dcbfcc3c0","dataCenterId":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","companyId":null,"externalName":"Ramboll","role":"construction","structureNotes":"Engineering/environmental partner for the coal-to-digital-hub redevelopment","createdAt":"2026-08-19T00:29:00.377Z","company":null}],"capacityClaims":[{"id":"0b618837-3739-4c8f-817a-63b19d858574","dataCenterId":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","series":"announced","valueGw":0.4,"asOf":"2026-03-31T00:00:00.000Z","sourceUrl":"https://www.sec.gov/Archives/edgar/data/0001083301/000108330126000092/wulf-20260331.htm","sourceType":"sec_filing","evidenceTier":"verified","supersedesId":null,"note":"80-year lease; exclusive rights to develop up to 400 MW (~320 critical IT MW cited)","createdAt":"2026-08-17T20:22:28.092Z"},{"id":"4c6d8c65-9878-4057-9d4a-2fa0dc741d4e","dataCenterId":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","series":"under_construction","valueGw":0.138,"asOf":"2026-02-26T00:00:00.000Z","sourceUrl":"https://www.globenewswire.com/news-release/2026/02/26/3246105/0/en/TeraWulf-Reports-Fourth-Quarter-and-Full-Year-2025-Results.html","sourceType":"earnings_call","evidenceTier":"reported","supersedesId":null,"note":"~138 MW expected ready-for-service in 2026","createdAt":"2026-08-17T20:22:28.931Z"}],"financialClaims":[{"id":"670bc5bb-3ea1-4e85-ac1c-c3969ef07746","dataCenterId":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","kind":"capex","label":"Cayuga ground-lease consideration","valueUsd":"98000000","capUsd":null,"conditions":"$95M in TeraWulf common stock (15-day trailing VWAP) plus $3M cash paid to Riesling Power (Cayuga's parent)","asOf":"2025-08-14T00:00:00.000Z","sourceUrl":"https://investors.terawulf.com/news-events/press-releases/detail/113/terawulf-secures-long-term-ground-lease-at-cayuga-site-to-expand-high-performance-computing-infrastructure","sourceType":"company_filing","evidenceTier":"verified","createdAt":"2026-08-19T00:28:56.843Z"}],"metricClaims":[{"id":"0ba96f5f-f53e-4b10-a24a-8a2cfc3f99ab","dataCenterId":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","metricType":"cooling_type","valueNumeric":null,"valueText":"Regional grid ~90% zero-carbon with electricity averaging below $0.05/kWh; existing substation and four transmission lines (115kV and 34.5kV) plus redundant fiber to NYC","unit":null,"grantingJurisdiction":null,"asOf":"2025-06-01T00:00:00.000Z","sourceUrl":"https://investors.terawulf.com/news-events/press-releases/detail/113/terawulf-secures-long-term-ground-lease-at-cayuga-site-to-expand-high-performance-computing-infrastructure","sourceType":"company_filing","evidenceTier":"verified","supersedesId":null,"note":null,"createdAt":"2026-08-19T00:28:58.452Z"}],"powerProjects":[{"id":"d484895d-7cda-4d5f-93c3-0f2a836f34e6","dataCenterId":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","name":"Cayuga on-site solar","type":"solar","capacityGw":0.067,"lifecycleState":"announced","sourceUrl":"https://investors.terawulf.com/news-events/press-releases/detail/113/terawulf-secures-long-term-ground-lease-at-cayuga-site-to-expand-high-performance-computing-infrastructure","evidenceTier":"reported","note":"~67 MW solar planned as part of the low-carbon redevelopment","createdAt":"2026-08-19T00:28:57.627Z"},{"id":"54454779-46cf-450f-bd54-533eb044c95c","dataCenterId":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","name":"Cayuga battery storage","type":"storage","capacityGw":null,"lifecycleState":"announced","sourceUrl":"https://investors.terawulf.com/news-events/press-releases/detail/113/terawulf-secures-long-term-ground-lease-at-cayuga-site-to-expand-high-performance-computing-infrastructure","evidenceTier":"reported","note":"800 MWh battery storage system in advanced development on adjacent parcels","createdAt":"2026-08-19T00:28:58.007Z"}],"facilities":[],"incidents":[],"events":[{"id":"024cc0a1-924d-4b4f-92e2-bf5eb6646846","dataCenterId":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"construction: Ramboll","occurredAt":"2026-08-19T00:29:00.754Z","createdAt":"2026-08-19T00:29:00.754Z"},{"id":"d8ba46c1-3348-45bf-b898-07d0d28088c7","dataCenterId":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"land_owner: Cayuga Operating Company LLC","occurredAt":"2026-08-19T00:28:59.597Z","createdAt":"2026-08-19T00:28:59.597Z"},{"id":"3a4ed102-159a-4b41-9d5d-2f5330e761d7","dataCenterId":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","eventType":"financial_recorded","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"capex: Cayuga ground-lease consideration","occurredAt":"2026-08-19T00:28:57.224Z","createdAt":"2026-08-19T00:28:57.224Z"},{"id":"35e834d7-f7a4-4825-9194-ef9e93f2f7ca","dataCenterId":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"utility: NYISO","occurredAt":"2026-08-17T20:22:30.660Z","createdAt":"2026-08-17T20:22:30.660Z"},{"id":"2cf0ec71-87eb-4f05-9be2-ce16c6968653","dataCenterId":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","eventType":"party_added","series":null,"oldValue":null,"newValue":null,"claimId":null,"detail":"developer: TeraWulf Inc.","occurredAt":"2026-08-17T20:22:29.859Z","createdAt":"2026-08-17T20:22:29.859Z"},{"id":"02abf6c9-112b-4140-b554-70c2032d6a18","dataCenterId":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","eventType":"capacity_changed","series":"under_construction","oldValue":null,"newValue":"0.138","claimId":"4c6d8c65-9878-4057-9d4a-2fa0dc741d4e","detail":null,"occurredAt":"2026-08-17T20:22:29.238Z","createdAt":"2026-08-17T20:22:29.238Z"},{"id":"d2037095-5769-4329-8757-27adac77c761","dataCenterId":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","eventType":"claim_recorded","series":"under_construction","oldValue":null,"newValue":"0.138","claimId":"4c6d8c65-9878-4057-9d4a-2fa0dc741d4e","detail":"reported · earnings_call","occurredAt":"2026-08-17T20:22:29.083Z","createdAt":"2026-08-17T20:22:29.083Z"},{"id":"b37d8229-f9c4-4ce6-b78b-34b248d411c5","dataCenterId":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","eventType":"capacity_changed","series":"announced","oldValue":null,"newValue":"0.4","claimId":"0b618837-3739-4c8f-817a-63b19d858574","detail":null,"occurredAt":"2026-08-17T20:22:28.398Z","createdAt":"2026-08-17T20:22:28.398Z"},{"id":"0544ef7c-d372-4bd4-8319-8118aaddedc9","dataCenterId":"bfb3c5e7-fd63-4901-a271-d8a1a11aa7ba","eventType":"claim_recorded","series":"announced","oldValue":null,"newValue":"0.4","claimId":"0b618837-3739-4c8f-817a-63b19d858574","detail":"verified · sec_filing","occurredAt":"2026-08-17T20:22:28.246Z","createdAt":"2026-08-17T20:22:28.246Z"}],"capacity_picture":{"announced_gw":0.4,"contracted_gw":null,"under_construction_gw":0.138,"energized_gw":null,"announced_minus_energized_gw":0.4,"by_series":{"announced":{"valueGw":0.4,"asOf":"2026-03-31T00:00:00.000Z","evidenceTier":"verified","sourceUrl":"https://www.sec.gov/Archives/edgar/data/0001083301/000108330126000092/wulf-20260331.htm"},"contracted":null,"under_construction":{"valueGw":0.138,"asOf":"2026-02-26T00:00:00.000Z","evidenceTier":"reported","sourceUrl":"https://www.globenewswire.com/news-release/2026/02/26/3246105/0/en/TeraWulf-Reports-Fourth-Quarter-and-Full-Year-2025-Results.html"},"energized":null}},"jsonLd":{"@context":"https://schema.org","@type":"Place","name":"Cayuga Data Campus","url":"https://registry.deploy.report/datacenters/terawulf-cayuga-lansing-new-york","geo":{"@type":"GeoCoordinates","latitude":42.5479,"longitude":-76.5988},"address":{"@type":"PostalAddress","addressLocality":"Lansing"}}}