# GMI Cloud Taiwan AI Factory (Taoyuan)

AI data center campus tracked on DEPLOY: announced-vs-energized capacity, each figure dated and sourced.

- **Canonical ID:** ff470a39-3010-4b20-99dd-e0585700574a
- **Type:** AI data center campus
- **Operator / developer:** [GMI Cloud](/companies/gmi-cloud.md)
- **Location:** Taoyuan, Taiwan
- **Lifecycle state:** under_construction
- **Announced capacity (GW):** 0.016

## Capacity ledger (append-only, dated, sourced)

- announced: 0.016 GW · reported · as of 2025-11-17 · https://www.prnewswire.com/news-releases/gmi-cloud-to-launch-next-gen-ai-factory-in-taiwan-with-nvidia-to-power-the-future-of-ai-infrastructure-in-asia-302616532.html

## Parties

- GMI Cloud (operator): https://registry.deploy.report/companies/gmi-cloud

## Common questions


**What is GMI Cloud Taiwan AI Factory (Taoyuan)?**

GMI Cloud Taiwan AI Factory (Taoyuan) is an AI data center campus tracked on the DEPLOY registry, located in Taoyuan, Taiwan. DEPLOY records its capacity as a dated, sourced ledger: announced gigawatts versus actually energized gigawatts, never a press-release total.

**How much power will GMI Cloud Taiwan AI Factory (Taoyuan) use?**

GMI Cloud Taiwan AI Factory (Taoyuan) has 0.02 GW of announced capacity on the DEPLOY registry; no energized capacity is yet recorded. Each figure is individually dated and sourced.

**Who is building GMI Cloud Taiwan AI Factory (Taoyuan)?**

GMI Cloud is recorded as a party to GMI Cloud Taiwan AI Factory (Taoyuan) on the DEPLOY registry. The full party list, with each role, is on the record.

**Is GMI Cloud Taiwan AI Factory (Taoyuan) operating yet?**

As of the most recent verification on the DEPLOY registry, GMI Cloud Taiwan AI Factory (Taoyuan) is under construction. DEPLOY tracks the lifecycle from announced through energized, so the current state reflects sourced evidence, not the original announcement.

**How verified is the data on GMI Cloud Taiwan AI Factory (Taoyuan)?**

A human editor has reviewed this record for the indexed registry. Every capacity figure is an append-only, dated claim resolved to the highest-evidence tier; superseded claims are kept but excluded from the current view.

## Sources

- GMI Cloud to Launch Next-Gen AI Factory in Taiwan with NVIDIA: https://www.prnewswire.com/news-releases/gmi-cloud-to-launch-next-gen-ai-factory-in-taiwan-with-nvidia-to-power-the-future-of-ai-infrastructure-in-asia-302616532.html
- GMI Cloud plans AI factory in northern Taiwan amid grid challenges: https://www.digitimes.com/news/a20251120PD207/cloud-taiwan-data-center-electricity-startup.html

Canonical: https://registry.deploy.report/datacenters/gmi-cloud-taiwan-ai-factory-taoyuan
JSON: https://registry.deploy.report/v1/datacenters/gmi-cloud-taiwan-ai-factory-taoyuan
